Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹42.9 L+₹11.0 L (34.5%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹46.1 L+₹14.3 L (44.7%)Rejected-AOC 252 ANGAPPA NAICKEN STREET CHENNAI CHENNAI TAMIL NADU 600001 | CHENNAI | TAMIL NADU | 600001 | L3 | Rejected-AOC L3 |
Tender Value
₹34.5 L
EMD Value
₹68,980
Closing Date
21 Jan 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager HWPM
Heavy Water Plant Manuguru, Gautami Nagar, Aswapuram, Bhadradri Kothagudem District, Telangana State -507116
In services Inspections during MTA 2022 at HWP Manuguru including ECT LPT WFMPT UT Thickness UT Flaw detection Hardness and PAUT
2023_HWB_732448_1
HWPM/ES/NDT/MTA-2022-R2
Open Tender
Miscellaneous Works
Item Rate
45 days
Heavy Water Plant, Manuguru Bhadradri Kothagudem
As per Tender document
7 documents required · 7 mandatory
₹0
₹68,980
Heavy Water Plant Manuguru
10 Mar 2023
4 Jan 2023
27 Jan 2023
4 Jan 2023
21 Jan 2023
4 Jan 2023
4 Jan 2023 - 6 Jan 2023
6 Jan 2023
Amount
Eddy Current Testing of shell & tube type heat exchangers tubes made of SS A 312 TP 316 L of size OD ; 20 mm & tube thickness :1.65 mm , length range : 3-10 meters scanning by using differential coil bobbin probe system with ECT equipment of MS-5800-E (Olympus make) (or) equivalent technology resolution with suitable extension cable for probe; accurately inspecting the tube ID and OD pitting, baffle cutting, erosion, general wall losses and other defects in heat exchanger tubes. The data acquisition, interpretation and analysis through multi-view software and carto lite tube sheet mapping software or equivalent. The execution of job with qualified ASNT/ISNT Level-II/III personal for carrying out the ECT Scanning / Interpretation / Submission of reports as per HWPM approved procedure/ ASME - Section V article 8 / ASME Section-XI. The job should be carried out in 30 days with three parallel ECT machines and NDT qualified personnel. The calibration tube and suitable probes shall be arranged by contractor along with the above facility.
(ST-1) Liquid penetrant testing of weldments on Pressure vessels, shell skirt joints, stiffener ring of XU towers, small & large dia gas pipe lines of size 2” to 36” NB (including supply of consumables and DP Kits) by ASNT/ISNT LPT level-II qualified & experienced persons including surface preparation with pre & post cleaning of weldments. LPT has to be done as per HWP (M) approved procedures and Evaluation & submission of reports in accordance with HWP (M) approved procedures & ASME Sec-V Article-6.
Wet magnetic fluorescent particle testing (WFMPT) of tower site weld joints by using AC/DC yoke method of Magnaflux or reputed make & by qualified and experienced MPT Level-II personnel including surface preparation with pre & post cleaning of weldments (demagnetization etc.) internal vessel/Towers . The WFMPT has to be done and Evaluation & submission of reports in accordance with HWP (M) approved procedures and as per ASME section-V Article-7.
UT thickness measurements & mapping on towers / vessels by using 38DL plus of Olympus make instrument along with high temperature probing up to 3500C with suitable couplant and instrument with inbuilt temperature compensation feature for accuracy in thickness measurement through coat technology along with ASNT / ISNT UT Level-II qualified personnel of two teams. The job includes corrosion monitoring locations [CML] pocket windows of 150x150mm size opening, surface preparation, thickness measurement, post cleaning and re-fixing of CML pocket windows properly and submission of final reports by qualified personnel reports in accordance with HWP (M) approved procedures.
Ultrasonic flaw detection examination of welds including HAZ area on CS/SS towers skirts, critical welds of XU towers and large dia. gas pipe lines with UT by using KRAUTKRAMER/ SONATEST/ Olympus Epoch 600 make or equivalent UT flaw detectors with same make probes by ASNT/ISNT UT level-II / III qualified & experienced persons. The job includes surface preparation with pre/post cleaning of weldments. UT scanning by pulse-echo method, Evaluation & submission of reports in accordance with HWP (M) approved procedures & ASME Sec-V Article-4.
Phased array : PAUT C-scanning of XU- towers surfaces/ large dia gas piping surfaces externally corrosion mapping by using Olympus OMINISCAN MX technology or equivalent along with accessories & execution by ASNT/ ISNT level-II/III UT qualified & experienced in corrosion mapping. Surface preparation & online PAUT C-Scanning wherever necessary, interpretation of results and report submission. The job also includes surface preparation with pre/post cleaning. Finally executing the job with Phased array C-Scan through TOMO view software and for interpretation of results, the reports and shall inferred as per ASME Sec-XI, DIV - I, For Class-II components criteria.
VIBRANT NDT SERVICES
Arudra Engineers Pvt Ltd
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .