Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹22.7 LAccepted-Finance | ₹22.7 L | 1 | Accepted-Finance As per Evaluation Committee |
| 2 | 2₹62.0 L+₹39.3 L (172.8%)Rejected-Finance | ₹62.0 L+₹39.3 L (172.8%) | 2 | Rejected-Finance As per Evaluation Committee |
Tender Value
Refer Docs
EMD Value
₹53,150
Closing Date
5 Aug 2022, 2:30 pmClosed
Divisional Engineer
O/o Divisional Engineer, Transmission Projects, C.T.O.Compound, Velempeta, Visakhapatnam-530001
Optical Fiber Cable Construction work (Laying PLB pipe/ Duct and Associated works by Open Trench Method/Trenchless Technology(HDD), Optical Fiber Cable Pulling/Blowing works etc.,
2022_BSNL_122521_1
DE/TP/VM/G-1/XI/2022-23/787 Dt.15-07-2022
Open Tender
OFC Laying Works
Works
49 days
Visakhapatnam
As per Tender Schedule
3 documents required · 3 mandatory
₹590
Yes
AO(C and C), O/o GMM STR Hyderabad
₹53,150
Yes
31 Jan 2023
15 Jul 2022
6 Aug 2022
15 Jul 2022
5 Aug 2022
15 Jul 2022
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .