Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-Finance | ₹1.9 L | L1 | Accepted-Finance Financial Summary |
| 2 | L2₹2.0 LAccepted-Finance | ₹2.0 L | L2 | Accepted-Finance Financial Summary |
| 3 | L3₹2.0 LAccepted-Finance | ₹2.0 L | L3 | Accepted-Finance Financial Summary |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
2 Aug 2021, 12:00 pmClosed
E.E., E.T.D.-II, Bareilly
Hydle Colony, Rampur Garden, Bareilly
Carriage of 20MVA (BHEL Make) Transformer at 132KV Sub Station Faridpur, its Carriage from 132KV Sub Station Faridpur to 132KV Sub Station Bisalpur alongwith other associated Works under E.T.D.-II, Bareilly
2021_UPTCL_606483_1
Very S Term E-Tender No/ 06 /ETD-II / (B) /2021-22
Open Tender
Electrical Works
10 days
Bisalpur
Please Refer In Tender Documents
2 documents required · 2 mandatory
₹590
Ac No 0043002100061489 IFSC PUNB0004300
₹2,000
4 Aug 2021
27 Jul 2021
2 Aug 2021
27 Jul 2021
2 Aug 2021
27 Jul 2021
Amount
Carriage of 20MVA T/F (BHEL make) from 132KV Sub Station Faridpur to 132KV Sub Station Bisalpur alongwith other associated Works, with all cost of Men, Materials, Misc. Consumables, Trailer / Trucks, Crane / Hydra, T&Ps etc. required for satisfactory completion of the Job, as per Technical Specifications & direction of the Supervising Engineer, as per details below :
Shifting of Main Tank of the 20MVA T/F (BHEL make) from Storage Place at 132KV Sub Station Faridpur upto 20 Meter distance including Turning of the Tank, if required.
Loading of Main Tank of the above 20MVA T/F alongwith associated accessories like Conservator Tank, Radiators, Bushings, Turrets, T/F Oil in Drums, OLTC Panel etc. on Trailer / Trucks at 132KV Sub Station Faridpur. The job includes Jacking the T/F Tank for placing the Wooden Sleeper and simultaneously Lifting the Tank by Jacking & Placing Sleepers continuously under the Tank till the Wooden Sleepers Platform comes upto height of Trailer Bed and then Placing the Rails over the Trailer Bed & Wooden Sleeper Platform and Shifting the Tank on the Trailer Bed. Finally, Removal of the Rails etc. from under the Tank and then, properly Securing / Lacing the Tank with the help of Steel Wire Ropes and Turn Buckles for Safe Transportation of the T/F Tank.
Safe Carriage of all Accessories, T/F Oil & Bushings of the above 20MVA T/F Loaded on Trailer / Trucks (Trailer / Trucks to be arranged by the Contractor) from 132KV Sub Station Faridpur to 132KV Sub Station Bisalpur. (Distance approx. 40 Km).
Unloading of the above 20MVA T/F from Trailer with the help of Hydraulic Jacks, Wooden Sleeper Platform & Rails etc. The job includes Making of Wooden Sleeper Platform upto height of Trailer Bed, Opening the Laces, Jacking the T/F Tank & Placing the Rails under the Tank Loaded on Trailer, Shifting the Tank on the Wooden Sleeper Platform, Jacking the Tank for Removing the Rails from under the T/F Tank, Lowering the Tank towards Ground by Removing the Wooden Sleepers under the Tank layer by layer, then Placing the Rails under the Tank for Stacking / Placing the T/F Tank on Rails. Also, unloading of the various accessories of the above Transformer like Conservator Tank, Radiators, Bushings, Turrets, T/F Oil in Drums, OLTC Panel etc. from Trucks / Trailer at suitable unloading place at 132KV Sub Station Bisalpur .
M/S SATKAR TRADERS
M/s S.S. Refregeration
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid