Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.3 LAccepted-AOC KALIJHORA KALIJHORA BAZAR KALIJHORA BAZAR KALIJHORA BAZAR DARJEELING WEST BENGAL 734008 | DARJEELING | WEST BENGAL | 734008 | ₹45.3 L Quoted ₹45.4 L | L1 | Accepted-AOC Awarded to Lowest contractor |
| 2 | L2₹50.5 L+₹5.0 L (11.1%)Rejected-Finance | ₹50.5 L+₹5.0 L (11.1%) | L2 | Rejected-Finance other than lowest bidder |
| 3 | L3₹53.2 L+₹7.7 L (17.1%)Rejected-Finance | ₹53.2 L+₹7.7 L (17.1%) | L3 | Rejected-Finance other than lowest bidder |
| 4 | L4₹53.7 L+₹8.3 L (18.3%)Rejected-Finance H NO 3152 PANDOH TEHSIL SADAR DISTT MANDI H P | PANDOH | MANDI | HIMACHAL PRADESH | 175001 | ₹53.7 L+₹8.3 L (18.3%) | L4 | Rejected-Finance other than lowest bidder |
| Sl No | Description | Qty | Unit | Royal Construction Company L1 | ASHEESH DEV L2 | SERAJ CONSTRUCTION L3 | APPLEBEE SYSTEMS PVT LTD L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches etc.in earth work in all kind of soil such as pick work, jumper work, saturated soil including bailing or pumping out water, blasting soft./hard rock, chiselling soft/.hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, levelling of bed, stacking the excavated soil clear from the edge of excavation and then returning the excavated soil in 15cm. layers including consolidating each deposited layer by ramming , watering and then disposing of all surplus excavated soil as directed in all leads/lifts and shoring, strutting, timbering and dewatering where ever required as complete in all respects as per the direction and to the entire satisfection of the Engineer-in-charge in all lead and lift. | 4,291.06 | Cum | 398 ₹17,07,841.88 | 250 ₹10,72,765 Lowest | 405 ₹17,37,879.3 | 399 ₹17,12,132.94 |
| 2.00 | Providing and laying cement concrete 1:4:8 (1cement:4 sand:8 crushed stone agg.40mm nominal size) and curing complete excluding cost of form work in foundation and plinth complete in all respects as per the direction and to the entire satisfection of the Engineer-in-charge in all lead and lift. | 10.88 | Cum | 2,400 ₹26,112 Lowest | 8,900 ₹96,832 | 9,240 ₹1,00,531.2 | 9,500 ₹1,03,360 |
| 3.00Providing and laying cement concrete 1:1.5:3(1cement:1.5 sand:3 crushed stone agg.20mm nominal size ) & curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:- | |||||||
| 3.01 | In foundation and plinth complete in all respects as per the direction and to the entire satisfection of the Engineer-in-charge in all lead and lift. . | 17.68 | Cum | 4,200 ₹74,256 Lowest | 10,000 ₹1,76,800 | 10,420 ₹1,84,225.6 | 10,500 ₹1,85,640 |
| 4.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centring, shuttering ,strutting and propping etc. with wooden battens and ballies height of propping and centring below supporting floor to ceiling in all heights and removal of the same for insitu reinforced concrete and plain concrete workin:- | |||||||
| 4.01 | Vertical surfaces such as walls(any thickness) partions and the like including attached pillasters,buttresses plinth and string courses and the like complete in all respects as per the direction and to the entire satisfection of the Engineer-in-charge in all lead and lift. . | 87.04 | Sqm. | 150 ₹13,056 Lowest | 390 ₹33,945.6 | 335 ₹29,158.4 | 390 ₹33,945.6 |
| 5.00 | Providing tor steel reinforcement for RCC work including bending, binding and placing in position complete up to floor two levelcomplete in all respects as per the direction and to the entire satisfection of the Engineer-in-charge in all lead and lift. . | 1,591.2 | Kg | 70 ₹1,11,384 Lowest | 84 ₹1,33,660.8 | 79 ₹1,25,704.8 | 88 ₹1,40,025.6 |
| 6.00Providing and Laying (to level or slope)and jointing and testing reinforced concrete pipe light duty non pressure pipes IS class of following internal diameter with collars and butt ends prepared for collar joints including testing of joints complete in all leads and lifts. | |||||||
| 6.01 | RCC Pipe 900 mm dia Class NP2 complete in all respects as per the direction and to the entire satisfection of the Engineer-in-charge in all lead and lift. . | 85 | Rmt | 1,850 ₹1,57,250 Lowest | 5,000 ₹4,25,000 | 4,350 ₹3,69,750 | 5,000 ₹4,25,000 |
| 6.02 | RCC Pipe 350 mm dia Class NP2 complete in all respects as per the direction and to the entire satisfection of the Engineer-in-charge in all lead and lift. . | 44.2 | Rmt | 1,250 ₹55,250 Lowest | 1,400 ₹61,880 | 1,275 ₹56,355 | 1,390 ₹61,438 |
Tender Value
₹68.6 L
EMD Value
₹1.3 L
Closing Date
27 Jul 2026, 10:00 amClosed
Executive Engineer Jal Shakti Division Thunag
O/O Executive Engineer Jal Shakti Division Thunag Distt Mandi HP
Laying, Jointing and Testing of HDPE Pipes in Distritution system at various locations and various dia and CO Hydrant post 68 Nos. 1st Phase 2nd Phase Haleen, Balaindha Tungadhar
2026_HPIPH_139349_2
2268-2308 DT 17/07/2026
Open Tender
Civil Works - Water Works
Item Rate
Thunag
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,000
Yes
₹1.3 L
Yes
21 Aug 2026
18 Jul 2026
27 Jul 2026
18 Jul 2026
27 Jul 2026
18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation and trenches etc.in earth work in all kind of soil such as pick work, jumper work, saturated soil including bailing or pumping out water, blasting soft./hard rock, chiselling soft/.hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, levelling of bed, stacking the excavated soil clear from the edge of excavation and then returning the excavated soil in 15cm. layers including consolidating each deposited layer by ramming , watering and then disposing of all surplus excavated soil as directed in all leads/lifts and shoring, strutting, timbering and dewatering where ever required as complete in all respects as per the direction and to the entire satisfection of the Engineer-in-charge in all lead and lift. | 4,291.06 | Cum | - | - |
| 2 | Providing and laying cement concrete 1:4:8 (1cement:4 sand:8 crushed stone agg.40mm nominal size) and curing complete excluding cost of form work in foundation and plinth complete in all respects as per the direction and to the entire satisfection of the Engineer-in-charge in all lead and lift. | 10.88 | Cum | - | - |
| 3Providing and laying cement concrete 1:1.5:3(1cement:1.5 sand:3 crushed stone agg.20mm nominal size ) & curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:- | |||||
| 3.01 | In foundation and plinth complete in all respects as per the direction and to the entire satisfection of the Engineer-in-charge in all lead and lift. . | 17.68 | Cum | - | - |
| 4Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centring, shuttering ,strutting and propping etc. with wooden battens and ballies height of propping and centring below supporting floor to ceiling in all heights and removal of the same for insitu reinforced concrete and plain concrete workin:- | |||||
| 4.01 | Vertical surfaces such as walls(any thickness) partions and the like including attached pillasters,buttresses plinth and string courses and the like complete in all respects as per the direction and to the entire satisfection of the Engineer-in-charge in all lead and lift. . | 87.04 | Sqm. | - | - |
| 5 | Providing tor steel reinforcement for RCC work including bending, binding and placing in position complete up to floor two levelcomplete in all respects as per the direction and to the entire satisfection of the Engineer-in-charge in all lead and lift. . | 1,591.2 | Kg | - | - |
| 6Providing and Laying (to level or slope)and jointing and testing reinforced concrete pipe light duty non pressure pipes IS class of following internal diameter with collars and butt ends prepared for collar joints including testing of joints complete in all leads and lifts. | |||||
| 6.01 | RCC Pipe 900 mm dia Class NP2 complete in all respects as per the direction and to the entire satisfection of the Engineer-in-charge in all lead and lift. . | 85 | Rmt | - | - |
| 6.02 | RCC Pipe 350 mm dia Class NP2 complete in all respects as per the direction and to the entire satisfection of the Engineer-in-charge in all lead and lift. . | 44.2 | Rmt | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.46 MB
form6.pdf
Tender Documents • 0.88 MB
form8.pdf
Tender Documents • 1.18 MB
tc.pdf
Tender Documents • 0.24 MB
BOQ_206481.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .