| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹1.2 CrAccepted-AOC 37 CENTRAL ROAD AGARTALA | AGARTALA | WEST TRIPURA | TRIPURA | ₹1.2 Cr | l1 | Accepted-AOC l1 |
| 2 | l2₹1.3 Cr+₹8.8 L (7.14%)Accepted-AOC AMARPUR GOMATI TRIPURA | AMARPUR | GOMATI | TRIPURA | ₹1.3 Cr+₹8.8 L (7.14%) | l2 | Accepted-AOC l2 |
| 3 | l3₹1.3 Cr+₹9.8 L (8.00%)Accepted-AOC DHARMANAGAR TRIPURA WEST | ₹1.3 Cr+₹9.8 L (8.00%) | l3 | Accepted-AOC l3 |
| 4 | l4₹1.3 Cr+₹11.7 L (9.51%)Accepted-AOC COLLEGE CHOWMUHANI JIRANIA WEST TRIPURA | ₹1.3 Cr+₹11.7 L (9.51%) | l4 | Accepted-AOC l4 |
| 5 | l5₹1.5 Cr+₹27.2 L (22.1%)Accepted-AOC | ₹1.5 Cr+₹27.2 L (22.1%) | l5 | Accepted-AOC l5 |
Tender Value
₹1.6 Cr
EMD Value
₹2.7 L
Closing Date
17 Apr 2025, 5:00 pmClosed
DGM, ED-Panisagar
ED Panisagar
Electrification of un-electrified Households and Public Places under DA-JGUA Scheme in North Tripura District of Tripura State
2025_POWER_59955_2
DGM/ED-PNS/NIT/2024-25/11
Open Tender
Electrical Works
Works
Ed Panisagar
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
Yes
₹2.7 L
Yes
10 May 2025
9 Apr 2025
17 Apr 2025
9 Apr 2025
17 Apr 2025
9 Apr 2025
9 Apr 2025 - 16 Apr 2025
Amount
SCHEDULE - A Supply
Installation of 25 KVA Distribution Transformer on Steel Tubular Pole (9 Nos).
9 mtr. Long PCC Pole
Transformer 25 KVA 11/0.4kv (2/1971)
M.S. Channel (100x50x50x6mm)
M.S. Channel (75x40x40x6mm)
M.S.angle (65x65x6mm)
Stay set complete HT (GI)
G.I. Stranded wire ( 7/4mm)
11KV Polymer Disc insulator
11KV Disc fitting
11KV Polymer Pin insulator
Stay insulator (11 KV)
ACSR conductor (6/1/2.59mm)(1/1971)
Earthing pipe ( 2.5 mtr long 40mm dia G.I.pipe)
60 Kg Salt & 55 Kg Charcoal for each earthing
11KV G.O.switch (3 phase)
11kv D.O.fuse (3 phase)
Lightning arrester (10/1976)
Straining screw
MS Clamp for bracket & stay set
MS Nuts & Bolts for bracket & stay set
Cut out 100 Amps
Bimetallic Lugs (70 sqmm.)
D T Metering Three Phase
Wooden Plank (Hard) - 12" X 10" X 1" (Inch) L.S
3 phase LT Distribution Box (418 X 300 X 120) mm inc. Incoming 4C X 35 sq.mm , outgoing 4 Nos 4C X 16 sq.mm Cable
11KV Line on PCC & Steel Tubular Pole With ACSR WEASEL Conductor (6/1/2.59 mm) (7.04 Km).
9 Mtr. Long PCC pole.
9 Mtr. Long ST pole.(GI/Half GI)
M.S. Channel (75x40x40x6mm)
M.S.angle (65x65x6mm)
Stay set complete HT (GI)
G.I. Stranded wire ( 7/4mm)
11KV Polymer Disc insulator
11KV Disc fitting
11KV Polymer Pin insulator
Stay insulator (11 KV)
ACSR conductor (6/1/2.59mm)(1/1971)
MS Clamp for bracket , stay set, earthing etc
MS Nuts & Bolts for bracket , stay set, earthing
3 Phase LT Line on A.B.CABLE (3 Km).
8mtr. Long PCC Pole
8mtr. Long Steel Tubular Pole(GI/Half GI)
Stay set complete LT(GI)
G.I. Stranded wire ( 7/4mm)
L.T stay Insulator (21/1981)
MS Clamp for bracket & stay set
MS Nuts & Bolts for bracket & stay set
Supply of 3X25+1X16+1X25 sq.mm LT AB cable
Suspension clamp
Dead end clamp
Service anchor clamp
Cable end cap
Cable Ties
Insulating Piercing Connector
Pole clamp
3 phase LT Distribution Box (418 X 300 X 120) mm inc. Incoming 4C X 35 sq.mm , outgoing 4 Nos 4C X 16 sq.mm Cable
Spike Earthing 20 mm solid Rod
Galvanised Eye hook i/c clamps,Nuts & Bolts, washer etc.
1 Phase LT Line on A.B.CABLE :- (18.985 Km).
8mtr. Long PCC Pole
8mtr. Long Steel Tubular Pole (GI/Half GI)
Stay set complete LT (GI)
G.I. Stranded wire ( 7/4mm)
L.T stay Insulator (21/1981)
MS Clamp for bracket & stay set
MS Nuts & Bolts for bracket & stay set
Supply of 1X25+1X16+1X25 sq.mm LT AB cable
Suspension clamp
Dead end clamp
Service anchor clamp
Cable end cap
Cable Ties
Insulating Piercing Connector
Pole clamp
1 phase LT Distribution Box (225 X 285 X 120) mm inc. Incoming 2C X 25 sq.mm , outgoing 8 Nos 2C X 10 sq.mm Cable
Spike Earthing 20 mm solid Rod
Galvanised Eye hook i/c clamps,Nuts & Bolts, washer etc.
Domestic Service Connection (452 Nos).
1.1KV PVC 2.5 Sq.mm., 1 Core Cable (Service Wire)
G.I. Wire 10SWG (for Service Connection)
Reel Insulator
Single Phase Energy Meter
Cut Out 16 Amps.
8"x12" Wooden Board
Coil Earthing including making of pit, refilling, fabrication, erection, connection etc. as required with supply of salt, charcoal, PVC pipe 3 mtr. Long to cover earth wire above ground level excluding supply of G.I. Wire.
SCHEDULE -C Erection
Installation of 25 KVA Distribution Transformer on Steel Tubular Pole (9 Nos).
9 mtr. Long PCC Pole
Transformer 25 KVA 11/0.4kv (2/1971)
M.S. Channel cross-arm (100x50x50x6mm) 2.8 mtr long duly galvanised as per relevant I.S.
M.S. Channel cross-arm (75x40x40x6mm) 2.8 mtr long duly galvanised as per relevant I.S.
M.S.angle cross-arm (65x65x6mm) 2.8mtr. Long duly galvanised as per relevant I.S.
M.S.channel cross-arm (100x50x50x6mm) 0.8 mtr. Long duly galvanised as per relevant I.S.
Stay set complete (GI)
11KV Polymer Disc insulator with fitting (3/19)
11KV Polymer Pin insulator with G.I.pin(3/1971)
ACSR conductor (6/1/2.59mm)(1/1971)
8 SWG G.I. wire (45/1987)
Earthing pipe ( 2.5 mtr long 40mm dia G.I.pipe)
Barbed wire for anti climbing device
Danger plate for 11kv (57/1988)
11KV G.O.switch (3 phase)
11kv D.O.fuse (3 phase)
Lightning arrester (10/1976)
Straining screw
Wooden Plank (Hard) - 12" X 10" X 1" (Inch) L.S.
D T Metering Three Phase
Erection of 3 phase LT Distribution Box (inc. Incoming 4C X 25 sq.mm , outgoing 4 Nos 4C X 16 sq.mm Cable
Febrication of X-arm by M.S. Channel/Angle
Construction of 3-Phase 11KV Line on PCC & Steel Tubular Pole With ACSR WEASEL Conductor (6/1/2.59 mm) (7.04 Km).
Erection of 9 mtr, long PCC Pole
Erection of 9 mtr, long ST Pole (Galvanised/ Half Galvanised))
Erection of S.P top bracket. 0.3 mtr long (Ch. 75x40).
Erection of S.P. bottom bracket, 1.1 mtr long (Ch. 75x40).
Erection of S.P guard bracket, 1.3 mtr long (65x65).
Erection of DP top bracket, 1.7 mtr. Long (Ch. 75x40)).
Erection of DP Bottom bracket, 2.2mtr. Long (Ch. 75x40)).
Erection of DP guard bracket, 2.5mtr. Long (Angle 65x65).
1.7 mtr. Long cross arm for tapping (Ch. 75x40)
2.0 mtr. Long cross arm for tapping (Ch. 65x65)
Erection of stay set direct in earth in normal soil.(G.I)
Erection of 11kv Disc Insulator with fitting.
Erection of 11kv Pin Insulator with G.I.pin.
Erection of ACSR conductor (6/1/2.59) i/c laying, hoisting & binding, jointing sleeve etc. as required.
Erection of G.I. wire i/c laying, hosting & binding etc. as required.
Febrication of X-arm by M.S. Channel/Angle
Construction of 3 Phase LT Line on A.B.CABLE :- (3 Km).
Erection of 8mtr. Long Steel Tubular Pole (GI/Half GI))
Erection of 8mtr. Long PCC Pole
Erection of stay set direct in earth in normal soil(GI)
Erection of 3X25+1X16+1X25 sq.mm LT AB cable with all nacessary accossaries
Erection of 3 phase LT Distribution Box (inc. Incoming 4C X 25 sq.mm , outgoing 4 Nos 4C X 16 sq.mm Cable
Erection of Spike Earthing 20 mm solid Rod
8 SWG G.I. wire (45/1987)
Construction of 1 Phase LT Line on A.B.CABLE :- (18.985 Km)
Erection of 8mtr. Long Steel Tubular Pole (GI/Half GI))
Erection of 8mtr. Long PCC Pole
Erection of stay set direct in earth in normal soil.
Erection of 1X25+1X16+1X25 sq.mm LT AB cable with all nacessary accossaries
Erection of 1 phase LT Distribution Box (225 X 285 X 120) mm inc. Incoming 2C X 25 sq.mm , outgoing 8 Nos 2C X 10 sq.mm Cable
Erection of Spike Earthing 20 mm solid Rod
8 SWG G.I. wire (45/1987)
Jungle cutting
Service Connection, Erection of Materials and equipment, Erection cost of each Service
UTTAM NAG (BID ID -172827)
Md Abul Hussain (BID ID -172487)
Asish Debnath (BID ID -172306)
THE TRIPURA ELECTRICAL HOUSE (BID ID -172380)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .