Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹70.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹75.5 L+₹4.8 L (6.72%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹75.7 L+₹4.9 L (6.97%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹76.1 L+₹5.3 L (7.50%)Admitted-Finance HOUSE NO 49 SECTOR 28 FARIDABAD 121008 HR | FARIDABAD | FARIDABAD | HARYANA | 121008 | L4 | Admitted-Finance | |
| 5 | L5₹80.2 L+₹9.5 L (13.4%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AMAAN ENGINEERS L1 | M/S Behl Sons L4 | M/S ASHRAF HUSSAIN L3 | M/S Ghulam Mustafa L2 | M/S MOHD HASSAN L6 | M/S LIAQAT ALI KHAN L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Repair to potholes any depth, not exc 1 sq m each including sweeping free from dust and mud, or water, scoring sunken surfaces in roads, paths, etc. cutting around edges to at least 25 mm in depth, making good by applying tack coat @ 5 kg per 10 sq m, putting in premixed bituminous macadam, well rammed and sealed with binder 9.8 kg per 10 sq m, blinded with 0.09 cu m of stone chippings, 6.3 mm size and again well rammed (including supply of premixed macadam, binder and chippings) depth of potholes exc 30 mm. | 1.5 | 10 SQM | 4,500 ₹6,750 | 3,600 ₹5,400 | 3,500 ₹5,250 Lowest | 4,600 ₹6,900 | 5,000 ₹7,500 | 4,800 ₹7,200 |
| 2.00 | Preparing surfaces unsurfaced water macadam by brushing with wire brushes for removing caked mud etc sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc all as spd and directed | 50 | 10 SQM | 25 ₹1,250 Lowest | 100 ₹5,000 | 80 ₹4,000 | 30 ₹1,500 | 50 ₹2,500 | 40 ₹2,000 |
| 3.00 | Applying evenly a priming/tack coat with bituminous primer using paving bitumen (Viscosity Grade - 10) VG-10 @ 10 kg/10sqm complete all as specified and directed. | 50 | 10 SQM | 520 ₹26,000 Lowest | 660 ₹33,000 | 650 ₹32,500 | 550 ₹27,500 | 700 ₹35,000 | 650 ₹32,500 |
| 4.00 | M&L premix bituminous macadam laid/rolled and compacted to required gradient and camber(consolidated thickness 75mm or less) etc 4.0% binder content of paving bitumen VG-30 by weight of total mix rolled and compacted mixed in mechanical hot mixed plant and premixed material laid with mechanical paver finished including rolling to required camber and gradient with 8 to 12 tone power roller to required compaction complete all as specified and as directed | 25 | Cubic Metre | 10,500 ₹2,62,500 | 13,050 ₹3,26,250 | 13,000 ₹3,25,000 | 11,000 ₹2,75,000 | 1,600 ₹40,000 | 1,500 ₹37,500 Lowest |
| 5.00 | Preparing surfaces black top by brushing with wire brushes for removing caked mud etc sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc all as spd and directed | 410 | 10 SQM | 25 ₹10,250 Lowest | 85 ₹34,850 | 80 ₹32,800 | 30 ₹12,300 | 50 ₹20,500 | 40 ₹16,400 |
| 6.00 | Applying evenly a priming/tack coat with bituminous primer using paving bitumen (Viscosity Grade - 10) VG-10 @ 2.5 kg/10sqm complete all as specified and directed. | 50 | 10 SQM | 250 ₹12,500 Lowest | 310 ₹15,500 | 300 ₹15,000 | 300 ₹15,000 | 500 ₹25,000 | 400 ₹20,000 |
| 7.00 | Applying evenly a priming/tack coat with bituminous primer using paving bitumen (Viscosity Grade - 10) VG-10 @ 5 kg/10sqm complete all as specified and directed. | 410 | 10 SQM | 350 ₹1,43,500 Lowest | 555 ₹2,27,550 | 550 ₹2,25,500 | 400 ₹1,64,000 | 600 ₹2,46,000 | 500 ₹2,05,000 |
| 8.00 | Bituminous premix asphaltic semi dense concrete 40 mm thick consolidated thickness with 5.5% binder content of paving bitumen VG-30 by weight of total mix rolled and compacted mixed in mechanical hot mixed plant and premixed material laid with mechanical paver finished including rolling to required camber and gradient with 8 to 12 tone power roller including preparation bitumen carpet in digital computarised weigh batch hot mix plant including preparation to required compaction complete all as specified and as directed. | 461.5 | 10 SQM | 6,900 ₹31,84,350 Lowest | 7,820 ₹36,08,930 | 7,800 ₹35,99,700 | 7,100 ₹32,76,650 | 7,500 ₹34,61,250 | 7,300 ₹33,68,950 |
| 9.00 | M&L for preparation new/old black top surface road surface and applying one coat of retro reflective thermoplastic road marking paint 2 mm thick for longer durability with 8% glass beads using special applicator machine with heating arrangement upto160 degree Celsius; paint material shall be confirming to Ministry of surface transport (MOST) specification 803.4 VoI I as laid down in specification of road/bridge work third revision after cleaning surfaces complete all as specified. | 254 | Square Metre | 500 ₹1,27,000 Lowest | 653 ₹1,65,862 | 650 ₹1,65,100 | 550 ₹1,39,700 | 700 ₹1,77,800 | 650 ₹1,65,100 |
| 10.00 | Roughening surfaces of old concrete floor by picking, sweeping clean and washing down with water to remove dust, etc. | 100 | Square Metre | 20 ₹2,000 | 8 ₹800 | 5 ₹500 Lowest | 25 ₹2,500 | 50 ₹5,000 | 35 ₹3,500 |
Tender Value
₹64.2 L
EMD Value
₹1.2 L
Closing Date
2 Sept 2026, 6:00 pmClosed
CWE KHUMBATHANG
HQ CWE KHUMBATHANG C/O 56 APO PIN-900270
SPECIAL REPAIR TO ROAD/ HARDSTANDING AT BDE CAMP AND FD WKSP AT DRASS UNDER GE KARGIL
2026_MES_777098_2
80051/18/2026-27
Open Tender
Civil Works
Works
270 days
DRASS
Class C, Cat a(v)
9 documents required · 9 mandatory
₹1,000
GE KARGIL
₹1.2 L
Yes
18 Sept 2026
17 Aug 2026
3 Sept 2026
17 Aug 2026
2 Sept 2026
25 Aug 2026
17 Aug 2026 - 24 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repair to potholes any depth, not exc 1 sq m each including sweeping free from dust and mud, or water, scoring sunken surfaces in roads, paths, etc. cutting around edges to at least 25 mm in depth, making good by applying tack coat @ 5 kg per 10 sq m, putting in premixed bituminous macadam, well rammed and sealed with binder 9.8 kg per 10 sq m, blinded with 0.09 cu m of stone chippings, 6.3 mm size and again well rammed (including supply of premixed macadam, binder and chippings) depth of potholes exc 30 mm. | 1.5 | 10 SQM | 7 | ₹10.5 |
| 2 | Preparing surfaces unsurfaced water macadam by brushing with wire brushes for removing caked mud etc sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc all as spd and directed | 50 | 10 SQM | 7 | ₹350 |
| 3 | Applying evenly a priming/tack coat with bituminous primer using paving bitumen (Viscosity Grade - 10) VG-10 @ 10 kg/10sqm complete all as specified and directed. | 50 | 10 SQM | 7 | ₹350 |
| 4 | M&L premix bituminous macadam laid/rolled and compacted to required gradient and camber(consolidated thickness 75mm or less) etc 4.0% binder content of paving bitumen VG-30 by weight of total mix rolled and compacted mixed in mechanical hot mixed plant and premixed material laid with mechanical paver finished including rolling to required camber and gradient with 8 to 12 tone power roller to required compaction complete all as specified and as directed | 25 | Cubic Metre | - | - |
| 5 | Preparing surfaces black top by brushing with wire brushes for removing caked mud etc sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc all as spd and directed | 410 | 10 SQM | - | - |
| 6 | Applying evenly a priming/tack coat with bituminous primer using paving bitumen (Viscosity Grade - 10) VG-10 @ 2.5 kg/10sqm complete all as specified and directed. | 50 | 10 SQM | - | - |
| 7 | Applying evenly a priming/tack coat with bituminous primer using paving bitumen (Viscosity Grade - 10) VG-10 @ 5 kg/10sqm complete all as specified and directed. | 410 | 10 SQM | 7 | ₹2,870 |
| 8 | Bituminous premix asphaltic semi dense concrete 40 mm thick consolidated thickness with 5.5% binder content of paving bitumen VG-30 by weight of total mix rolled and compacted mixed in mechanical hot mixed plant and premixed material laid with mechanical paver finished including rolling to required camber and gradient with 8 to 12 tone power roller including preparation bitumen carpet in digital computarised weigh batch hot mix plant including preparation to required compaction complete all as specified and as directed. | 461.5 | 10 SQM | 7 | ₹3,230.5 |
| 9 | M&L for preparation new/old black top surface road surface and applying one coat of retro reflective thermoplastic road marking paint 2 mm thick for longer durability with 8% glass beads using special applicator machine with heating arrangement upto160 degree Celsius; paint material shall be confirming to Ministry of surface transport (MOST) specification 803.4 VoI I as laid down in specification of road/bridge work third revision after cleaning surfaces complete all as specified. | 254 | Square Metre | 7 | ₹1,778 |
| 10 | Roughening surfaces of old concrete floor by picking, sweeping clean and washing down with water to remove dust, etc. | 100 | Square Metre | 7 | ₹700 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
BOQ_879450.xls
BOQ • 3.44 MB
TENDER18.pdf
Tender Documents • 0.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .