| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.4 CrAccepted-AOC 121 MODEL TOWN AMBALA CITY HARYANA 134003 | AMBALA CITY | AMBALA | HARYANA | 134003 | ₹41.4 Cr | L1 | Accepted-AOC 1ST LOWEST BIDDER |
| 2 | L2₹43.4 Cr+₹2.0 Cr (4.89%)Rejected-Finance | ₹43.4 Cr+₹2.0 Cr (4.89%) | L2 | Rejected-Finance Being 2nd lowest bidder |
| 3 | L3₹43.9 Cr+₹2.5 Cr (6.06%)Rejected-Finance | ₹43.9 Cr+₹2.5 Cr (6.06%) | L3 | Rejected-Finance Being 3rd lowest bidder |
| 4 | L4₹44.4 Cr+₹3.0 Cr (7.15%)Rejected-Finance 12 B NIKKA SINGH COLONY RAM TIRATH ROAD AMRITSAR PUNJAB | ₹44.4 Cr+₹3.0 Cr (7.15%) | L4 | Rejected-Finance Being 4th lowest bidder |
| 5 | L5₹45.0 Cr+₹3.6 Cr (8.64%)Rejected-Finance 67 B STREET NO 1 HUSSAINPURA AMRITSAR 143001 | AMRITSAR | AMRITSAR | PUNJAB | 143001 | ₹45.0 Cr+₹3.6 Cr (8.64%) | L5 | Rejected-Finance Being 5th lowest bidder |
| Sl No | Description | Qty | Unit | GEMINI PROMOTERS AND BUILDERS PVT. LTD. L7 | AMIT ASSOCIATES L3 | J.D.Builders L1 | Rabina Enterprises Pvt Ltd L6 | GAANESHKARTIKEY CONSTRUCTION PVT. LTD. L4 | BAL SINGH AND SONS L2 | NAND LAL PURI AND SONS PRIVATE LIMITED L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00SCHEDULE `A' PART - I (Building Works) is not prepriced by MES and prepriced rates indicates 0.0 under column 6 signified this fact only. | ||||||||||
| 1.01 | Completion of incomplete work of Blast Pen Double Entry (BP-52) on permanent specifications including RCC retaining walls, dwarf / toe walls, earth traverse, sliding doors, all pavement quality concrete flooring inside and out side of blast pen and other items, complete all as specified and shown on drawings. | 1 | Each Block | 9,80,00,000 ₹9,80,00,000 | 7,69,00,000 ₹7,69,00,000 | 7,40,00,000 ₹7,40,00,000 Lowest | 8,00,00,000 ₹8,00,00,000 | 9,26,00,000 ₹9,26,00,000 | 8,00,00,000 ₹8,00,00,000 | 8,00,00,000 ₹8,00,00,000 |
| 1.02 | Completion of incomplete work of Blast Pens Single Entry (BP-55) on permanent specifications ,including RCC retaining walls, dwarf / toe walls, earth traverse, sliding doors, all pavement quality concrete flooring inside and out side of blast pen and other items, complete all as specified and shown on drawings. | 1 | Each Block | 10,85,00,000 ₹10,85,00,000 | 9,50,00,000 ₹9,50,00,000 | 9,20,00,000 ₹9,20,00,000 | 10,00,00,000 ₹10,00,00,000 | 8,00,00,000 ₹8,00,00,000 Lowest | 9,80,00,000 ₹9,80,00,000 | 9,30,00,000 ₹9,30,00,000 |
| 1.03 | Completion of incomplete work of Blast Pens Single Entry (BP-56) on permanent specifications, including RCC retaining walls, dwarf / toe walls, earth traverse, sliding doors, all pavement quality concrete flooring inside and out side of blast pen and other items, complete all as specified and shown on drawings. | 1 | Each Block | 11,40,00,000 ₹11,40,00,000 | 10,59,00,000 ₹10,59,00,000 | 9,90,00,000 ₹9,90,00,000 | 11,01,00,000 ₹11,01,00,000 | 9,48,00,000 ₹9,48,00,000 Lowest | 10,50,00,000 ₹10,50,00,000 | 11,00,00,000 ₹11,00,00,000 |
| 1.04 | Construction of Blast Pen with Annexe (BP-57) on permanent specifications, including RCC retaining walls, dwarf / toe walls, earth travers, sliding doors, all pavement quality concrete flooring inside and out side of blast pen and other items, complete all as specified and shown on drawings. | 1 | Each Block | 13,40,00,000 ₹13,40,00,000 | 12,99,00,000 ₹12,99,00,000 | 12,00,00,000 ₹12,00,00,000 | 12,99,68,111 ₹12,99,68,111 | 11,52,34,560 ₹11,52,34,560 Lowest | 11,80,00,000 ₹11,80,00,000 | 12,90,00,000 ₹12,90,00,000 |
| 1.05 | Construction of fire point on pemanent specification, complete all as shown on drawings. | 4 | Each | 25,000 ₹1,00,000 Lowest | 25,000 ₹1,00,000 Lowest | 25,000 ₹1,00,000 Lowest | 25,000 ₹1,00,000 Lowest | 55,00,000 ₹2,20,00,000 | 25,000 ₹1,00,000 Lowest | 40,000 ₹1,60,000 |
| 1.06 | M&L for conventional LLDPE septic tank designed to carry sewage and sludge water, excavation in any type of soil, PCC 1:4:8 below foundation, Vent shaft, connection etc., complete for 05 users, complete all as specified and shown on drawings. | 1 | Each | 1,00,000 ₹1,00,000 | 1,00,000 ₹1,00,000 | 40,000 ₹40,000 | 2,00,000 ₹2,00,000 | 39,500 ₹39,500 Lowest | 2,00,000 ₹2,00,000 | 80,000 ₹80,000 |
| 1.07 | M&L Soakage Well including excavation, in any type of soil, foundation in PCC 1:3:6, walls of honey combed masonry with top ring of M25 concrete including intercepting chamber and screen chamber made of Brick masonary in CM, RCC cover slab in M25/ SFRC cover, interconnecting pipes of RCC/DWC complete filled with brick bats of size 1.20m x 1.50m effective depth, complete all as specified and shown on drawings. | 1 | Each | 50,000 ₹50,000 | 1,00,000 ₹1,00,000 | 45,000 ₹45,000 Lowest | 1,50,000 ₹1,50,000 | 70,000 ₹70,000 | 1,30,000 ₹1,30,000 | 50,000 ₹50,000 |
| 2.00NOTE: Schedule ‘A’ Part II to XI below are Prepriced by MES. | ||||||||||
| 2.01 | Lump sum price worked out by the Contractor for “EXCAVATION AND EARTH WORKS” as listed in Schedule ‘A’ Part II | 1 | Lump sum | 17,60,000 ₹17,60,000 Lowest | 21,06,000 ₹21,06,000 | 26,40,149.19 ₹26,40,149.19 | 29,33,499.1 ₹29,33,499.1 | 29,33,499 ₹29,33,499 | 27,00,000 ₹27,00,000 | 23,46,799.28 ₹23,46,799.28 |
Tender Value
₹34 Cr
EMD Value
₹15 L
Closing Date
10 Oct 2025, 6:00 pmClosed
HQ CE (AF) WAC PALAM
HQ CE (AF) WAC PALAM
COMPLETION OF BALANCE WORK FOR DEMOLITION AND RE-CONSTRUCTION OF FOUR NOS OF BLAST PENS AT GREENFIELD AREA AT AF STN AMBALA
2025_MES_718669_2
CEWAC/AMB/T-10/2025-26
Open Tender
Civil Works
Lump-sum
450 days
GE (P) (AF) AMBALA
AS PER NIT AND TENDER DOCUMENTS
8 documents required · 8 mandatory
₹3,000
GE (P) (AF) AMBALA
₹15 L
Yes
HQ CE (AF) WAC PALAM DELHI CANTT
29 Jul 2026
17 Sept 2025
13 Oct 2025
17 Sept 2025
10 Oct 2025
3 Oct 2025
25 Sept 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SCHEDULE `A' PART - I (Building Works) is not prepriced by MES and prepriced rates indicates 0.0 under column 6 signified this fact only. | |||||
| 1.01 | Completion of incomplete work of Blast Pen Double Entry (BP-52) on permanent specifications including RCC retaining walls, dwarf / toe walls, earth traverse, sliding doors, all pavement quality concrete flooring inside and out side of blast pen and other items, complete all as specified and shown on drawings. | 1 | Each Block | - | - |
| - | Completion of incomplete work of Blast Pens Single Entry (BP-55) on permanent specifications ,including RCC retaining walls, dwarf / toe walls, earth traverse, sliding doors, all pavement quality concrete flooring inside and out side of blast pen and other items, complete all as specified and shown on drawings. | 1 | Each Block | - | - |
| - | Completion of incomplete work of Blast Pens Single Entry (BP-56) on permanent specifications, including RCC retaining walls, dwarf / toe walls, earth traverse, sliding doors, all pavement quality concrete flooring inside and out side of blast pen and other items, complete all as specified and shown on drawings. | 1 | Each Block | - | - |
| - | Construction of Blast Pen with Annexe (BP-57) on permanent specifications, including RCC retaining walls, dwarf / toe walls, earth travers, sliding doors, all pavement quality concrete flooring inside and out side of blast pen and other items, complete all as specified and shown on drawings. | 1 | Each Block | - | - |
| - | Construction of fire point on pemanent specification, complete all as shown on drawings. | 4 | Each | - | - |
| - | M&L for conventional LLDPE septic tank designed to carry sewage and sludge water, excavation in any type of soil, PCC 1:4:8 below foundation, Vent shaft, connection etc., complete for 05 users, complete all as specified and shown on drawings. | 1 | Each | - | - |
| - | M&L Soakage Well including excavation, in any type of soil, foundation in PCC 1:3:6, walls of honey combed masonry with top ring of M25 concrete including intercepting chamber and screen chamber made of Brick masonary in CM, RCC cover slab in M25/ SFRC cover, interconnecting pipes of RCC/DWC complete filled with brick bats of size 1.20m x 1.50m effective depth, complete all as specified and shown on drawings. | 1 | Each | - | - |
| 2.01 | Lump sum price worked out by the Contractor for “EXCAVATION AND EARTH WORKS” as listed in Schedule ‘A’ Part II | 1 | Lump sum | 29,33,499.1 | ₹29,33,499.1 |
| 2.02 | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION WORKS” as listed in Schedule ‘A’ Part III | 1 | Lump sum | 6,16,730 | ₹6,16,730 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.41 MB
BOQ_818859.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .