| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC 112 RADHEY SHYAM VIHAR PHASE II MURAD NAGAR GHAZIABAD UP | GHAZIABAD | UP | ₹1.9 Cr | L1 | Accepted-AOC Work awarded |
| 2 | L2₹2.0 Cr+₹13.7 L (7.21%)Rejected-AOC | ₹2.0 Cr+₹13.7 L (7.21%) | L2 | Rejected-AOC Rejected due to higher rate |
| 3 | L3₹2.1 Cr+₹20.8 L (10.9%)Rejected-AOC 10 HARDEEP ENCLAVE SIKANDRA AGRA U P 282007 | AGRA | UTTAR PRADESH | 282001 | ₹2.1 Cr+₹20.8 L (10.9%) | L3 | Rejected-AOC Rejected due to higher rate |
Tender Value
Refer Docs
EMD Value
₹3.8 L
Closing Date
18 Apr 2023, 11:00 amClosed
Superintending Engineer
Electricity Distribution Circle, Rudrapur
Construction of 33 KV Underground line in main market Dineshpur under 33/11 KV S/s Dineshpur under EDSD, Gadarpur
2023_UPCL3_56790_1
EDC(USN)97/2022-23
Open Tender
Electrical Works
Turn-key
180 days
Dineshpur
Pl. refer tender documents
3 documents required · 3 mandatory
₹11,800
EE ETD Rudrapur
₹3.8 L
20 Jul 2023
28 Mar 2023
18 Apr 2023
28 Mar 2023
18 Apr 2023
28 Mar 2023
Amount
Annexure-A (LABOUR CHARGES)
Cartage of ST -Pole SP-55 from ESC Rudrapur to work site including Loading and unloading safely (Distance 0-20 Km).
Cartage of 33 KV XLPE cable 3x400 sqmm from ESC Rudrapur to work site including Loading and unloading safely (Distance 0-20 Km).
Cartage of other Small Material from from ESC Rudrapur to work site including Loading and unloading safely (Distance 0-20 Km).
Charges of Erection of Double Pole support pole ST Pole SP-55 in proper level and alignment alongwith fixing of all accessories, like top channel, X-bracing & clamps etc complete as per RESSPO construction Manual.
Charges of Laying of 33 KV XLPE cable 3x400 sq mm after digging of earth soil including cable loop both end of D/P Pole section as per specification including hanging of Cable on D/P section pole stucture complete as per RESSPO construction Manual.
Charges of Laying of 33 KV XLPE cable 3x400 sq mm with the help of HDD machine in cable Trench Packing under R:C Hume pipe including cable loop both end of D/P Pole section as per specification including hanging of Cable on D/P section pole stucture complete as per RESSPO construction Manual.
Charges of fitting & fixing of termination kit as per Direction of Engineer in charge.
Charge of Erection of M.S. Earthing rod 20x2500mm connecting support with G.I.Wire no.8 S.W.G. as per RESPO specification & as per direction of Engineer in charge.
Annexure-B (SUPPLY ITEMS)
Supply of 33 KV XLPE Cable 3x400 sq mm. as per Specification of UPCL.
Supply of 33 KV Termination Kit 3x400 Sq.mm O/D as per Specification of UPCL.
Supply of ST SP-55, 11 mtr long (BPHD) as per Specification of UPCL.
Supply of M.S.Channel 100x50 mm as per Specification of UPCL.
Supply of M.S. Angle 65x65x6 mm as per Specification of UPCL.
Supply of Earth Rod 20x2500mm as per Specification of UPCL.
Supply of GI Earthing strip 8 SWG as per Specification of UPCL..
Supply of 33 KV Polymer Disc Insulator as per Specification of UPCL.
Supply of 33 KV Disc Fitting 70 KN as per Specification of UPCL.
Supply of 33 KV Polymer Pin Insulator as per Specification of UPCL.
Supply of GI Pipe 8 inch 8 feet long
Supply of HDPE pipe PE 100 PN6 & having dia 160MM conferming to IS 4984/2016
Supply of Danger board with clamp
Supply of Double Pole clamp
Supply of cable holding clamp
Supply of Nut and Bolt off size
Raj Shyama Constructions Pvt. Ltd.
VIBHOR VAIBHAV INFRA PVT LTD
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .