| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.9 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹6.3 L+₹38,500.69 (6.49%)Rejected-Finance | 2 | Rejected-Finance L2 |
Tender Value
₹5.9 L
EMD Value
₹14,827
Closing Date
9 Feb 2024, 6:00 pmClosed
Asst. Engineer
MUNICIPAL OFFICE MANJERI
Annual Plan-Manjeri Municipality 2023-24, Project No-202-Drainage work of Mullampara Gas Godown road in ward 38 -General Civil Work
2024_LSGD_652517_15
E1-ETN 10/23-24/AE
Open Tender
Civil Works - Roads
Item Rate
150 days
Manjeri Municiality
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,310
Yes
₹14,827
Yes
9 Apr 2024
2 Feb 2024
12 Feb 2024
2 Feb 2024
9 Feb 2024
2 Feb 2024
Amount
APPENDIX 1- MUD DRAIN
3.5.2:Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.
CC DRAIN
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
10.25.1:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In stringers, treads,landings etc. of stair cases, including use of chequered plate wherever required, all complete
T HAMZA
Bidder Name
N V KUNHIMOHAMMED
T HAMZA
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1006337.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .