Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.3 CrAccepted-AOC KENDUADIHI GANGAJALGHATI BANKURA PURULIA W B | BANKURA | WEST BENGAL | 713142 | ₹5.3 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹5.6 CrRejected-AOC BALIAPUR DHANBAD | DHANBAD | JHARKHAND | 818142 | ₹5.6 Cr | L-2 | Rejected-AOC L-2 |
| 3 | L-3₹5.6 CrRejected-AOC 56 SHYAM BABAPATH BHALOTIA DHARAMSSALA JHUMRI TELAIYA DIST KODERMA JHARKHAND 825409 | KODERMA | JHARKHAND | 825409 | ₹5.6 Cr | L-3 | Rejected-AOC L-3 |
| 4 | L-4₹5.8 CrRejected-AOC B POLYTECHNIC ROAD VIP COLONY DHANBAD | DHANBAD | JHARKHAND | 818142 | ₹5.8 Cr | L-4 | Rejected-AOC L-4 |
| 5 | Rejected-Technical CHAS ROAD JAINA MORE JARIDIH BOKARO JHARKHAND | BOKARO | JHARKHAND | 825102 | - | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | BINOD KUMAR SINGH L4 | Man Mohan Grover L2 | RAJPATH BUILDERS L1 | RAJU KUMAR L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Clearing Grass and Removal of Rubbish | 3.48 | HECT. | 14,290.65 ₹49,731.46 | 14,576.46 ₹50,726.08 | 15,000 ₹52,200 | 16 ₹55.68 |
| 2.00 | Construction of granular sub-base using crusher run ,spreading in uniform layers with mator grader on prepared surface ,mixing by mix in place method with rotovator at OMC, and compating with vibratory roller to achieve the desired density, complete as per clause 401 for grading-V Material | 441.68 | CUM | 1,333.79 ₹5.9 L | 1,360.47 ₹6.0 L | 1,300 ₹5.7 L | 2,139 ₹9.4 L |
| 3.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 272.25 | CUM | 1,810.15 ₹4.9 L | 1,846.35 ₹5.0 L | 1,700 ₹4.6 L | 2,380 ₹6.5 L |
| 4.00 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. | 1,089 | SQM | 80.98 ₹88,187.22 | 82.6 ₹89,951.40 | 75 ₹81,675 | 30 ₹32,670 |
| 5.00 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared granular surface cleaned with mechanical broom. | 1,089 | SQM | 11.43 ₹12,447.27 | 11.66 ₹12,697.74 | 12 ₹13,068 | 17 ₹18,513 |
| 6.00 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 1,08,613.3 | SQM | 11.43 ₹12.4 L | 11.66 ₹12.7 L | 12 ₹13.0 L | 13 ₹14.1 L |
| 7.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @4.5 percent by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 505 complete in all respects with VG-30 Bulk Bitumen. | 2,820.9 | CUM | 8,500 ₹2.4 Cr | 8,065.64 ₹2.3 Cr | 7,800 ₹2.2 Cr | 8,000 ₹2.3 Cr |
| 8.00 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment , rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 507 complete in all respects with VG-30 Bulk Bitumen. | 1,565.84 | CUM | 9,000 ₹1.4 Cr | 8,940.23 ₹1.4 Cr | 8,600 ₹1.3 Cr | 9,000 ₹1.4 Cr |
| 9.00 | Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen meeting the requirements given in table 500-39, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated fine grained hard stone chipping of 13.2 mm nominal size at the rate of 0.005 cum per 10sqm and at an approximate spacing of 10cm center to center in both directions, pressed into surface when the temperature of surfaces is not less tha 1000c, protruding 1mm to 4mm over mastic surface, all complete as per clause 516. | 2,800 | SQM | 714.53 ₹20.0 L | 728.82 ₹20.4 L | 550 ₹15.4 L | 566 ₹15.8 L |
| 10.00 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 1,600 | SQM | 142.91 ₹2.3 L | 145.77 ₹2.3 L | 100 ₹1.6 L | 248 ₹4.0 L |
Tender Value
₹6.3 Cr
EMD Value
₹6.3 L
Closing Date
28 Jun 2025, 12:00 pmClosed
EE RCD ROAD DIVISION DHANBAD
EE RCD ROAD DIVISION DHANBAD
IRQP Work Of Jamtara To Nirsa Via Birgram Road From (Ch. 15300m To 24000m) Total Length- 8.70 Km For The Year 2025-26
2025_CECOM_101398_1
RCD/Dhanbad/793/2025-26 (1ST Call)
Open Tender
Civil Works - Roads
75 days
DHANBAD
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹6.3 L
22 Apr 2026
27 May 2025
1 Jul 2025
27 May 2025
28 Jun 2025
27 May 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
SBD.pdf
Tender Documents • 9.99 MB
BOQ_136202.xls
BOQ • 0.29 MB
BOQ.xls
BOQ • 0.29 MB
Tenderdocument.pdf
Tender Documents • 9.99 MB
Download all tender documents and submit your bid