| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.2 CrAccepted-AOC 18 CORPORATION ROAD DEVAKOTTAI | SIVAGANGA | TAMIL NADU | 630001 | L1 | Accepted-AOC Lowest Tender | |
| 2 | L2₹68.7 Cr+₹1.3 Cr (1.90%)Rejected-Finance NO 4 GROUND FLOOR ALAYAM SPACE ANANDHA ROAD ALWARPET CHENNAI 600 018 | CHENNAI | TAMIL NADU | 600018 | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹70.0 Cr+₹2.6 Cr (3.81%)Rejected-Finance | L3 | Rejected-Finance Other than lowest |
Tender Value
₹64.2 Cr
EMD Value
₹32.2 L
Closing Date
6 Apr 2022, 2:00 pmClosed
The Superintending Engineer H CandM, Trichy
O/o the Superintending Engineer, Highways CandM Division, TVS Tollgate, Thiruchirappalli
Widening from ML to Four Lane with Paved shoulder using Paver Block and Strengthening at km 325.6 - 333.0 of Chennai Tirchy Dindigul road including Reconstruction of Box culverts, Widening of Culverts, Construction of Retaining wall,drain,median
2022_HWAY_226221_1
TN.NO.56/2021-2022
Open Tender
Civil Works - Roads
Percentage
450 days
Thiruchirappalli
As per PQ Document
7 documents required · 7 mandatory
₹0
₹32.2 L
16 May 2022
18 Mar 2022
7 Apr 2022
18 Mar 2022
6 Apr 2022
19 Mar 2022
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.001 | Road Work | - | - | - | - |
| - | Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for pickig and all other tools and plants employed of the work and including all other incidental charges etc., complete as per standard specifications. as per MORTH Vth Rev. 111, 112, 202 | - | - | - | - |
| - | Main work Km 325/600-331/400 | 27,352 | One Square Metre | 18 | ₹4,92,336 |
| - | Main work Km 331/4-333/0 | 6,684 | One Square Metre | 17.15 | ₹1,14,630.6 |
| - | Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per MORTH Vth Rev., 111, 112 & 201 a) box cutting for widening portion | - | - | - | - |
| - | Main work Km 325/600-331/400 | 6,045 | One Cubic Metre | 101.43 | ₹6,13,144.35 |
| - | Main work Km 331/4-333/0 | 1,441 | One Cubic Metre | 96.6 | ₹1,39,200.6 |
| - | Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for Grading V Material. as per MORT&H Rev. V specifications No.111,112,401,900. | - | - | - | - |
| - | Main work Km 325/600-331/400 | 7,587 | One Cubic Metre | 1,636.14 | ₹1,24,13,394.18 |
| - | Main work Km 331/4-333/0 | 1,644 | One Cubic Metre | 1,648.09 | ₹27,09,459.96 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_267262.xls
BOQ Document • 1.12 MB
94627273.pdf
Tender Document • 0.10 MB
CMRDPDraw.pdf
Tender Document • 3.27 MB
PriceVol2TRY62.pdf
Tender Document • 0.38 MB
PQVol1TRY62.pdf
Tender Document • 0.39 MB
94627275.html
Tender Document • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .