Loading
Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹75.6 Laccepted-aoc | ₹75.6 L | accepted-aoc |
Tender Value
₹76.4 L
Closing Date
25 May 2026, 4:15 pmClosed
SE PRED PR GUNTUR
Construction of compound wall in East side and North side of burial ground at Allavaram (V) of Allavaram (M), Est Rs.15.00 Lakhs
813108
NIT No. 13/2025-26 dt.02.05.2025 of the Superintending Engineer, PR Circle,Guntur
OPEN - NCB
Works
Andhra Pradesh
9 Jun 2026
21 May 2025
stage.html
html • 0.01 MB
aoc.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
Download all tender documents and submit your bid