Tender Value
₹12.4 L
EMD Value
₹24,000
Closing Date
10 Aug 2020, 12:00 pmClosed
SE OMC 3 BTPS
SE OMC III BTPS ANPARA
Air conditioning systems and water coolers of BTPS Anpara except Coal Handling Area
2020_RVUNL_492096_1
44/CIMD-III/BTPS/ANP/T-1/20-21
Open Tender
Repair and Maintenance Services
Fixed-rate
365 days
BTPS ANPARA
As per Tender DOC
2 documents required · 2 mandatory
₹1,180
Dy CAO CFA BO BTPS
₹24,000
12 Oct 2020
13 Jul 2020
13 Aug 2020
13 Jul 2020
10 Aug 2020
13 Jul 2020
Amount
PART A
Round the clock operation, keeping records of relevant parameters and taking precautionary measures as per schedules of supplier for continuous running of 'DAIKIN' JAPAN make VFD type and Reciprocal type central Air Conditioning package and related equipments installed at 21 Meters and other locations on T/G floor area of 'B' Thermal Power Station.
Round the clock operation, keeping records of relevant parameters and taking precautionary measures as per schedules of supplier for continuous running of 'DAIKIN'JAPAN and other make water cooled/air cooled SPLIT Type package air conditioners and related equipments installed at different locations as WTP, ESP, ASP House, DFA control room & Compressor House of "B" Thermal Power Station.
Preventive and running \ routine maintenance jobs which includes cleaning of air filter, greasing of bearing, adjusting tension of v-belt, checking vibration, alignment of pumps, cleaning of work area, oil and gas (Refrigerant) charging in the event of leakages or non performance of air conditioning system and all other necessary preventive maintenance work as mentioned in scope of work annexure-ii to keep the AC system in smooth working condition. The details of equipment installed locations are as mentioned below:
a. Main plant AC and associated AHU , FCU installed at 21 mtrs,7 mtrs, 0 mtr,
b. Water cooled package AC at simulator building
c. Water cooled package AC at ESP 4 & ESP 5
d. Water cooled package AC at service bldg & electrical workshop
e. water cooled package AC at WTP & Ash slurry pump house
f. Air cooled AC at Ash slurry pump house, ESP4&5 -
g. Air cooled AC at CPP, HT switch gear
h. split AC at air compressor house, Fire pump house
i. split AC at Telephone exchange and dry fly ash control room
j. split AC at SPMS
k. split AC at GM & SE's room in service building
l.. split AC at lift control room service building
PART B
Complete repair / overhauling to make it properly functional except motor winding of semi-hermetically sealed 37 KW compressor of water cooled chiller central air conditioning system installed at +21M T/G floor (Water cooled chiller package).
Complete repair / overhauling of hermetically sealed compressor units of air conditioning package of following types.
Water cooled type 15 KW
Water cooled type 10.8 KW
Water cooled type 7.5 KW
Water cooled type 5.5 KW
Air cooled type
Split type
Supply & charging /installation
R-22 Gas per Kg.
R407C gas per Kg
Nitrogen Gas per Metre Cube
Repair \ Overhauling of centrifugal pump installed with water cooled air conditioning package and central air conditioning package. The work involves dismantling of pump, alignment of pump with motor and other work like impeller repair, replacement of bearing etc. and than installation at site.
Repair \ Overhauling of air blowers of air handling units. The work includes dynamic balancing of blower fan, replacement of bearings repair of shaft and other associated work.
Repair\ Overhauling of 3 way control valves.
Rewinding of motor used in cooling tower fans, indoor and out door unit fans & other motors pertaining to various air conditioning packages & water coolers as per details given below. The work involves dismantling motor fan, packages\ coolers carrying away to the work place rewinding testing reinstallation with proper alignment and ensuring its continuous trouble free operation for 72 Hours. Along with guarantee for six months
(a) 37 KW, 3 0, 415 V, 50 Hz
(b) 30 KW, 3 0, 415 V, 50 Hz
(c) 15 KW, 3 0, 415 V, 50 Hz
(d) 10.8 KW, 3 0, 415 V, 50 Hz
(e) 7.5 KW, 3 0, 415 V, 50 Hz
(f) 5.5 KW, 3 0, 415 V, 50 Hz
(g) 3.7 KW, 3 0, 415 V, 50 Hz
(h) 2.2 KW, 3 0, 415 V, 50 Hz
(i) 1.5 KW, 3 0, 415 V, 50 Hz
(j) 0.75 KW, 3 0, 415 V, 50 Hz
(m) 3 KW, 1 0, 240 V, 50 Hz
(n) 2.2 KW, 1 0, 240 V, 50 Hz
Complete overhauling motors used in cooling tower fans indoor/outdoor unit fans and other motors pertaining to various air conditioning packages. The work involves dismantling and overhauling of motors varnishing of windings, re-installation with proper alignment and ensuring it’s continue trouble free operations for 72 hrs. Along with Guarantee for six months
(a) 30 KW, 3 0, 50 Hz, 415 V
(b) 15 KW, 3 0, 50 Hz, 415 V
(c) 11 KW, 3 0, 50 Hz, 415 V
(d) 7.5 KW, 3 0, 50 Hz, 415 V
(e) 5.5 KW, 3 0, 50 Hz, 415 V
(f) 3.7 KW, 3 0, 50 Hz, 415 V
(g) 2.2 KW, 3 0, 50 Hz, 415 V
(h) 1.5 KW, 3 0, 50 Hz, 415 V
(i) 0.75 KW, 3 0, 50 Hz, 415 V
Break down maintenance of Water coolers installed at various places of BTPS
Repairing of Thermostat switches of water coolers
Repairing of water faucet of water cooler.
Repairing of piping
Repairing of filter
Repairing of valve
Repairing of compressor.
Replacement of compressor.
Replacement of Thermostat switches of water coolers
Replacement of water faucet
Replacement of Over load relay, if require
Removal of fan jamming, greasing of bearing of fan and other moving parts
Attending gas leakage of cooling tube and compressor
Gas charging (Nitrogen and Mefron)
Attending water leakage of water cooler from inside and out side both
Attending of the water pipe connection.
Painting of water cooler’s Base & body to avoid corrosion.
Complete repair/ overhaul of compressor
Repairing of body and base plate
Break down maintenance of Water coolers installed at various places of BTPS
M/S AIR FREEZE
M/s R.L.ENGINEERING
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .