Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.0 LAccepted-AOC COURT ROAD UTTARKASHI | L1 | Accepted-AOC yes | |
| 2 | L2₹36.7 L+₹1.8 L (5.07%)Rejected-Finance 37 MOHAN VATIIKA ACHIEVERS HOME PUBLIC SCHOOL WALI GALI JAGJEETPUR KANKHAL HARIDWAR | HARIDWAR | HARIDWAR | UTTARAKHAND | L2 | Rejected-Finance no | |
| 3 | L3₹37.7 L+₹2.7 L (7.86%)Rejected-Finance HARIDWAR | L3 | Rejected-Finance no |
Tender Value
₹35.0 L
EMD Value
₹75,000
Closing Date
25 Oct 2024, 12:00 pmClosed
SE EDC Srinagar Garhwal
SE EDC Srinagar Garhwal
Shifting of 33 KV Line Composite including De- Centralized material under EDD Kotdwar in Deposit Head
2024_UPCL4_76557_1
E-Tender no.53/EDC(s)/2024-25
Open Tender
Electrical Works
Item Rate
90 days
Srinagar
Shifting of 33 KV Line
Composite including De-
Centralized material under EDD
Kotdwar in Deposit Head
3 documents required · 3 mandatory
₹2,360
EE ETD Srinagar Garhwal
₹75,000
26 Dec 2024
3 Oct 2024
26 Oct 2024
3 Oct 2024
25 Oct 2024
3 Oct 2024
Amount
Material
Nut & Bolts
LT Clamp(50x6mm) for SP-72 with N&B
Bottom Bracing clamp 33KV for SP-72- N&B
E/WIRE CLAMP FOR SP-72 WITH N&B 65X6
LT CLAMP WITH N&B ST POLE SP-55
EARTH WIRE CLAMP FOR SP-55 WITH N/B
PP & CLAMP WITH N&B ST POLE SP-55
Stay Clamp for SP-55 With Nut & Bolt
PP & CLAMP WITH N&B ST POLE SP-72
STAY CLAMP FOR SP-72 WITH N/B
Suspension Clamp With J Hook
Dead End Clamp with I Hook
SHACKLE INSULATOR 100X115 mm WITH N&B
STAY INSULATOR
Top Bracing clamp 33KV for SP-72 withN&B
LT XLPE Cable 1x25 sqmm
AL CRIMPING TYPE LUGS 25 SQ.mm
AL. CRIMPING TYPE LUGS 150 SQ.mm
AL CRIMPING TYPE LUGS 630 SQ.mm
AL CRIMPING TYPE LUGS 400 SQ. mm
Al. Lug 120 sq. mm.
AL. CRIMPING TYPE LUGS 240 SQ. mm
Labour
SPECIAL EARTHING
ERECTION OF EARTHING ROD
FABRICATION OF STEEL
EXCAVATION OF PIT FOR STAY SET
ERECTION OF 11 KV STAY SET
ERECTION OF 33 KV STAY SET
GROUTING OF STAY SET
EXCAVATION OF PIT FOR POLE
ERECTION OF SINGLE SP-55 POLE
ERECTION OF SINGLE SP-72 POLE
ERECTION OF SP-55 DOUBLE POLE
ERECTION OF SP-72 DOUBLE POLE
GROUTING OF POLE
MUFFING OF POLE
DISMANTLING OF PCC SINGLE POLE
DISMANTLING OF SP-55 SINGLE POLE
DISMANTLING OF PCC DOUBLE POLE
DISMANTLING OF SP-55 DOUBLE POLE
DISMANTLING OF 11 KV LINE(WEASEL)
DISMANTLING OF LT LINE 3 P 4 W(WEASEL)
DISMANTLING OF 25 KVA DTR
DISMANTLING OF 63 KVA DTR
DISMANTLING OF 100 KVA DTR
DISMANTLING OF 250 KVA DTR
DISMANTLING OF 400 KVA DTR
INST. OF 400/500 KVA DTR ON POLE
INST. OF 250 KVA DTR ON POLE STRUCTURE
INST. OF 100 KVA DTR ON POLE STRUCTURE
INST. OF 63 KVA DTR ON POLE STRUCTURE
INST. OF 25 KVA DTR ON POLE STRUCTURE
FIXING OF TPMO
FIXING OF FUSE SET
FIXING OF LIGHTNING ARRESTOR
ERECTION OF BRACKET IN LT LINE
ERECTION OF BRACKET IN 11 KV LINE
ERECTION OF BRACKET IN 33 KV LINE
LAYING OF RABBIT CONDUCTOR IN HT LINE
LAYING OF DOG CONDUCTOR IN HT LINE
LAYING OF 3P 4W LT LINE (WEASEL)
GUARDING OF LT/11 KV LINE
GUARDING OF 33 KV LINE
T-OFF CONNECTION COMPLETE 11 KV LINE
T-OFF CONNECTION COMPLETE 33 KV LINE
CARTAGE SP-55 POLE, 0-20 KM
CARTAGE SP-72 POLE, 0-20 KM
CARTAGE OF PETTY MATERIAL,0-20 KM
DISCONNECTION & RECONNECTION OF CONsumer
DISMANTLE & REINSTALL OF STREETLIGHT
DISMANTLING OF 33 KV LINE(PANTHER/DOG)
Dismantling of AB Cable
Installation of LT DB 3 Ph for LT AB Cab
Dismantaling of LT DB 3 Ph for LT AB Cab
BACK CARTAGE OF PETTY MATERIAL,71-100 KM
DISMANTLE OF EXITING TPMO/GO/ ISOLATOR
DISMANTELLING OF EXITING FUSE SET
INSTALLATION OF ACB LT DISTRIBUTION BOX
LAYING OF LT CABLE & MAKING CONN. AT T/F
M/s S S ENTERPRISES (BID ID -339336)
Sagar Engineering Company (BID ID -339803)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .