Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 CrAdmitted-Finance | ₹5.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.0 CrAdmitted-Finance F 33 3 OKHLA INDUSTRIAL AREA PHASE 2 DELHI 110020 | SOUTH | DELHI | 110020 | ₹7.0 Cr | L2 | Admitted-Finance |
| 3 | L3₹7.0 CrAdmitted-Finance 141 SAHYOG VIHAR APEX BANK COLONY E 8 EXTENSION NEAR GULMOHAR COLONY BHOPAL M P 462039 | BHOPAL | BHOPAL | MADHYA PRADESH | 462039 | ₹7.0 Cr | L3 | Admitted-Finance |
| 4 | L4₹9.2 CrAdmitted-Finance | ₹9.2 Cr | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical Please refer the uploaded sheet. |
| Sl No | Description | Qty | Unit | Infrastructure Development Consultants L3 | Aicons Engineering Pvt. Ltd. L4 | Almondz Global Infra-Consultant Limited L2 | Lion Engineering Consultants Private Lilited L1 |
|---|---|---|---|---|---|---|---|
| 1.00A-I, Remuneation of Resident Professional Personnel including all personal allowances) | |||||||
| 1.01 | Preparation of Feasibility / DPR for 2 Lanning with Paved Shoulder | 1,004.43 | KM | 6,02,65,800 ₹6.0 Cr | 7,53,32,250 ₹7.5 Cr | 6,02,65,800 ₹6.0 Cr | 5,02,21,500 ₹5.0 Cr |
| 1.02 | Preparation of Feasibility / DPR for 4 lanning. | 141.6 | KM | 1,01,95,200 ₹1.0 Cr | 1,69,92,000 ₹1.7 Cr | 99,12,000 ₹99.1 L | 92,04,000 ₹92.0 L |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
6 May 2026, 3:30 pmClosed
Chief Engineer (Procurement)
45-A, Arera Hills, Bhopal
Consultancy Services for the Preparation of Feasibility or DPR Report For Two or Four Laning With Paved Shoulder of Selected Stretches of Major District Roads Package-I (Length- 1146.030 Km)
2026_MPRDC_496888_1
704
Open Tender
Consultancy
365 days
Bhopal
Please refer the Tender document.
3 documents required · 3 mandatory
₹23,600
₹2 L
22 Jun 2026
6 Apr 2026
7 May 2026
6 Apr 2026
6 May 2026
29 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1A-I, Remuneation of Resident Professional Personnel including all personal allowances) | ||||||
| 1.01 | Preparation of Feasibility / DPR for 2 Lanning with Paved Shoulder | - | KM | - | - | item1 |
| 1.02 | Preparation of Feasibility / DPR for 4 lanning. | - | KM | - | - | item23 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
RFP.pdf
Tender Documents • 1.63 MB
BOQ_596299.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid