Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L8₹40.0 L+₹4.2 L (11.8%)Accepted-AOC | L8 | Accepted-AOC Accepted | |
| 2 | L1₹35.8 LRejected-Finance | L1 | Rejected-Finance Non-Bonafide. | |
| 3 | L2₹37.4 L+₹1.6 L (4.48%)Rejected-Finance 59 NEW MARKET CLOCK TOWER DEHRADUN UK PIN 248001 | DEHRADUN | UTTARAKHAND | 248001 | L2 | Rejected-Finance Non-Bonafide. | |
| 4 | L3₹37.4 L+₹1.6 L (4.48%)Rejected-Finance | L3 | Rejected-Finance Non-Bonafide. | |
| 5 | L4₹37.5 L+₹1.7 L (4.64%)Rejected-Finance | L4 | Rejected-Finance Non-Bonafide. |
Tender Value
Refer Docs
EMD Value
₹90,420
Closing Date
15 Oct 2020, 6:00 pmClosed
GE Ludhiana
Garrison Engineer Military Engineer Services Near Jagraon Bridge PIN-141001
Outsourcing of essential services for running of electric installation at Baddowal , Moga and CG Complex under GE Ludhiana.
2020_MES_377658_1
GE/LDH-33/2020-21
Open Tender
Manpower Supply
Item Rate
330 days
Baddowal, Moga and CG Complex under GE Ludhiana
Refer NIT and Tender Documents
9 documents required · 9 mandatory
₹500
GE Ludhiana
₹90,420
Yes
23 Nov 2020
15 Sept 2020
16 Oct 2020
15 Sept 2020
15 Oct 2020
23 Sept 2020
15 Sept 2020 - 22 Sept 2020
Amount
Outsourcing of essential services to run the electrical installation (Main power House Moga & Ascon area) having HT VCB/OCB, power transformer, LT panel etc. installed in the power house round the clock by employing one electrician in three shift of 8 hourse each and one helper in three shift i.e Morning,evening & night shift (24x7) including sundays and holidays, including attending complaints/ repair of overhead lines (LT & HT at Dholewal station area) and cutting the tree branches surrounding the overhead lines (LT &HT) wherever required and keeping the electrical system functional at Dholewal power house complete all as directed by Engineer-in-Charge. Notes:- (a) the contractor's rep (electrician) shall attend all type of complaint as directed. (b) Contractor shall provide all T&P required for mantenance of installation and will keep the same at site at all time. (c) Complaints given upto 08.00 hours on the day shall be attended and cleared on the same day. (d) The contractor shall maintain necessary documents such as log sheets and attendance register as specified in the particular specifecation (e) The contractor shall maintain cleanliness of the complete installation i.e. with in fencing area of the installation by cutting of grass/ cleaning of debris and the quoted rates shall be deemed to be included incluyded for the same. The contractor shall also provide suitable uniform to the staff deployed for the work. (f) Shift timing shall be 0600 hours (morning shift), 1400 hours to 2200 hours (Evening shift) and 2200 hours to 0600 hours (night shift ) as applicable to respictive item. (g) The contractor shall deposite the wages of his workman directly to their bank account by cheqe/ECS/NEFT/RTGS only and necessary proof of payment shall be submitted alongwith his claims for RAR/Final Bill
All as per ser No. 1.01 here in before but for Baddowal Depot area power house.
Otsourcing of attending day to day electrical complaints employing one electrician and one helper in one shift of 8 hours each i.e evening shift including Sunday and holidays, including attending complaints CG complex area) complete all as directed by Engineer-in-Charge. Notes:- (a) the contractor's rep (electrician) shall attend all type of complaint as directed. (b) Contractor shall provide all T&P required for mantenance of installation and will keep the same at site at all time. (c) Complaints given upto 08.00 hours on the day shall be attended and cleared on the same day. (d) The contractor shall maintain necessary documents such as job card and attendance register as specified in the particular specifecation (e) Shift timing shall be 0800 hours (morning shift), 1600 hours as applicable to respictive item. (f) The contractor shall deposite the wages of his workman directly to their bank account by cheqe/ECS/NEFT /RTGS only and necessary proof of payment shall be submitted alongwith his claims for RAR/Final Bill NOTE:- For ser item No.1 to 3 :-Rates for following items are deemed to be included in the rate quoted. (a) Contractor will provided uniform of light blue shirt and dark black paint. On shirt right hand side MES Ludhiana to be engraved with Red thread. (b) Log sheet for installation to be provided by contractor. (c) Cleaning of installation will be the reponsibilities of contractor including material provided for cleaning all round the Installation up to 10 Mtr distance. (d) Furniture for staff shift will be provided by contractor. (e) Weeklly rest to be provided to all staff employed. (f) Attendance register will be handed over to JE concerned. (g) Minimum wages(pay) as notified by GO,s notification to be given staff. (h) Tool kit will be provided by contractor. (i) First Add box will be provided by contractor.
M/s badrinath Traders
CHOUDHARY ENTERPRISES
M/S MAISUR CONSTRUCTION COMPANY PRIVATE LIMITED
SATISH AND CO
M/s GURFATEH BUILDERS
TRIVENI CONSTRUCTIONS
RUHI ASSOCIATES
G M CONSTRUCTION COMPANY
R K ENTERPRISES
JASSI TRADERS
Arneja Builders
M/S BALWINDER SINGH
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .