Karnataka Power Corporation Limited
SHESHU M
D - Meter survey & replacement of eroded Boiler Tubes during overhaul and associated works of Units 5 to 8 Boilers (3X210MW & 1X250MW) of RTPS (OH-3) for the year 2026-27
KPCL/2026-27/PS/WORK_INDENT4673
KPCL/2026-27/PS/WORK_INDENT4673
Open
Power stations
Two Tender Document System(Two Cover)
KPCL Executive Engineer BM1 Office RTPS Raichur
7 documents required · 5 mandatory · 2 optional
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Executed in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
The intending bidder should have satisfactorily completed, as a prime contractor, at least one similar work such as Overhauling works of Replacement of Boiler Tubes or Routine Maintenance of Boilers and its auxiliaries for a period of one year of value not less than Rs. 77 Lakhs in the last five financial years (i.e., 2021-22, 2022-23, 2023-24, 2024-25 & 2025-26) in any Thermal Power Stations of 210 MW and above capacity Units. As a proof of this, the bidder should upload a single / multiple work orders (Limited to maximum 3 work orders for a total amount not less than Rs. 77 Lakhs) or corresponding Work Done Certificate issued by competent authority. Work Order / Work done of previous years shall be given weight at of 10% per financial year to bring them to the present price level of the financial year 2026-27
The intending bidder should be an authorized special class Boiler Repairer. As a proof of this, bidder shall upload the Valid Certificate issued by competent authority of Govt. of Karnataka State. (If the Certificate is from any other state, same shall be endorsed by the competent authority of Govt. of Karnataka State).
The intending bidder, in his name should have achieved a minimum financial turnover of Rs. 308 Lakhs in at least two financial years during the last five financial years. (i.e., 2021-22, 2022-23, 2023-24, 2024-25 & 2025-26). As a proof of this, the bidder shall upload the certified copy of Profit & Loss Account or Turn over Certificate duly certified by the Chartered Accountant. Financial turnover of previous years shall be given weight at 10% per financial year to bring them to the present price level of the financial year 2026-27.
₹3,830
₹2.3 L
20 Aug 2026
20 Aug 2026
28 Aug 2026
25 Aug 2026
24 Aug 2026
D - Meter survey & replacement of eroded Boiler Tubes during overhaul and associated works of Units 5 to 8 Boilers (3X210MW & 1X250MW) of RTPS (OH-3) for the year 2026-27
Transportation, shifting, assembling / erection and dismantling / removal of working platform for erection & operation of sky climbers. (Per Boiler) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOA...
Transportation, shifting, assembling & dismantling and trial operation of sky climbers & its components. (Per Sky Climber) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Operation of sky climbers inside the furnace round the clock (Operating one set per day) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Water Washing and Descaling of lumps, slag etc., on furnace water wall tubes and panels / burner tubes and panels / burner throat / PLSH Coils / Reheater Coils and surrounding surfaces of furnace. (Pe...
Cleaning & Assiting for 'D'meter survey / NDT of water wall tubes / bends around soot blowers, burner panels and corner tubes at First Pass. (Per boiler) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE...
Cleaning & Assiting for D meter survey / NDT of S Panel water wall tubes / bends at First Pass. (Per boiler) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Cleaning & Assisting for 'D'meter survey/ NDT of Platen SH Coils tubes / bends along with spacer tube at First pass. (Per Boiler) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT...
Cleaning & Assisting for 'D'meter survey/ NDT of Reheater Coils tubes / bends along with spacer tube at First pass. (Per Boiler) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Cleaning & Assisting for 'D'meter survey/ NDT of water wall hanger tubes at First pass. (Per boiler) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Cleaning & Assisting for 'D'meter survey/ NDT of rear arch tubes / bends at First pass. (Per boiler) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Replacement of eroded water wall tubes / bends around soot blowers / burner panels / corner tubes / S-Panels at First Pass. (Per Joint) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DO...
Replacement of eroded tubes/ bends in rear arch water wall / extended water wall / water wall hanger tubes at First Pass. ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Replacement of eroded tubes/ bends in Platen super heater / reheater / steam cooled spacer tubes at First Pass. (Per Joint) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Replacement of eroded boiler roof tubes / bends. (Per Joint) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Reinforcement of eroded weld joints / tubes / surfaces of water wall tubes at First pass. (Half portion of the tube inside the furnace) (Per RMT) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED...
Fin plate / attachment welding / Pad welding of water wall tubes around soot blower/ burner panels / corner tubes / S-Panels / rear arch tubes / extended water wall at First Pass. (Per RMT) ---- BIDDD...
Realignment of Platen SH coils with Spacer tube at First Pass. (Per coil) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Realignment of RH front & rear coil assembly with Spacer tube at First Pass. (Per coil) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Realignment of boiler roof tubes / bends. (Per tube) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Welding of scalloped bar plates at furnace bottom at First pass. (Per No.) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Rectification of leakages at peep hole doors in First Pass of boiler. (Per No.) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Cleaning / Clearing / Water washing of ash accumulated over SCW, LTSH, Extended SH side tubes, Economiser hanger tubes and Economiser upper/lower bank tubes at Second Pass. (Per Boiler) ---- BIDDDERS ...
Cleaning / Clearing / Water washing of ash accumulated over goose neck area below RH and FSH coils. (Per Boiler) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Cleaning of ash accumulated in economiser hoppers. (Per Hopper) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Cleaning & Assiting for D' Meter survey/ NDT of Economiser upper & lower bank coils and Economizer hanger tubes / bends at Second Pass. (Per Boiler) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOA...
26. Cleaning & Assiting for D' Meter survey/ NDT of LTSH coils/ bends and LTSH Hanger tubes at Second Pass. (Per Boiler) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Cleaning & Assiting for D' Meter survey/ NDT of Water wall screen tubes at Second Pass. (Per Boiler) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Cleaning & Assiting for D' Meter survey/ NDT of Final SH tubes / bends at Second Pass. (Per Boiler) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Cleaning & Assiting for D' Meter survey/ NDT of Steam cooled front / rear /side walls / access door bends / LRSB insert tubes / bends at Second Pass. (Per Boiler) ---- BIDDDERS ARE REQUESTED TO GO THR...
Lifting / lowering of LTSH / Economiser upper / Economiser lower bank bunch of two coils and repositioning the same (Per bunch of two coils) at Second Pass. ---- BIDDDERS ARE REQUESTED TO GO THROUGH T...
Replacement of eroded tubes / bends at LTSH supply / LTSH terminal / LTSH assembly / economiser hanger / economiser upper / lower bank assembly at Second Pass. (Per Joint) ---- BIDDDERS ARE REQUESTED ...
Replacement of eroded final super heater tubes / bends at second pass. (Per Joint) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Replacement of eroded SCW front / rear / side wall tubes and extended SH side tubes / access door bends / LRSB insert bends at Second Pass. (Per Joint) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UP...
Replacement of eroded water wall screen tubes / bends at Second Pass. (Per Joint) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Fin welding of steam cooled wall panels. (Per RMT) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Reinforcement of eroded weld joints / tube surfaces at Second Pass. (Half portion of the tube inside the furnace) (Per RMT) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Removal of damaged/eroded cassette baffles / refixing of new cassette baffles over the bends in economiser upper / lower bank coils and LTSH Coils at Second Pass. (Per Baffle) ---- BIDDDERS ARE REQUES...
Replacement of damaged/eroded shrouding’s over LTSH terminal tubes / ECO hanger tubes / LTSH coil / Economiser coil tubes/bends at Second Pass. (Per No.) ---- BIDDDERS ARE REQUESTED TO GO THROUGH TH...
Replacement of damaged/eroded shroudings over water wall hanger / water wall screen / extended water wall /SH Screen tubes & steam cooled spacer tubes at Second Pass. (Per No.) ---- BIDDDERS ARE REQUE...
Repair of skin casing in rear arch enclosure at second pass and inside the penthouse. (Per RMT) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Cleaning & Assiting for NDT / rectification of all Headers of Bent nipple welds and links in Penthouse. (Per Boiler) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Replacement of HP/ LP drain pipes/ tubes, Soot blowing lines, ACW lines and sampling lines in boiler area : Tubes OD up to 80mm dia. (Per Joint) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED ...
Replacement of HP/ LP drain pipes/ tubes, Soot blowing lines, ACW lines and sampling lines in boiler area : Tubes OD above 80mm. (Per Joint) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TEND...
Hydraulic Test of boiler post completion of all means of mechanical works on pressure parts. (Per boiler) ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Supply and usage of consumables asper the List detailed in Annexure-1 ---- BIDDDERS ARE REQUESTED TO GO THROUGH THE UPLOADED TENDER DOCUMENT.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Bid Document OH-3 2026-27.pdf
Tender Document • 1.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .