Loading…
Loading…
Tender Value
₹96.9 L
EMD Value
₹1.9 L
Closing Date
3 Sept 2026, 6:00 pm
SHATRUGHANA BOURI/ EE/ NBDD
Annex Building, Uttarkanya, Fulbari, Jalpaiguri
Construction of Cement Concrete Road from Dara Kali Mandir towards Aailpara Bargachi (Ch. - 0 to Ch. - 800) in Pukhuria G.P. Under Ratua - II Block in the District of Malda. (Length 0.80 Km. Width 3.75 Mtr.)
2026_NBDD_1038828_14
NBDD/BS/EE/ NIe-T- 35/2026-27 (Sl. No. 01 to 22)
Open Tender
CIVIL WORKS
Percentage
240 days
Malda
Please refer Tender documents.
6 documents required · 6 mandatory
₹1.9 L
Yes
20 Aug 2026
20 Aug 2026
7 Sept 2026
20 Aug 2026
3 Sept 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | ROAD WORK
Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal ofunserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm inthickness. (Reference to MoRT&H's specification clause 201)
3(II) By Mechanical Means
3(II)(A) In area of light jungle | 0.32 | Hectare | 59,747.31 | ₹19,120.33 |
| 2 | Compacting original ground supporting embankment
Loosening, leveling and Compacting original ground supporting
embankment to facilitate placement of first layer of embankment,
scarified to a depth Of 150 mm. mixed with water at OMC and then
compacted by rolling so as to achieve minimum dry density as given in
Table 300-2 & 300-1 for embankment construction. (Reference to
MoRT&H's specification clause 305.3.4). | 450 | Cu.m | 42.69 | ₹19,211.58 |
| 3 | Construction of Subgrade and Earthen Shoulders
Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Reference to MoRT&H's specification clause 305). Cost of compensation for Earth material & its carriage from private land at 5km distance have been included in the rate. | 2,400 | Cu.m | 306.73 | ₹7,36,150.08 |
| 4 | Construction of granular sub-base by providing graded materials such as natural sand/crushed gravel/crushed stone/combination depending upon the required grading , spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator and compacting with vibratory roller toachieve at least 98% of the maximum dry density for the material determined as per IS:2720 (Part 8), complete as per clause 401 desire density, complete as per clause 401
Rate per cum for grading-III Material, Using Pakur Variety | 306 | Cu.m | 2,536.63 | ₹7,76,210.07 |
| 5 | Providing, laying, spreading and compacting stone aggregates of
specific sizes to water bound macadam specification including
spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stagesto proper grade and camber, applying and brooming requisite type ofscreening/ binding Materials to fill up the interstices of coarse aggregate,watering and compacting to the required density (Reference to MoRT&H's specification 404).
9A By Manual Means
9A(ii) Grading-2 (Table 400-9)
9A (ii)(b) Using Screening (Table 400-10)
Type-B (11.2 mm aggregate) | 229.5 | Cu.m | 4,216.25 | ₹9,67,628.5 |
| 6 | Plain/Reinforced cement concrete in open foundation complete all including vibrating and compacting, finishing, curing, sampling, testing etc. as per drawing and Technical Specifications (Reference to MORT&H's specifications 1500, 1700 & 2200).
PCC Grade M30
Using Concrete Mixer
1) Add 3.5% extra cost as formwork over cost of material
2) Needle Vibrator is an item of minor T & P which is already included in overhead charges. Hence not added in rate analysis of cement concrete works. | 612 | Cu.m | 7,704.87 | ₹47,15,379.83 |
| 7 | CROSS DRAINAGE WORK
Excavation for Structures
Earth work in excavation of foundation of structures as per
drawing and technical specification, including setting out, construction of
shoring and bracing, removal of stumps and other deleterious matter,
dressing of sides and bottom, backfilling the excavation earth to the
extent required and utilising the remaining earth locally for road work
(Reference to MoRT&H's specification clause 304).
13(i) Ordinary soil
13(i)A Manual Means (Depth upto 3 m) | 11.21 | Cu.m | 409.12 | ₹4,586.21 |
| 8 | Sand Filling in Foundation Trenches with good local sand free from earth not exceeding 150 mm compacted thickness including inundating each layer by profuse water and porking and rammimg layer by layer. Quality of sand is to be approved by the Engineer-in-charge.(Reference to MORT&H's specification 304). | 8.64 | Cu.m | 1,326.85 | ₹11,463.99 |
| 9 | Plain/Reinforced cement concrete in open foundation complete all including vibrating and compacting, finishing, curing, sampling, testing etc. as per drawing and Technical Specifications (Reference to MORT&H's specifications 1500, 1700 &
2200).
PCC Grade M15
Using Concrete Mixer | 9.19 | Cu.m | 6,686.78 | ₹61,451.48 |
| 10 | RCC pipe 1000 mm dia NP-3 spigot | 5 | Metre | 7,020.74 | ₹35,103.7 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
Tendernotice_2.pdf
PDF • 0.51 MB
BOQ_2551935.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].