Loading…
Loading…
Tender Value
₹42.0 L
EMD Value
₹42,000
Closing Date
20 May 2026, 6:00 pmClosed
Chief Executive Authority, Surat Urban Development Authority, Surat.
CR to various Roads of T.P & D.P Schemes in kamrej taluka under surat urban devlopment area.
304945
SUDA /CB/02/2025-26
Open
Civil - All
Surat
3 documents required · 3 mandatory
₹1,770
Chief Executive Authority, Surat Urban Development Authority, Surat.
₹42,000
13 May 2026
13 May 2026
13 May 2026
20 May 2026
13 May 2026
Name of Work:- CR to various Roads of T.P & D.P Schemes in kamrej taluka under surat urban devlopment
Memorandum showing items of work to be carried out
1) The Schedule B shall be read in conjunction with the Instruction to Bidders, General and Special Conditions of Contract, Scope of Services and
Specifications.
2) The quantities given in the Schedule B are estimated and provisional and are given to provide a common basis for bidding. The basis of
payment will be actual quantities of work ordered and carried out and valued at the rates and prices tendered in the Schedule B, where
applicable and otherwise at such rates and prices as the Engineer may fix within the terms of Contract.
3) The rates and prices tendered in the Schedule B shall, except in so far as it is otherwise provided under the contract, include all equipment,
construction plant, labour, supervision, materials, erection, maintenance, testing of input material delivered, profit, taxes and duties together
with all general risks, liabilities and obligations set out and implied in the Contract. The Contractor shall provide all the equipment related to the
4) The percentage in schedule ‘B’ must be given in words and figures.
Item Quantities Item of work Estimate Rates Unit Total Amount
Item Quantities Item of work Estimate Rates Unit Total Amount
No. estimated but In figure In words according to
may be more Rs. Ps. estimated
1 or 2less 3 4 5 6 quantities
1 712.91 Box cutting the road surface to proper slope and camber for 109.41 Rupees One cum
making a base for road work including removing the Hundred Nine
excavated stuff and depositing on the road side slope as And Paise Forty
directed upto 50Mt.lead. One Only
2 475.28 Construction of compacted layer of required thickness with 778.71 Rupees Seven cum
granular sub base of river bed material (Grade-III) by Hundred Seventy
providing close graded material as per gradation of MOST Eight And Paise
from available and approved source and location of river Seventy One Only
bed collecting at stack yard for screening and maintaining
gradation by mixing required size if required carriage of a
mix material to work site spreading uniform layers.
3 475.28 Providing, laying, spreading and compacting graded stone 1302.90 Rupees One cum
aggregate to wet mix macadam (WMM) in two layer as per Thousand Three
specification and drawing including premixing the Material Hundred Two And
with water at OMC in mechanical mix plant carriage of Paise Ninety Only
mixed Material by tipper to site, laying in uniform layers
with paver in sub- base / base course on well prepared
surface and compacting with vibratory roller to achieve the
desired density as per MORT&H fifth revision clause-
4 2327.95 Providing and applying Bituminous Prime coat on wet mix 124.23 Rupees One SQ M
macadam surface with mechanical sprayer using Bitumen Hundred Twenty
emulsion SS1 Grade @ 7.5 kg/10 per sqm Including Four And Paise
preparing surfaces by brushing with wire brushes for Twenty Three
removing caked mud, all loose dirts, heating the bitumen Only
etc complete as per specification clause 502 of MoRT & H
fifth Revision.
5 274.00 Providing and laying compacted 50 mm thick dense graded 4978.29 Rupees Four MT
bituminous macadam in One layer with batch mix plant Thousand Nine
producing an average output of 60 tonnes per hour, tack Hundred Seventy
coat at the rate of 2.50 kg/ 10 m2 of Bitumin grade RS-1, Eight And Paise
Bitumen Grade VG-30 in mix at the rate of minimum 4.50% Twenty Nine Only
or as per design mix, using crushed aggregates of grading -I,
premixed with bituminous binder and filler, transporting the
hot mix to work site, laying with a approved self propelled
paving machine equipped with an electronic sensing device
paver finisher with sensor control to the required grade,
level and alignment, rolling with smooth wheeled, vibratory
and tandem rollers to achieve the desired compaction as
per MORTH specification clause No. 505 complete in all
6 134.00 Providing and laying 25 mm thick Semi Dense Bituminous 5201.50 Rupees Five MT
Concrete with B.T. aggregate as per MORTH gradation Thousand Two
asphalt grade VG-30 for mixing @ 50.00 KG. / M.T. i.e. 5.0% Hundred One And
by weight of total mix including heating and mixing the Paise Fifty Only
aggregate and asphalt by continuous of batch mix plant and
hot laid process laying with paver finisher and consolidation
with roller as per MORTH specification to achieve desire
density, including cost all materials equipments, tools and
plants, oil, kerosene, firewood, labour charges etc.
complete using contractor's own machineries drum mix
plant and paver finisher etc. complete.
7 107.00 Providing and Laying 20 mm thick mix Seal Surface for patch 5235.41 Rupees Five MT
work (paver patta) using B.T. stone aggregate chips at the Thousand Two
rate of 0.66 cum/M.T. as per gradation of MORTH and Hundred Thirty
emulsion for tack coat at the rate of 2.50 Kg/Sqm and Five And Paise
asphalt VG-30 for mixing at 5.09% (i.e.50.90 kg./M.T.) of Forty One Only
total mix heating & mixing by continuous batching of drum
mix plant and transporting, spreading, laying the same by
paver finisher and consolidation with vibratory power roller
including cost of fuel, kerosene, lubricant, labour charges
etc. comp. using contractor's own drum mix plant,
necessary equipments, tools and plants etc. complete.
8 2327.95 Providing and applying asphalt painting by mechanical 69.69 Rupees Sixty Nine SQ M
sprayer on B.T. surface using bitumen grade Vg-30 at the And Paise Sixty
rate of 5.00 kg/10 Sq.m & spreading stone dust @ 0.03 Nine Only
cumt./10 Sqm on painted surface including operating cost
of contractor own equipment, fuel, lubricants, carting of
required materials all labour and material cost, preparing
surface by brushing with mechanical broom/compressed air
and finally fanning the cleaned surface with gunny bags to
remove all loose dirts etc. complete.
9 42.00 Providing services of Hydraulic Excavator with fuel as per 1040.30 Rupees One Hour
instruction given by Engineer in charge in suda area. Thousand Forty
And Paise Thirty
10 20.00 Providing services of male/female labour for various work 636.50 Rupees Six Each/
including earthwork,jungle cutting, road side dressing work, Hundred Thirty day
clearing waterway of CD works, etc with all necessary tools Six And Paise Fifty
equipments with fuel and transportation complete and as Only
per instruction by Engineer in charge.
Rupees Forty One Lakh(s) Ninety Six Thousand Four Hundred Forty Seven And Paise Eight Only
I/We am/are willing to carry out the work at _______ % above/below ( percent should be written in figures
and in words) of the estimated rates mentioned above. Amount of my / our tender works out as under.
*Estimated amount *Estimated amount
put to tender 4196447.08 put to tender
Deduct ___ % below Rs. _________ Add ____ % above Rs. _________
Net Rs. _________ Total Rs. _________
*( Please strike out which ever is not applicable )
Note 1:- All work shall be carried out as per public work department hand book and other specifications of Division or as directed
Note 2:- Rates quoted include clearance of site (Prior commencement of work and its close) in all respects and hold good for work
Note 3:- under all condition,
The Contractor shallsite, moisture/
exhibit a boardweather etc
as per Government Circular No. BDG/ 3277/ 1657/ N Dated 26/1/1997 S (M.GUJ) with
Note 4:- detailed specification
The Contractor and
is solely details of work
responsible and
to bare allamount involved
applicable taxes at
i.e.site without
G.S.T. anyDepartment
etc. and payment as directed by the Engineer-in-
will not entertain any
contractor representation to reimburse any financial burden due to applicable taxes i.e. G.S.T. etc.
Signature of Bidder Executive Engineer
Surat Urban Development Authority
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
02-01-SBD.pdf
02-02-Schedule-B.pdf
02-03-Technical Specification.pdf
Download all tender documents and submit your bid