Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹1.5 L+₹43,586 (39.2%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L2₹1.5 L+₹43,586 (39.2%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | gagan singh lsm govt contractor L1 | shamsher singh govt contractor L2 | PANJA RAM LSM L2 |
|---|---|---|---|---|---|---|
| 1.00Sanctioned schedule rates/ Estimated rates | ||||||
| 1.10Resin Extraction: Crop setting on chil trees as per resin tapping manual available with lot incharge, extraction of resin in Govt. forests through rill method, soldering of resin filled tins as per specification, carriage of extracted resin through mule/manual labour to sub depot/transit depot, if any established in the forests at a safer place approved by the Divisional Manager, further carriage to approved specified road side depot as per tender list, stacking of resin filled tins, loading of resin filled tins into the vehicle and further transportation of extracted resin to Rosin & Turpentine Factory Bilaspur including all materials to be rerquired for resin tapping. | ||||||
| 1.20No. of blazes (Approximate) =781 | ||||||
| 1.30Minimum reserve yield fixed per 1000 resin blazes (in Qtl) =45 | ||||||
| 1.40 | Total quantity at (Col.-D17) of net resin to be extrected in Qtls. And bare rate at (Col.-F17) per qtls. of the lot for resin extraction, carriage upto Road Side Depots including cost of all the required material etc. | 35.15 | Qtls | 2,900 ₹1,01,935 Lowest | 4,000 ₹1,40,600 | 4,000 ₹1,40,600 |
| 2.00 | Bare rate at (Col.-F18) for transportation of resin including loading charges from RSD to R&T Factory ,BILASPUR | 35.15 | Qtls | 260 ₹9,139 Lowest | 400 ₹14,060 | 400 ₹14,060 |
Tender Value
₹73,358
EMD Value
₹8,000
Closing Date
16 Jan 2026, 2:00 pmClosed
DM FWD Dharamshala
DM FWD Dharamshala
Resin Extraction, carriage and TT
2026_FDC_125379_14
Resin Extraction, carriage and TT
Open Tender
Agricultural or Forestry
Item Rate
365 days
DM FWD Dharamshala
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Divisional Manager
₹8,000
27 Jan 2026
10 Jan 2026
16 Jan 2026
10 Jan 2026
16 Jan 2026
10 Jan 2026
Resin Extraction: Crop setting on chil trees as per resin tapping manual available with lot incharge, extraction of resin in Govt. forests through rill method, soldering of resin filled tins as per specification, carriage of extracted resin through mule/manual labour to sub depot/transit depot, if any established in the forests at a safer place approved by the Divisional Manager, further carriage to approved specified road side depot as per tender list, stacking of resin filled tins, loading of resin filled tins into the vehicle and further transportation of extracted resin to Rosin & Turpentine Factory Bilaspur including all materials to be rerquired for resin tapping.
No. of blazes (Approximate) =781
Minimum reserve yield fixed per 1000 resin blazes (in Qtl) =45
Total quantity at (Col.-D17) of net resin to be extrected in Qtls. And bare rate at (Col.-F17) per qtls. of the lot for resin extraction, carriage upto Road Side Depots including cost of all the required material etc.
Bare rate at (Col.-F18) for transportation of resin including loading charges from RSD to R&T Factory ,BILASPUR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_184684.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .