Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC CHAKKALAKKAL H KOTTAT P O | L1 | Accepted-AOC l1 | |
| 2 | L2₹4.1 L+₹38,904 (10.5%)Rejected-AOC THRISSUR KERALA KL | PALAKKAD | KERALA | 678001 | L2 | Rejected-AOC l2 |
Tender Value
₹3.6 L
EMD Value
₹8,936
Closing Date
4 Feb 2025, 6:00 pmClosed
Assistant Executive Engineer
Electrical Wing Irrigation Subdivision Chalakkudy
GENERAL AMC 2024 25 Peelarmuzhi 1 and 2 Chathankulam Kannankuzhy LIS Fully Comprehensive Annual Maintenance Contract for the year 2024 25 General Electrical Work
2025_Irrig_728137_28
C-ETN-JAN/EL/24-25
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
Chalakkudy
Please refer Tender documents.
10 documents required · 10 mandatory
₹790
₹8,936
22 Apr 2025
23 Jan 2025
6 Feb 2025
23 Jan 2025
4 Feb 2025
23 Jan 2025
Amount
OD223250/2024-2025:Fully Comprehensive Annual Maintenance contract of 1-3 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , starter pipes and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed
OD223251/2024-2025: Fully Comprehensive Annual Maintenance contract of 31-60 HP slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc ,including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required ( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD223252/2024-2025: Fully Comprehensive Annual Maintenance contract of above110 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board ,etc, including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required ( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD223253/2024-2025: Fully Comprehensive Annual Maintenance contract of 61-110 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc, including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD223254/2024-2025: Fully Comprehensive Annual Maintenance contract of 11-30 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc, including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD223255/2024-2025:Dismantling the 61-110 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling,including scrapping, cleaning and painting with enamel paint.
OD223256/2024-2025:Dismantling the above 110 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, including scrapping, cleaning and painting with enamel paint.
OD144017/2024-2025:Dismantling the61-110 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD144025/2024-2025:Dismantling the 61-110 HP starters by parts draining out the oil, cleaning the tank, terminal contacts, cutting, leveling and polishing the contacts, cleaning contacts wherever necessary, checking the tripping mechanism, replacing the damaged wires, attending minor repairs, cleaning the oil, (in case of oil starters), refitting, resetting and making the starter in good working condition.
OD144026/2024-2025:Dismantling the above 110 HP starters by parts draining out the oil, cleaning the tank, terminal contacts, cutting, leveling and polishing the contacts, cleaning contacts wherever necessary, checking the tripping mechanism, replacing the damaged wires, attending minor repairs, cleaning the oil, (in case of oil starters), refitting, resetting and making the starter in good working condition.
OD144027/2024-2025:Refitting 61-110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD144024/2024-2025: Refitting above 110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD203411/2024-2025: Replacing old bearing and supply new bearing bearing no 6313SKF/FAG OR equivalent
OD203413/2024-2025: Replacing old bearing and supply new bearing bearing no 6310SKF/FAG OR equivalent
OD203412/2024-2025: Replacing old bearing and supply new bearing bearing no 6312SKF/FAG OR equivalent
OD203414/2024-2025: Replacing old bearing and supply new bearing bearing no 6309SKF/FAG OR equivalent
OD203415/2024-2025: Replacing old bearing and supply new bearing bearing no 6318 SKF/FAG OR equivalent
13.10:Supplying and erection of 11 KV pin insulator complete with large steel head G.I. pin, nuts, washers etc. as required
13.13:Supplying and erection of three piece nonlinear resistor type lightning arrestor suitable for 3 wire. 11 KV overhead lines with rated voltage 9 KV (rms) with a nominal discharge current rating of 5 KSA and complete with galvanised clamping arrangement, G.I. bolts, nuts, washers etc. as required.
OD19843/2024-2025:Supplying and erection of 11 KV AB Switch Male & Female contact complete all acessories etc. as required
OD19844/2024-2025:Supplying and erection of 11 KV post top insulator complete with large steel head G.I. pin, nuts, washers etc. as required
OD19845/2024-2025:Charges for painting the pole, channel etc with 2 coat epoxy paint over a coat of primer as required
Paulson M I (BID ID -2091948)
Bidder Name
BIJU JOSE
Paulson M I
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1162796.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .