Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.2 LAdmitted-Fee/PreQual/Technical/Finance AT WARD 10 PO BIRAMITRAPUR DIST SUNDARGARH ODISHA | BIRAMITRAPUR | SUNDARGARH | ODISHA | +0.00% | ₹6.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹6.2 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹6.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹6.2 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹6.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹6.2 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹6.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹6.2 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹6.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.2 L
EMD Value
₹6,191
Closing Date
15 Jun 2026, 5:00 pmClosed
EXECUTIVE OFFICER, BIRMITRAPUR MUNICIPALITY
EXECUTIVE OFFICER, BIRMITRAPUR MUNICIPALITY
construction of cc drain with cover slab from Ajay house to Pradhan house Banmunda
2026_ORULB_130676_12
EO/BRMP/02/2026-27
Open Tender
Civil Works - Others
Percentage
60 days
BIRMITRAPUR MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹6,191
Yes
22 Jun 2026
4 Jun 2026
17 Jun 2026
4 Jun 2026
15 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantalling & removing cement concrete including stacking the udeful marerials for reuse & removing the debries within 50 mtr lead.Dismantalling & removing cement concrete including stacking the udeful marerials for reuse & removing the debries within 50 mtr lead. | 14 | cum | 877.16 | ₹12,280.24 |
| 2 | Earth work in excavation of foundation in hard soil with initial lead and lift including rough dressing and leveling the bed and depositing the soil away as directed by E.I.C . | 60.24 | cum | 282.88 | ₹17,040.69 |
| 3 | Sand filling with filling sand inside F and P including watering and ramming, cost of material, labour, conveyance all taxes T and P etc. complete. | 7.5 | cum | 738.69 | ₹5,540.18 |
| 4 | Metal concrete (1:3:6) using 40mm size CBG metal with all cost of material, labour, conveyance, royalty, taxes T and P etc. complete. | 7.5 | cum | 6,182.65 | ₹46,369.88 |
| 5 | R.C.C. work of M 25 using 20mm and down graded hard granite Crusher broken chips including compacting, curing, all cost of material, labour, conveyance, royalty, taxes T and P etc. complete including centering and shuttering. | 37.32 | cum | 6,543.63 | ₹2,44,208.27 |
| 6 | Labour for M.S reinforcement for cutting, bending, binding, tying the grills and placing in position etc. including cost of binding wire 18 to 20 guage and cost of steel. | 15 | Qntl. | 8,597.28 | ₹1,28,959.2 |
| 7 | Rigid smooth centering and shuttering to C.C. work including false work and dismantling them after casting complete in Ground Floor.
Wall | 205.12 | sqm | 249.82 | ₹51,243.08 |
| 8 | Slab | 134.5 | sqm | 769.19 | ₹1,03,456.06 |
| 9 | Towards Photograph of project, display board & other unforseen items | 1 | pc | 10,000 | ₹10,000 |
stage.html
html • 0.04 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_594244.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .