Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.2 LAccepted-Finance A R AND M O ON VARIOUS ROAD IN SECTION NALAGARH 1 UNDER NALAGARH SUB DIVISION SH HIRING OF JCB | L1 | Accepted-Finance Eligible as per NIT Conditions | |
| 2 | L2₹12.6 L+₹40,000 (3.28%)Accepted-Finance | L2 | Accepted-Finance Eligible as per NIT Conditions | |
| 3 | L3₹12.8 L+₹60,000 (4.92%)Accepted-Finance V P O MILLAH TEHSIL SHILLAI DISTT SIRMOUR 173029 | SIRMAUR | HIMACHAL PRADESH | 173029 | L3 | Accepted-Finance Eligible as per NIT Conditions |
| Sl No | Description | Qty | Unit | Rajinder Kumar Thakur L2 | Kuldeep Singh L3 | Manoj Kumar L1 |
|---|---|---|---|---|---|---|
| 1.00 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Seola Kotla Balwar Ghiyana whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e pump operator/ Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge. | 1 | Job | 12,60,000 ₹12,60,000 | 12,80,000 ₹12,80,000 | 12,20,000 ₹12,20,000 Lowest |
| 2.00Description of main components of the scheme is as under:- Civil works: 1 No pump house, Slow sand filter unit, clear Tank, Percolation well, Main Storage tank and 4 Nos sub storage tank. Rising main: LWSS Seola Kotla Balwar Ghiyana etc. 1st Scheme:Booster stage 80 mm dia 80 Rmt, 1st stage 80 mm dia=1410 Rmt. Pumping machinerey: LWSS Seola Kotla Balwar Ghiyana 1st Scheme: Booster stage 2x10 HP=20 HP, 1st stage 2x60=120 HP Approx. lenght of distribution system=72.00KM No. of storage tank 4 Nos, 21 Nos of habitation, Total working hours 48- through, 8 Nos persons. Indicators to be monitored: Nos of complaints received thorugh different mode such as C.M. Sanklap E-Samadhan, complaint register and toll free No.etc, Quality of water lifted per day. No. of pumping hours per day and energy consumption per day. | ||||||
Tender Value
Refer Docs
EMD Value
₹24,380
Closing Date
17 Nov 2025, 2:00 pmClosed
EE JSV Division Jagatkhana
EE JSV Division Jagatkhana
SH. Operation of Pumping machinery and distribution system of water supply for sector storage tanks to different habitations for one year
2025_HPIPH_119752_1
7385-7484 dt 04.11.2025
Open Tender
Civil Works - Others
Item Rate
Jukhala
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹24,380
15 Dec 2025
6 Nov 2025
17 Nov 2025
6 Nov 2025
17 Nov 2025
6 Nov 2025
Amount
Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Seola Kotla Balwar Ghiyana whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e pump operator/ Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge.
Description of main components of the scheme is as under:- Civil works: 1 No pump house, Slow sand filter unit, clear Tank, Percolation well, Main Storage tank and 4 Nos sub storage tank. Rising main: LWSS Seola Kotla Balwar Ghiyana etc. 1st Scheme:Booster stage 80 mm dia 80 Rmt, 1st stage 80 mm dia=1410 Rmt. Pumping machinerey: LWSS Seola Kotla Balwar Ghiyana 1st Scheme: Booster stage 2x10 HP=20 HP, 1st stage 2x60=120 HP Approx. lenght of distribution system=72.00KM No. of storage tank 4 Nos, 21 Nos of habitation, Total working hours 48- through, 8 Nos persons. Indicators to be monitored: Nos of complaints received thorugh different mode such as C.M. Sanklap E-Samadhan, complaint register and toll free No.etc, Quality of water lifted per day. No. of pumping hours per day and energy consumption per day.
Rajinder Kumar Thakur (BID ID -582024)
Kuldeep Singh (BID ID -582044)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
PWD6.pdf
Tender Documents • 0.68 MB
PWD8.pdf
Tender Documents • 1.42 MB
TC.pdf
Tender Documents • 0.52 MB
BOQ_175309.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .