Supplying & Installation to 45 KW Solar Panel System At Valod Division Office.
342858
E Tender Notice No.18 of 2026-27
Open
Electrical - All
Works
Tapi
11 documents required · 11 mandatory
₹900
Executive Engineer Ukai Division No.1,Ukai
₹20,000
7 Sept 2026
7 Sept 2026
7 Sept 2026
21 Sept 2026
7 Sept 2026
Name of work : Supplying & Instolation to 45 KW Solar Panel System at Valod Division Office
Qty Description Item Rate Per Amount
Supply, Installation, Testing & Commissioning of following size of Grid Tied Solar
Power Plant with
Solar Panels (ALMM approved): Frame Material : Anodized Aluminum alloy
Frame With Twin Wall Profile, Front Cover : High Transmission Low-Iron
Tempered Glass (AR Coated), High efficency and positive power tolerance
Pmax: 0/+5, Module Efficiency should be approx. 19.5%-22%, Normal
operating temperature 45'C, Junction Box with Waterproof IP67 & MC4
Compatible and Enclosed with Bypass diodes, 100% Electroluminescence test
to ensure error free Modules, Thep. temp. co-efficient of the PV module shall
equal or better than -0.45%/degree C. Solar PV modules of minimum fill factor
75% to be used. Unit Production:- More than 4.5 Unit /kw /day (Actual)(1Year
Avg) With 10 year Product warranty and 25 year Linear Power Warranty includes
all mechanical and electrical parameters of the Solar panel. Modules must be
complied to the DCR(Domestic content requirements). The Ration of AC to DC is
5:6 for the Installation capacity which are given in AC KW.
Solar Inverter: MPPT Range: MPPT Range: 80-1000 V , Max efficiency: 97.5% -
98.9%, O/p Frequency: 50/60Hz, Operating Altitude (m) ≤4000, O/p Power
Factor: ~1, O/P THDi: <3%, Operating Tempreture Range: -25~60°C, Integrated
protection of Inverter are Anti-islanding Protection, Input Reverse Polarity
Protection, Insulation Resistor Detection, Ground fault protection, Residual
Current Monitoring Unit, Output Over Current Protection, Output Short Circuit
Protection, Output Over Voltage Protection, PV array string fault Protection.
Protection Degree: IP65, User Interface LCD & APP, Datalogger &
Communication: GPRS / Wi-Fi.
Integrated, Input Reverse Polarity Protection Integrated, Insulation Resistor Detection
Integrated, Residual Current Monitoring Unit Integrated, Output Over Current Protection
Integrated, Output Short Circuit Protection Integrated, Output Over Voltage Protection
Integrated, Protection Degree: IP65, User Interface LCD & APP,Datalogger &
Communication: GPRS / Wi-Fi, Module Mounting Structure: The mounting (Rectangular
pipe / square pipe / circular pipe) with requisite cross bars, nuts and bolts, etc. shall be
Hot deep galvanized with minimum 80micron coating. The Rectangular / square /circular
hollow pipe section used for the structure should have a minimum thickness of 2.0 mm.
other than above, the material thickness should be minimum 2.5 mm. A certificate of a
structural engineer certifying the strength and stability of the mounting structure to
withstand the weight and wind speed of 150 km/hour throughout the life span of 25 years
of the system, shall be submitted by the vendors. Hot Dipped Galvanized steel coils.
suitable arrangement for base plate for foundation , solar panel mounting, the structure
should be suitable for carry the load of solar panel,wiring, sprinkler system etc. with
necessary foundation work/wall mount, j bolt, anchor fastner etc. the nut bolt used for
installtion of stucture should be (SS 304) quality.The ground clearance of the bottom
most edge of solar panel shall not be less than 300 mm to 1200 mm or as per site’s
technical/feasibility requirement.
a. Column –The minimum section (thickness) should be 60MM*40MM
b. Rafter - The minimum section (thickness) should be 60MM*40MM
c. Purlin - The minimum section (thickness) should be 40MM * 40MM Balane of System
with necessary Swichgears (Suitabel size and protection of ACDB & DCDB), inter
connecting wiring, earthing system as per the CEIG drawing approval, lightining arrester
system as per the CEIG drawing approval, all liasoning work with various gov.
dipartment like state nodal agency,DISCOM & CEIG is included in agency scope
(Excluding All charges namely GEDA Application fees, Solar connectivity
Charges, Meter connectivity Charges, Meter testing Charges and system
stability/strenthning charges.)
Rupees FourtyTwo Thousand
45 (D) Grid Tied Solar Power System: 26 - 50 kW (3 - phase) 42,156.39 One Hundred FiftySix Paise PER KW
ThirtyNine Only
Providing & erecting Automatic solar panel cleaning system for solar power
projects which includes necessary plumbing work (UPVC pipes and accessories)
from source of water to project site (upto 30 meters),Suitable size of sub
mercible/ open well motor, necessary wiring for motor and sprinkler system with
safety, timer circuit for automatically on/off the sprinkler system, necessary size
oand number of nozzles/JET (minimum 1 Nozzle/Jet per module).
Rupees One Thousand Eight
45 (D) 21KW-50KW Cleaning System 1,841.23 Hundred FourtyOne Paise PER KW
TwentyThree Only
I/We am/are willing to carry out the work at ……………………………………………% above/below percent (shouldbe written in figured and words) of the estimated rates
mentioned above. Amount of my/ourEstimated
tender works out as under.
amount Estimated amount
Put to tender Rs______________ Put to tender Rs______________
Deduct : ___________ % Above RS__________ Deduct : ___________ % Below RS__________
*(Please strike out whitchever is not applicable).
Note 1 – All work shall be carried out as per public works department handbook and other specification of Division ot as directed.
Note 2 – All the columns is schedule should be filled in ink and the total of the entries in the last column should be struck by the contractor under his signature.
Note 3 – Rates quoted include clearance of site (prior commencement of work and at its close ) in all respects and hold good for work under all conditions, site,
moisture,weather etc.
Note 4 – To be continued on additional sheets, if found necessary.
Note 5 - The rates quoted by the Contractor must be inclusive of all taxes prevailing on due date of bid submission except GST. However, any subsequent changes in
the tax structure by Government after due date of bid submission will be compensated (+/-) on availability or submission of actual documentation. Contractor will
have to intimate Engineer regarding changes occurred in the tax structure after bid submission. If the contractor fails to provide such information and if any financial
obligation may arise due to change in tax structure, same will be recovered from the contractor. GST will be paid separately on the bills. Hence, it is the responsibility
of the contractor to pay the GST to the concerned Authority.
Deputy Executive Engineer Executive Engineer
Electrical Sub Division Ukai Division Ukai
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
FINAL _ SBD 45 KW.pdf
SCH B 8.pdf
2.0 Special condion Electric (5).pdf
Make List 8.pdf
5.0 Approved make list 2013 2014 Part 1.pdf
6.0 Approved make list 2013 2014 Part 2.pdf
E-Tender Notice No.18 of 2026-27.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .