Tender Value
₹17.7 L
EMD Value
₹18,000
Closing Date
29 May 2026, 6:05 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer (R & B) Division, Rajpipla (State)
CR/FDIR to Various Road Under Construction ( R & B ) Sub Division Rajpipla Dist.Narmada. (Supplying, Spreading & Rolling The Road Materials, Rubble, Machinary and Labour )
305622
03 of 2026-27
Open
Civil Works - Roads
Vadodara
7 documents required · 6 mandatory · 1 optional
₹900
Executive Engineer Rajpipla (R&B) Division, Rajpipla
₹18,000
15 May 2026
15 May 2026
15 May 2026
29 May 2026
15 May 2026
Name of Work : CR/FDIR to Various Road Under Construction ( R & B ) Sub Division Rajpipla
Dist.Narmada. (Supplying, Spreading & Rolling The Road Materials, Rubble, Machinary and
BILL OF QUANTITIES
Item Description of Item (with brief specification and reference to book of
Quantity Unit Rate Amount
No. specifications)
1 Collecting, carting and stacking Machine Crushed metal of 25 mm to
mm in size on road side including filling measure boxes etc. complete. 200.00 Cum 529.24
2 Collecting, carting and stacking Machine crushed metal of 40 mm to
mm in size on road side including filling measure boxes etc. complete. 200.00 Cum 486.82
3 Collecting, carting and stacking Stone Dust of approved quality on road
side including filling measure boxes etc. complete.
4 Construction of 125 mm thick compacted GRANULAR SUB BASE ( Grade-
I , Crushed B T materials of 53 mm to 9.5 mm @ 50 %, 9.5 mm to
mm @ 20 %, Below 2.36 mm @ 30 % ) by providing close graded
matrial , mixing in a machanical mix plant at OMC, carriage of a mix
material to work site, spreading uniform layers with motor grader on
prepared surface and compacting with vibratory power roller to
achieve desire density , complete clause as per
5 Providing and laying 250mm thick wet mix macadam (W.M.M.) (Two
layers each of 125 mm) using machine crushed black trap aggregate of
40 to 50 mm size in the material as per MOST specification including
premixing the material with water at OMC in mechanically mix plant,
carriage of mix material by contractor's own tipper to site of work 200.00 Cum 938.29
including laying in uniform layers with paver in sub base/ base course
on well prep[ared surface and compacting with vibratory roller to
achieve the desired density.
6 Collecting, carting and stacking Rubble stone of approved quality on
road side including filling measure boxes etc. complete.
7 Collecting, carting and stacking Quarry Spaull of approved quality on
road side including filling measure boxes etc. complete.
8 Providing Vibratary Soil Compactor/ Vibratary Roller with operator incl.
cost of fuel and lubricants as and where required as per necessary. 140.00 Hr 850.79
9 Engaging JCB with operator with cost of fuel and lubricants as and
where required with all lead and lift.etc. complete.
10 Engaging tractor with trooley in Driver with front Pawdi/Cultivator and
trolley of hydraulic type and labour for full loading and unloading
earth/debries from site of work as and where directed with all lead
and lift. etc. complete.
11 Providing Truck / Dumper with Driver incl. cost of fuel and lubricants as
and where required as per necessary. Up to carring Capacity 25.00 MT 30.00 Day 5050.00
within 15.00 Km Lead
12 Supplying fof Labour for Various types of works on roads with
necessaryequipments as directed ( for eight working hour ) with
required instruments. (D) Normal Shift 8:00 to 12:00 &14:00 to 18:00.
In Words: Twenty Six Lakh Seventy Five Thousand Thirty Six Rupees and Eighty Paise Only.
I/We am/are willing to carry out the work at… % above/below percent(Should be written in figures and words) of the estimated
rate mentioned above. Amount of my /our tender works out as under.
* Estimated Amount * Estimated Amount
put to tender put to tender
Deduct :…………% Below Add :………%Above
In Words …………………………………… In Words………………………………
* (Please strike out whichever is not applicable).
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge
for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement
Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual
mix design the cost of difference of cement consumption have been deducted from the rate of original item at the rate
of input rate mentioned in all the tender.
5 The amount of dismentalled credit materials at Rs. 0 shall be deducted from first R.A. Bill.
6 The Contractor will have to submit the mix design for different grades his own cost before execution as directed and to
be approved from the engineer in charge.
Dy. Executive Engineer Executive Engineer
Const (R&B) Sub-Division Rajpipla (R&B) Division
Rajpipla Rajpipla
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
0 CHECKLIST.pdf
1 E Tender Notice.pdf
2 Vol 1 SBD Book.pdf
3 VOL 2 Specification index.pdf
4 GR.pdf
5 BOQ.pdf
Download all tender documents and submit your bid