Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Finance ANDHRA POWER HOUSE DIVISION HPSEBL CHIRGAON 171208 | SHIMLA | HIMACHAL PRADESH | 171208 | ₹1.2 L | L1 | Admitted-Finance |
| 2 | L2₹1.2 L+₹2,239.70 (1.83%)Admitted-Finance | ₹1.2 L+₹2,239.70 (1.83%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 L+₹2,573.15 (2.10%)Admitted-Finance BANIKHET NAVEEN KUMAR BANIKHET CHAMBA HIMACHAL PRADESH 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | ₹1.3 L+₹2,573.15 (2.10%) | L3 | Admitted-Finance |
| 4 | L4₹1.3 L+₹4,707.45 (3.84%)Admitted-Finance | ₹1.3 L+₹4,707.45 (3.84%) | L4 | Admitted-Finance |
| 5 | L5₹1.3 L+₹7,443.87 (6.07%)Admitted-Finance | ₹1.3 L+₹7,443.87 (6.07%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Rajesh Kumar L1 | Dinesh Kumar L7 | ANISH RANA L5 | Hakam Chand Pathania L4 | Aditya Saklani L6 | ANKIT KUMAR L2 | Naveen Kumar L3 | Rakesh Kumar L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation, trenches etc. in all kinds of soil such as pick work, jumper work, blasting work in soft / hard rock, chiselling in soft / hard including wedging out of a rock where blasting is prohibited and stacking the excavated earth up to all lifts, stacking the excavated soil up to all lead clear from the edge of excavation and then returniing the stacked soil in 15 centimeters layers when required in to plinths, sides of foundation etc. consolidating each deposited layer by ramming and waterng and then disposing of all surplus excavated earth as per direction and to the entire satisfation of Engineer- in- charge up to leads and lifts. | 6.83 | Cum | 360 ₹2,458.8 | 380 ₹2,595.4 | 290 ₹1,980.7 Lowest | 375 ₹2,561.25 | 355 ₹2,424.65 | 350 ₹2,390.5 | 365 ₹2,492.95 | 400 ₹2,732 |
| 2.00 | Providing and laying cement concrete 1:5:10 (1 cement :5 sand : 10 graded stone aggregate 40mm nominal size) with 15% Plum and curing complete excluding cost of form work in retaining walls/breast walls, the size of plums shall usually by 150mm to 300mm as per HPPWD specification as per direction and to the entire satisfaction of Engineer-in-Charge. | 13.13 | Cum | 7,500 ₹98,475 Lowest | 7,830 ₹1,02,807.9 | 8,350 ₹1,09,635.5 | 7,700 ₹1,01,101 | 7,800 ₹1,02,414 | 8,100 ₹1,06,353 | 7,600 ₹99,788 | 7,850 ₹1,03,070.5 |
| 3.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering strutting and propping etc. with wooden batten and ballies, in all heights of propping and centring below supporting floor to ceiling upto all height and removal of the same for insitu-reinforced concrete and plain concrete work in :- | |||||||||||
| 3.01 | Vertical surfaces such as wall (any thickness) partitions and the like including attached pillasters, buttresses plinth and string courses and the like in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge. | 28 | Sqmt. | 350 ₹9,800 | 385 ₹10,780 | 285 ₹7,980 Lowest | 370 ₹10,360 | 350 ₹9,800 | 320 ₹8,960 | 360 ₹10,080 | 405 ₹11,340 |
| 4.00 | Stone soling/Boulder filling dry hand packed under floor/ behind retaining wall as per direction and to the entire satisfaction of Engineer-in-charge. | 4.73 | Cum | 2,500 ₹11,825 | 3,540 ₹16,744.2 | 2,200.1 ₹10,406.47 | 2,800 ₹13,244 | 3,500 ₹16,555 | 1,500 ₹7,095 Lowest | 2,700 ₹12,771 | 3,560 ₹16,838.8 |
Tender Value
₹1.4 L
EMD Value
₹2,860
Closing Date
19 Aug 2026, 5:00 pmClosed
Executive Engineer
JS Division Dharampur Bharari
R.R damages of LWSS Kandapattan to Mandap GP Brang in Tehsil Dharampur Distt. Mandi HP (SH. CO retaining wall for protect storage tank 50 KL at Upper Brang) SDF 2024 717
2026_HPIPH_140916_1
6141-6190 Dated 10-08-2026
Open Tender
Civil Works
Item Rate
90 days
Dharampur
Please refer Tender documents.
7 documents required · 7 mandatory
₹350
Executive Engineer
₹2,860
21 Aug 2026
10 Aug 2026
20 Aug 2026
10 Aug 2026
19 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation, trenches etc. in all kinds of soil such as pick work, jumper work, blasting work in soft / hard rock, chiselling in soft / hard including wedging out of a rock where blasting is prohibited and stacking the excavated earth up to all lifts, stacking the excavated soil up to all lead clear from the edge of excavation and then returniing the stacked soil in 15 centimeters layers when required in to plinths, sides of foundation etc. consolidating each deposited layer by ramming and waterng and then disposing of all surplus excavated earth as per direction and to the entire satisfation of Engineer- in- charge up to leads and lifts. | 6.83 | Cum | 100 | ₹683 |
| 2 | Providing and laying cement concrete 1:5:10 (1 cement :5 sand : 10 graded stone aggregate 40mm nominal size) with 15% Plum and curing complete excluding cost of form work in retaining walls/breast walls, the size of plums shall usually by 150mm to 300mm as per HPPWD specification as per direction and to the entire satisfaction of Engineer-in-Charge. | 13.13 | Cum | 100 | ₹1,313 |
| 3Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering strutting and propping etc. with wooden batten and ballies, in all heights of propping and centring below supporting floor to ceiling upto all height and removal of the same for insitu-reinforced concrete and plain concrete work in :- | |||||
| 3.01 | Vertical surfaces such as wall (any thickness) partitions and the like including attached pillasters, buttresses plinth and string courses and the like in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge. | 28 | Sqmt. | 100 | ₹2,800 |
| 4 | Stone soling/Boulder filling dry hand packed under floor/ behind retaining wall as per direction and to the entire satisfaction of Engineer-in-charge. | 4.73 | Cum | 100 | ₹473 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.54 MB
Form6.pdf
Tender Documents • 0.79 MB
Form8.pdf
Tender Documents • 1.28 MB
TC.pdf
Tender Documents • 0.12 MB
BOQ_209114.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .