| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.7 LAccepted-AOC | ₹28.7 L | L1 | Accepted-AOC Accept |
| 2 | L2₹28.8 LRejected-Finance | ₹28.8 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | G K Guna Bhala Sekar L1 | Rajakrishnan L2 |
|---|---|---|---|---|---|
| 1.00Name of the Work: CONSTRUCTION OF 100000 LITRES CAPACITY OHT (7.50M STAGING) AT SOLIAMMAN NAGAR H/O KATHAPARAI | |||||
| 2.00Earth work excavation below G.L. and depositing on bank within an initial lead of 2.00 m and an initial lift of 1.00 for the following classification of soil | |||||
| 3.00 | First depth of 2m | 69.6 | Cum | 263.58 ₹18,345.17 | 264.28 ₹18,393.89 |
| 4.00 | Second depth of 2m | 7.59 | Cum | 263.58 ₹1,999.52 | 264.28 ₹2,004.83 |
| 5.00 | PCC 1:4:8 using 40mm HBG metal including mixing curing etc., below 1.50 m from GL | 3.48 | Cum | 5,400.24 ₹18,792.84 | 5,400.94 ₹18,795.27 |
| 6.00 | Supplying&filling with clean River sand in layer of 15cm thick, well consolidated including watering etc.complete for foundation | 5.22 | Cum | 1,777.07 ₹9,276.31 | 1,777.77 ₹9,279.96 |
| 7.00RCC 1:1.5:3 (one cement, one and half snd and three 20mm HBG stone)for column fotting excluding the cost of reinforcement and centering and shuttering but including curing finishing, etc.complete | |||||
| 8.00 | 1.50m to 4.50m below GL | 8.05 | Cum | 9,262.69 ₹74,583.18 | 9,263.39 ₹74,588.82 |
| 9.00 | 0m to 1.50m below GL | 5.16 | Cum | 9,123.92 ₹47,115.92 | 9,124.62 ₹47,119.54 |
| 10.00 | Om to 4.50m From GL | 7.4 | Cum | 9,264.99 ₹68,560.93 | 9,265.6 ₹68,565.44 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹29,000
Closing Date
20 Feb 2026, 3:00 pmClosed
BDO(B.Pt), Karur
BDO(B.Pt), Karur
CONSTRUCTION OF 100000 LITRES CAPACITY OHT (7.50M STAGING) AT SOLIAMMAN NAGAR H/O KATHAPARAI
2026_RDTN_657481_1
CONSTRUCTION OF 100000 LITRES CAPACITY OHT (7.50M STAGING) AT SOLIAMMAN NAGAR H/O KATHAPARAI
Open Tender
Civil Works - Others
180 days
Karur Union Office
CONSTRUCTION OF 100000 LITRES CAPACITY OHT (7.50M STAGING) AT SOLIAMMAN NAGAR H/O KATHAPARAI
2 documents required · 2 mandatory
₹0
₹29,000
Yes
9 Mar 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
Name of the Work: CONSTRUCTION OF 100000 LITRES CAPACITY OHT (7.50M STAGING) AT SOLIAMMAN NAGAR H/O KATHAPARAI
Earth work excavation below G.L. and depositing on bank within an initial lead of 2.00 m and an initial lift of 1.00 for the following classification of soil
First depth of 2m
Second depth of 2m
PCC 1:4:8 using 40mm HBG metal including mixing curing etc., below 1.50 m from GL
Supplying&filling with clean River sand in layer of 15cm thick, well consolidated including watering etc.complete for foundation
RCC 1:1.5:3 (one cement, one and half snd and three 20mm HBG stone)for column fotting excluding the cost of reinforcement and centering and shuttering but including curing finishing, etc.complete
1.50m to 4.50m below GL
0m to 1.50m below GL
Om to 4.50m From GL
4.50m to 7.32m From GL
7.32m &10.98m from GL
Centering, soffits of RCC works including strutting and shuttertting Charges etc. complete for the following
Below GL (Plane Surfaces)
Central &outer column footing.circumferential&radial braces&annular portion of GL brace jn. (Plane surface)
Curved surface
Square Column
Column below G.L.
Column 0 to 3.30 m height above G.L
Colum above 3.3m to 4.3 ht from GL
Column above 4.30 m upto 5.30 m
Column above 5.30 m upto 6.30 m
Column above 6.30 m upto 7.30 m
Circular Column
Column below G.L.
Column 0 to 3.30 m height above G.L
Colum above 3.3m to 4.3 ht from GL
Column above 4.30 m upto 5.30 m
Column above 5.30 m upto 6.30 m
Column above 6.30 m upto 7.30 m
Supply, fabrication, placing in position of steel rods cutting tying etc. complete including cost of reinforcement RTS rods.
UP TO 16 MM DIA
Painting two coats to the exposed surface of SR using cement paint
Supplying and fixing of cut stone in CM 1:3 below inlet pipe
Providing RCC inside ladder as per approved design (vide separate sheet)
Supply, delivery and fixing in position of MS ladder outside the tank
Supplying and fixing of manhole cover with frame of size 0.60 m x 0.60 m in RCC 1:1.5:3 and ms angle.
Provision for Litting OHT Inlet and Outlet connection
Supply, delivery and fixing of pipes for OHT connections including All Charges
Supply and cost of 90mm PVC pipe 4 KSC including all cost of materials and transport charges etc. complete
Earth work excavation for in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary etc complete complying with standard
Laying and jointig of P.V.C and G.I pipe into the trench with proper grading and alignment and all labour charges etc,, complete
Refilling the Pipe line trench with excavated earth other than sand complying the Standard specification etc,, complete
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_788595.xls
BOQ • 0.59 MB
Download all tender documents and submit your bid