| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 CrAccepted-AOC | ₹5.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹5.6 Cr+₹25.0 L (4.63%)Rejected-AOC | ₹5.6 Cr+₹25.0 L (4.63%) | L2 | Rejected-AOC L2 |
| 3 | L3₹7.0 Cr+₹1.6 Cr (29.6%)Rejected-AOC | ₹7.0 Cr+₹1.6 Cr (29.6%) | L3 | Rejected-AOC L3 |
Tender Value
₹3.8 Cr
EMD Value
₹4.5 L
Closing Date
15 Jun 2020, 11:00 amClosed
Chief Engineer Project Shivalik
HQ CE (P) Shivalik, IDPL Complex, Virbhadra, Rishikesh-249202
Design and construction of 50 mtr single span Major Pmt Bridge with Steel Superstructure (Through type) on open foundation over Nelong-II at Km 17.00 on Bhaironghati - Nelong road under 1442 BCC/36 BRTF/Project Shivalik in Uttarakhand State
2020_BRO_557284_1
80263/Maj Pmt Br Nelong II/E8
Open Tender
Civil Works - Bridges
Lump-sum
730 days
Km 17.00 on Bhaironghati - Nelong road
As per Tender Documents
11 documents required · 11 mandatory
₹0
₹4.5 L
Yes
28 Jul 2020
1 May 2020
16 Jun 2020
2 May 2020
15 Jun 2020
12 May 2020
3 May 2020 - 11 May 2020
Amount
Design including proof checking and Construction of 50 mtr long single span major permanent bridge with Steel truss type superstructure (Through Type) on Open foundation over Nelong at Km 17.00 on Bhaironghati – Nelong road under Shivalik Project in Uttarakhand State as per NIT drawing and based on hydraulic data, ground data, sub soil data, special conditions and particular specifications of the tender documents. Construction works includes all preparatory work, Erection of staging/shuttering, abutments, piers, return wall, placing of POT & POT cum PTFE bearings, Casting of superstructure/launching of steel superstructure and casting RCC decking, wearing coat having non skid surface in uniform thickness, strip seal expansion joints, RCC crash barriers, footpaths, Kerbs, hand rails, drainage spout, load testing of superstructure of bridge, service arrangement for utility, Site Clearances, painting of all exposed steel works, protective works, temporary river training works and diversion; and all other items of works required and necessary for the complete construction of the bridge including curing but excluding works on approaches and approach slab.
VIJ ENGINEERS AND CONSULTANTS PVT. LTD.
M/s Nandlal Tayal
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .