| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAdmitted-Finance GOVT CONTRACTOR VILLAGE KADHYAR P O TEHSIL JUNGA DISTT SHIMLA 9 | ₹2.1 L | L1 | Admitted-Finance |
| 2 | L2₹2.2 L+₹5,297 (2.52%)Admitted-Finance | ₹2.2 L+₹5,297 (2.52%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Vishal Thakur L1 | Sanskar Thakur L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation in foundation, trenches etc. in all kinds of soil such as pick work jumper work, blasting work in soft/hard rock, chiselling in soft/hard rock including wedging out upto all lift, stacking the excavated soil upto all lead clear from the edge of excavation and then returning the stacked soil in 15cm layers when requaired into plinths, sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth upto all lead and lifts as per direction and to the entire satisfaction of Engineer-in-Charge. | 11.07 | Cum | 650 ₹7,195.5 Lowest | 700 ₹7,749 |
| 2.00 | Providing and laying cement conrete 1 : 3 :6 . ( 1 cement : 3 sand and : 6 grade stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth upto all leads and lifts as per the direction and to the entire satisfaction of Engineer-in-Charge. | 0.96 | cum | 9,700 ₹9,312 Lowest | 9,750 ₹9,360 |
| 3.00Providing and laying cement concrete 1 : 1½ : 3 ( 1 cement : 1½ : sand : 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinfocement for reinforced concrete work in : | |||||
| 3.01 | Foundation footings bases of columns and the like; and mass concreteas per direction and to the entire satisfaction of Engineer-in-Charge. | 1.52 | cum | 13,300 ₹20,216 Lowest | 13,500 ₹20,520 |
| 3.02 | Walls any thickness but not less than 0.1m thickness including attached pillaster buttresses, plinth and string courses from top of foundation upto two level all floor level as per direction and to the entire satisfaction of Engineer-in-Charge. | 3.82 | cum | 13,500 ₹51,570 Lowest | 13,700 ₹52,334 |
| 4.00Providing and laying cement concrete 1:1.5:3 (1 cement: 1.5 sand: 3 graded crushed stone agg. 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in:- | |||||
| 4.01 | Suspended floors roofs, landings and shelves and their supports, balconies, beams, girders, bressumers and cantilevers upto floor two level. as per direction and to the entire satisfaction of Engineer-in-Charge. | 0.6 | cum | 11,700 ₹7,020 Lowest | 11,750 ₹7,050 |
| 5.00 | Providing laying of Tor steel reinforcement for RCC work including bending binding and placing in position including wire upto all floor level as per direction and to the entire satisfaction of Engineer-in-Charge. | 496.6 | Kg | 160 ₹79,456 Lowest | 170 ₹84,422 |
| 6.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering strutting and propping etc. with wooden batten and ballies, in all heights of propping and centring below supporting floor to ceiling not exceeding 4 mtrs and removal of the same for insitu-reinforced concrete and plain concrete work in :- | |||||
| 6.01 | Vertical surfaces such as wall (any thickness) partitions and the like including attached pillasters, buttresses plinth and string courses and the like in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge. | 38.19 | Sqmt | 455 ₹17,376.45 Lowest | 460 ₹17,567.4 |
Tender Value
₹1.8 L
EMD Value
₹3,660
Closing Date
30 Jul 2026, 5:00 pmClosed
Executive Engineer
JS Division Dharampur Bharari
Deposit work. (SDF/2020/1303) Restoration of rain damages to GWSS Hiun Giun Druman in Tehsil Dharampur Distt. Mandi HP (SH. CO storage tank of 10000 Ltr at Ubhak)
2026_HPIPH_139558_1
5446-95 Dated 21-07-2026
Open Tender
Civil Works
Item Rate
90 days
Dharampur
Please refer Tender documents.
7 documents required · 7 mandatory
₹350
Executive Engineer
₹3,660
4 Aug 2026
21 Jul 2026
31 Jul 2026
21 Jul 2026
30 Jul 2026
21 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation, trenches etc. in all kinds of soil such as pick work jumper work, blasting work in soft/hard rock, chiselling in soft/hard rock including wedging out upto all lift, stacking the excavated soil upto all lead clear from the edge of excavation and then returning the stacked soil in 15cm layers when requaired into plinths, sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth upto all lead and lifts as per direction and to the entire satisfaction of Engineer-in-Charge. | 11.07 | Cum | 100 | ₹1,107 |
| 2 | Providing and laying cement conrete 1 : 3 :6 . ( 1 cement : 3 sand and : 6 grade stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth upto all leads and lifts as per the direction and to the entire satisfaction of Engineer-in-Charge. | 0.96 | cum | 100 | ₹96 |
| 3Providing and laying cement concrete 1 : 1½ : 3 ( 1 cement : 1½ : sand : 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinfocement for reinforced concrete work in : | |||||
| 3.01 | Foundation footings bases of columns and the like; and mass concreteas per direction and to the entire satisfaction of Engineer-in-Charge. | 1.52 | cum | 100 | ₹152 |
| 3.02 | Walls any thickness but not less than 0.1m thickness including attached pillaster buttresses, plinth and string courses from top of foundation upto two level all floor level as per direction and to the entire satisfaction of Engineer-in-Charge. | 3.82 | cum | 100 | ₹382 |
| 4Providing and laying cement concrete 1:1.5:3 (1 cement: 1.5 sand: 3 graded crushed stone agg. 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in:- | |||||
| 4.01 | Suspended floors roofs, landings and shelves and their supports, balconies, beams, girders, bressumers and cantilevers upto floor two level. as per direction and to the entire satisfaction of Engineer-in-Charge. | 0.6 | cum | 100 | ₹60 |
| 5 | Providing laying of Tor steel reinforcement for RCC work including bending binding and placing in position including wire upto all floor level as per direction and to the entire satisfaction of Engineer-in-Charge. | 496.6 | Kg | 100 | ₹49,660 |
| 6Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering strutting and propping etc. with wooden batten and ballies, in all heights of propping and centring below supporting floor to ceiling not exceeding 4 mtrs and removal of the same for insitu-reinforced concrete and plain concrete work in :- | |||||
| 6.01 | Vertical surfaces such as wall (any thickness) partitions and the like including attached pillasters, buttresses plinth and string courses and the like in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge. | 38.19 | Sqmt | 100 | ₹3,819 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.57 MB
Form6.pdf
Tender Documents • 0.80 MB
Form8.pdf
Tender Documents • 1.28 MB
BOQ_206884.xls
BOQ • 0.28 MB
TC.pdf
Tender Documents • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .