Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.7 LAccepted-AOC | ₹43.7 L Quoted ₹37.0 L | L1 | Accepted-AOC Allotment issued |
| 2 | L2₹38.7 LRejected-Finance | ₹38.7 L | L2 | Rejected-Finance Higher Bid |
| 3 | L3₹39.3 LRejected-Finance | ₹39.3 L | L3 | Rejected-Finance Higher Bid |
| 4 | L4₹40.5 LRejected-Finance | ₹40.5 L | L4 | Rejected-Finance Higher Bid |
| 5 | L5₹42.4 LRejected-Finance R O KHIMBER HAZRATBAL | SRINAGAR | JAMMU AND KASHMIR | 190001 | ₹42.4 L | L5 | Rejected-Finance Higher Bid |
Tender Value
₹68 L
EMD Value
₹1.4 L
Closing Date
16 Jul 2026, 6:55 pmClosed
Executive Engineer PMGSY Divison Ganderbal
Ganderbal
Permanent Restoration of Road MRL03-T01 Mirpora to Achar via Dugapora, Package No JK13-3004.
2026_KSRRD_148633_1
E-NIT No. 04/EE/PMGSY/Gbl/E-tendering of 2026-27, Dated 09/07/2026
Open Tender
Civil Works - Roads
Percentage
90 days
Ganderbal
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,600
₹1.4 L
27 Aug 2026
10 Jul 2026
17 Jul 2026
10 Jul 2026
16 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CC Drain | - | - | - | - |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres All kinds of soil | 21.66 | CuM | 225.21 | ₹4,878.05 |
| 3 | Laying (First Class Type B) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) including Carriage | 34.9 | CuM | 1,133 | ₹39,541.7 |
| 4 | (CEMENT CONCRETE CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)including all carriages of material involved | 34.91 | CuM | 4,934 | ₹1,72,245.94 |
| 5 | (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)including all carriages of material involved | 258.8 | CuM | 6,151.32 | ₹15,91,961.62 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 1,203.75 | SqM | 251.07 | ₹3,02,225.51 |
| 7 | Backfilling behind abutment,wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Including loading, unloading,haulages, royality,octroi charges, form work etc complete. | 86.67 | CuM | 1,241 | ₹1,07,557.47 |
| 8 | CRASH BARRIER | - | - | - | - |
| 9 | Providing and erecting W metal beam crash barrier comprising 3mm thick corrugated sheet metal beam rail, 70 cm above road/ground level fixed on ISMC series channel vertical posts,150X75X5 mm spaced 2m centre to centre, 1.80 M high, 110 cm below ground level all steel parts and fitments to be galvanised by hot dip process , all fittings to confirm to IS 1367 and IS 1364 metal beam rail to be fixed on vertical posts with spacer channel section 150X75X5 mm, 330 mm long complete as per clause 810 including earthwork in excavation by mechanical means and disposal of same by engineer in charge in all kinds of soil and embedding of vertical channel posts in PCC M15 (1:2:4) block of size 0.45 x 0.45 x 1.1 m and cost of nuts and bolts including loading unloading cost of carriage of all materials to site of work complete job (finished job to be measured) | 759 | RM | 4,643.75 | ₹35,24,606.25 |
| 10 | Total Construction cost without GST | 1 | No. | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.86 MB
BOQ_233354.xls
BOQ • 0.28 MB
Corrigendumnit42026.pdf
PDF • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].