Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.6 CrAccepted-AOC 3 GHA 10 VIGYAN NAGAR KOTA | KOTA | KOTA | RAJASTHAN | ₹1.6 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹2.1 CrRejected-Finance 1 VISHWAS NAGAR PO NFL GONIANA ROAD BATHINDA PUNJAB 151003 | BATHINDA | PUNJAB | 151003 | ₹2.1 Cr | L-2 | Rejected-Finance L-2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
| Sl No | Description | Qty | Unit | Gill Engineering Pvt. Ltd. L2 | UNIVERSAL ENGINEERS L1 |
|---|---|---|---|---|---|
| 1.00PART-A - ROUTINE MAINTENANCE OF MILL | |||||
| 1.01Day to day routine /preventive / breakdown maintenance and Unit up-keeping works round the clock for Stage-I, i.e. Unit 1&2.(Detailed scope of work as per clause No.1.00 to 42.5 of Annexure III). Man Power required | |||||
| 1.01 | Highly Skilled (Supervisior) | 0.5 | Nos. Per Unit Per month | 10,770 ₹1.7 L | 10,770 ₹1.7 L |
| 1.01 | Highly Skilled (Fitter) | 1 | Nos. Per Unit Per month | 10,770 ₹4.0 L | 10,770 ₹3.6 L |
| 1.01 | Skilled (Welder) | 1 | Nos. Per Unit Per month | 9,270 ₹3.4 L | 9,270 ₹3.1 L |
| 1.01 | Semi Skilled | 4 | Nos. Per Unit Per month | 8,910 ₹13.3 L | 8,910 ₹11.8 L |
| 1.01 | Un Skilled | 3 | Nos. Per Unit Per month | 8,550 ₹9.5 L | 8,550 ₹8.5 L |
| 1.02Day to day routine/ preventive/ break down & up-keeping work round the clock for Stage-II i.e. Unit 3 & 4. (Detailed scope of work as per Clause No.1.00 to 42.5 of Annexure III) Man Power required | |||||
| 1.02 | Highly Skilled (Supervisor) | 0.5 | Nos. Per Unit Per month | 10,770 ₹1.7 L | 10,770 ₹1.7 L |
| 1.02 | Highly Skilled (Fitter) | 2 | Nos. Per Unit Per month | 10,770 ₹8.0 L | 10,770 ₹7.1 L |
Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
16 Oct 2025, 12:00 pmClosed
CHIEF ENGINEER KSTPS, KOTA
New Adm. Building, Kota Super Thermal Power Station, Sakatpura, Kota
Routine and Annual Maintenance of Bowl Mills XRP-763/803, Boiler Burner Panel and CMR installed at Stage- I and II, KSTPS, Kota
2025_RRVUN_503112_1
TN-5446
Open Tender
Repair and Maintenance Works
365 days
Kota Super Thermal Power Station
As per QR mentioned in Tender documents
2 documents required · 2 mandatory
₹1,180
digitally as mentioned in tender documents
₹3.2 L
Yes
24 Mar 2026
25 Sept 2025
17 Oct 2025
25 Sept 2025
16 Oct 2025
25 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid