| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-AOC NOOR MANZIL KOTTAMKARA CHANDANATHOPPU P O PERINAD | ₹6.8 L | L1 | Accepted-AOC Lowesst |
| 2 | L2₹6.9 L+₹17,216.89 (2.55%)Rejected-AOC | ₹6.9 L+₹17,216.89 (2.55%) | L2 | Rejected-AOC second Lowest hence rejected |
| 3 | L3₹7.0 L+₹21,521.11 (3.18%)Rejected-AOC | ₹7.0 L+₹21,521.11 (3.18%) | L3 | Rejected-AOC Highest rate hence rejected |
Tender Value
₹7.2 L
EMD Value
₹18,000
Closing Date
26 May 2026, 5:00 pmClosed
Executive Engineer
PMU,Pala
Constructing 1km HT ABC line and installing one 100kVa Transformer
2026_KSEB_849424_1
E-tender/2026-27/6/6.05.2025
Open Tender
Electrical Works
Percentage
Paika
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,770
Yes
₹18,000
Yes
15 Jun 2026
8 May 2026
29 May 2026
8 May 2026
26 May 2026
8 May 2026
8 May 2026 - 26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Drawing 1km HT ABC and 100KVA insertion near Aayillamkunnu_ES PAIKA | |||||
| 1.01 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). | 32 | No | 3,274.36 | ₹1,04,779.52 |
| 1.02 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site(transportation by any vehicle ) | 40 | No | 762.14 | ₹30,485.6 |
| 1.03 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. | 22 | No | 1,923.64 | ₹42,320.08 |
| 1.04 | Dismantling (without damage) LT stay including digging pit in all classes of soil and backfilling. | 30 | No | 469.41 | ₹14,082.3 |
| 1.05 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. | 1.2 | Km | 14,129.32 | ₹16,955.18 |
| 1.06 | Dismantling (without damage) one km LT additional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly. | 1.2 | Km | 3,351.73 | ₹4,022.08 |
| 1.07 | Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and ACSR Weasel for Neutral & Street Main, for one km LT 3ph 5 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. | 1.2 | Km | 38,753.95 | ₹46,504.74 |
| 1.08 | Disconnecting and lowering down the single phase Wpservice connection with gy wire from the OH line and reconnecting the same after completing the line work | 40 | No | 96.18 | ₹3,847.2 |
| 1.09 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 22 | No | 478.82 | ₹10,534.04 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1435345.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
GCC.pdf
Tender Documents • 0.33 MB
Specialconditions.pdf
Other Document • 0.30 MB
BOQ_1435345.xls
BOQ • 0.42 MB
IB.pdf
Other Document • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .