Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.4 LAccepted-AOC ERDA ROAD GIDC MAKARPURA INDUSTRIAL AREA THANE BELAPUR ROAD VADODARA VADODARA GUJARAT 390010 | VADODARA | GUJARAT | 390010 | L1 | Accepted-AOC Letter of award has been awarded to the lowest quoted
bidder M/s Electrical Research and development association (ERDA) | |
| 2 | Rejected-Technical 28 SECOND FLOOR OKHLA INDUSTRIAL ESTATE PHASE 3 NEW DELHI DELHI 110020 | SOUTH EAST DELHI | DELHI | 110020 | - | Rejected-Technical Bidder is technically Non-responsive |
| Sl No | Description | Qty | Unit | Electrical Research And Development Association L1 |
|---|---|---|---|---|
| 1.00First Year 132/33KV, 30MVA, 3 Phase Aux Transformer | ||||
| 1.01 | (1.1) Tan Delta Test (Bushing and Winding)
(1.2) Dynamic Resistance Measurement (DRM) of OLCT
(1.3) Winding Resistance Measurement (HV & LV)
(1.4) 3 Phase Voltage ratio Test
(1.5) Short-circuit impedance Test | 4 | Job | 70,000 ₹2,80,000 Lowest |
| 2.00First Year 132/25KV, 21.6MVA, 1 Phase Traction Transformer | ||||
| 2.01 | (2.1) Tan Delta Test (Bushing and Winding)
(2.2) Dynamic Resistance Measurement (DRM) of OLCT
(2.3) Winding Resistance Measurement (HV & LV)
(2.4) Voltage ratio Test
(2.5) Short-circuit impedance Test | 4 | Job | 70,000 ₹2,80,000 Lowest |
| 3.00First Year 120 kv, 42 kv & 30 kv Lightning Arresters | ||||
| 3.10 | 3rd Harmonics Resistance Measurement Test for 120 kv LA | 20 | Job | 3,000 ₹60,000 Lowest |
| 3.20 | 3rd Harmonics Resistance Measurement Test for 42 kv LA | 7 | Job | 3,000 ₹21,000 Lowest |
| 3.30 | 3rd Harmonics Resistance Measurement Test for 30 kv LA | 12 | Job | 3,000 ₹36,000 Lowest |
| 4.00First Year Aux Transformer and Traction Transformer oil sample testing | ||||
| 4.10 | DGA test of Transformer Oil (Main Tank and OLTC) | 8 | Job | 2,190 ₹17,520 Lowest |
Tender Value
₹29.3 L
EMD Value
₹58,697
Closing Date
19 Dec 2025, 3:00 pmClosed
GM(TRACTION AND EANDM)
Office of Manager (Traction/EANDM), JMRC, Room no. 107, First Floor, Admin. Building, Mansarovar Metro Train Depot, Bhrigu path, Mansarovar, Jaipur-302020
Testing and health assessment work of Power Transformers and Lightning Arresters installed at both mansarovar and sindhi camp RSS of JMRC for three years
2025_JMRC_516784_1
JMRC/OS/EL/2025-26/NIB/022
Open Tender
Miscellaneous Services
Item Rate
1095 days
MANSAROVAR
As per bid document.
3 documents required · 3 mandatory
₹1,180
Jaipur Metro Rail Corporation Ltd
₹58,697
12 Mar 2026
3 Dec 2025
19 Dec 2025
3 Dec 2025
19 Dec 2025
3 Dec 2025
First Year 132/33KV, 30MVA, 3 Phase Aux Transformer
(1.1) Tan Delta Test (Bushing and Winding) (1.2) Dynamic Resistance Measurement (DRM) of OLCT (1.3) Winding Resistance Measurement (HV & LV) (1.4) 3 Phase Voltage ratio Test (1.5) Short-circuit impedance Test
First Year 132/25KV, 21.6MVA, 1 Phase Traction Transformer
(2.1) Tan Delta Test (Bushing and Winding) (2.2) Dynamic Resistance Measurement (DRM) of OLCT (2.3) Winding Resistance Measurement (HV & LV) (2.4) Voltage ratio Test (2.5) Short-circuit impedance Test
First Year 120 kv, 42 kv & 30 kv Lightning Arresters
3rd Harmonics Resistance Measurement Test for 120 kv LA
3rd Harmonics Resistance Measurement Test for 42 kv LA
3rd Harmonics Resistance Measurement Test for 30 kv LA
First Year Aux Transformer and Traction Transformer oil sample testing
DGA test of Transformer Oil (Main Tank and OLTC)
Water Content of Transformer Oil (Main Tank and OLTC)
Second Year 132/33KV, 30MVA, 3 Phase Aux Transformer
(5.1) Tan Delta Test (Bushing and Winding) (5.2) Dynamic Resistance Measurement (DRM) of OLCT (5.3) Winding Resistance Measurement (HV & LV) (5.4) 3 Phase Voltage ratio Test (5.5) Short-circuit impedance Test
Second Year 132/25KV, 21.6MVA, 1 Phase Traction Transformer
(6.1) Tan Delta Test (Bushing and Winding) (6.2) Dynamic Resistance Measurement (DRM) of OLCT (6.3) Winding Resistance Measurement (HV & LV) (6.4) Voltage ratio Test (6.5) Short-circuit impedance Test
Second Year 120 kv, 42 kv & 30 kv Lightning Arresters
3rd Harmonics Resistance Measurement Test for 120 kv LA
3rd Harmonics Resistance Measurement Test for 42 kv LA
3rd Harmonics Resistance Measurement Test for 30 kv LA
Second Year Aux Transformer and Traction Transformer oil sample testing
DGA test of Transformer Oil (Main Tank and OLTC)
Water Content of Transformer Oil (Main Tank and OLTC)
Third Year 132/33KV, 30MVA, 3 Phase Aux Transformer
(9.1) Tan Delta Test (Bushing and Winding) (9.2) Dynamic Resistance Measurement (DRM) of OLCT (9.3) Winding Resistance Measurement (HV & LV) (9.4) 3 Phase Voltage ratio Test (9.5) Short-circuit impedance Test
Third Year 132/25KV, 21.6MVA, 1 Phase Traction Transformer
(10.1) Tan Delta Test (Bushing and Winding) (10.2) Dynamic Resistance Measurement (DRM) of OLCT (10.3) Winding Resistance Measurement (HV & LV) (10.4) Voltage ratio Test (10.5) Short-circuit impedance Test
Third Year 120 kv, 42 kv & 30 kv Lightning Arresters
3rd Harmonics Resistance Measurement Test for 120 kv LA
3rd Harmonics Resistance Measurement Test for 42 kv LA
3rd Harmonics Resistance Measurement Test for 30 kv LA
Third Year Aux Transformer and Traction Transformer oil sample testing
DGA test of Transformer Oil (Main Tank and OLTC)
Water Content of Transformer Oil (Main Tank and OLTC)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
Tendernotice_2.pdf
PDF • 22.35 MB
bidtestingandhealthassessment.pdf
Tender Documents • 22.33 MB
BOQ_922281.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .