| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.8 LAccepted-AOC | ₹34.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹48.0 L+₹13.2 L (38.1%)Rejected-AOC | ₹48.0 L+₹13.2 L (38.1%) | L2 | Rejected-AOC L2 |
| 3 | L3₹53.9 L+₹19.1 L (55.0%)Rejected-AOC KERALA INDIA 682030 | ERNAKULAM | KERALA | 682030 | ₹53.9 L+₹19.1 L (55.0%) | L3 | Rejected-AOC L3 |
| 4 | L4₹55.9 L+₹21.1 L (60.6%)Rejected-AOC | ₹55.9 L+₹21.1 L (60.6%) | L4 | Rejected-AOC L4 |
Tender Value
₹49.1 L
EMD Value
₹50,000
Closing Date
16 Jan 2024, 5:00 pmClosed
CEO Technopark
Park Centre building, Technopark Phase 1 Campus
Providing fencing with RCC post and barbed wire
2023_ETPK_635248_1
ETPK/TC/194/2023-24
Open Tender
Civil Works - Others
Item Rate
60 days
Technopark Phase 4 campus (Technocity)
As mentioned in Bid1 document
2 documents required · 2 mandatory
₹2,950
₹50,000
Park Centre building, Technopark Phase 1 Campus
7 Feb 2024
22 Dec 2023
17 Jan 2024
22 Dec 2023
16 Jan 2024
29 Dec 2023
29 Dec 2023
Amount
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 1Km outside the periphery of the area cleared The rate inclusive of all material charge, Labour, transportation, Scaffolding (If needed) loading/Unloading at the work space and removal of debris outside Technopark campus etc.for all floors and all heights,complete as per the direction of engineer in charge.
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 1Km and lift upto 1.5 m, as directed by Engineer-in-charge. 2.6.1 All kinds of soil.The rate inclusive of all material charge, Labour, transportation, Scaffolding (If needed) loading/Unloading at the work space and removal of debris outside Technopark campus etc.for all floors and all heights,complete as per the direction of engineer in charge.
Filling available excavated earth (excluding rock) in trenches, plinth, sides & inside of foundations etc. (after confermed by the engineer in charge) in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to1 Km and lift upto 1.5 m. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc. complete as per the direction of engineer in charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campusetc. complete as per the direction of engineer in charge.
Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, bases for columns, pile cap and grade beam etc. complete. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc. complete as per the direction of engineer in charge.
Supplying at site: R.C.C. Standards post / struts / rails / pales of mix 1:1.5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 12.5 mm nominal size ) with wooden plugs or 6 mm bar nibs wherever required as per direction of Engineer-in-Charge (cost of earth works in excavation, concrete works in foundation to be paid separately).The rate inclusive of all material charge, Labour, transportation, Scaffolding (If needed) loading/Unloading at the work space and removal of debris outside Technopark campus etc.for all floors and all heights,complete as per the direction of engineer in charge.
Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I staples on wooden plugs or G.I binding wire tied to 6 mm bar nibs fixed while casting the post, including two coats of metal primer and two coats of enamel paint.(cost of R.C.C. posts, struts, earth work and concrete to be paid for separately):- Payment to be made per metre cost of total length of barbed wire used . With G.I barbed wire.The rate inclusive of all material charge, Labour, transportation, Scaffolding (If needed) loading/Unloading at the work space and removal of debris outside Technopark campus etc.for all floors and all heights,complete as per the direction of engineer in charge.
Applying priming coat:With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron /steel works.The rate inclusive of all material charge, Labour, transportation, Scaffolding (If needed) loading/Unloading at the work space and removal of debris outside Technopark campus etc.for all floors and all heights,complete as per the direction of engineer in charge.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new work.The rate inclusive of all material charge, Labour, transportation, Scaffolding (If needed) loading/Unloading at the work space and removal of debris outside Technopark campus etc.for all floors and all heights,complete as per the direction of engineer in charge.
Welded steel wire fabric of required width having rectangular mesh painted with two or more coats of enamel paint of approved shade over a coat of primer (Priming & painting to be paid for separately).Welded steel wire fabrics will conform to IS4948 and shall be of rectangular mesh of 75 x 25 mm size with weight not less than 7.75 kg/sqm. The rate inclusive of all material charge, Labour, transportation, Scaffolding (If needed) loading/Unloading at the work space and removal of debris outside Technopark campus etc.for all floors and all heights,complete as per the direction of engineer in charge.
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel including two coats of enamel paint.etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.The rate inclusive of all material charge, Labour, transportation, Scaffolding (If needed) loading/Unloading at the work space and removal of debris outside Technopark campus etc.for all floors and all heights,complete as per the direction of engineer in charge.
SH INFRANET MANAGEMENT SOLUTIONS LLP
R. Sajikumar
ANILCO ENGINEERS PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_964365.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .