Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.0 CrAccepted-AOC 1ST FLOOR JIDI NAIR BIJU T NAIR DILEEP KB POSIDON HOUSE THIRUVANIYOOR VILLAGE KUNNATHUNAD CHEMMANAD VARIKKOLI P O PUTHENCRUZ ERNAKULAM KERALA 682308 PUTHENCRUZ ERNAKULAM KERALA 682308 | ERNAKULAM | KERALA | 682308 | ₹1.0 Cr | 1 | Accepted-AOC Work awarded |
| 2 | 2₹1.1 Cr+₹6.7 L (6.66%)Rejected-AOC | ₹1.1 Cr+₹6.7 L (6.66%) | 2 | Rejected-AOC Second lowest |
Tender Value
₹1.1 Cr
EMD Value
₹50,000
Closing Date
12 Apr 2023, 5:00 pmClosed
Construction Engineer, Alappuzha
Sabari Gardens Chandanakavu, Alappuzha-688011
Deepening and Side protection works
2023_KLDC_570213_1
KLDC/ALP/CE/2022-23/05(1-4)(1)
Open Tender
Civil Works - Others
Item Rate
540 days
Thannermukam Grama panchayath in Alappuzha Distric
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,900
Yes
₹50,000
Yes
18 May 2023
31 Mar 2023
18 Apr 2023
31 Mar 2023
12 Apr 2023
31 Mar 2023
Amount
App A: Deepening and Side Protection Works
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.33.1 : Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
4A CONSTRUCTION
Bidder Name
4A CONSTRUCTION
POSIDON INFRATEL SOLUTIONS PVT LTD
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
finance_841721.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .