Loading…
Loading…
Tender ID
Tender Value
₹7.5 L
EMD Value
₹14,973
Closing Date
11 Feb 2026, 5:30 pmClosed
EEVI, WRD, Bicholim
EEVI, WRD, Bicholim
Construction of irrigation well in the land bearing Survey No. 58/1 situated at Mencurem village of Bicholim Taluka.
2026_WRD_27531_1
No.WRD/WDVI/PB/F.30/TN e 43/2025-26/ 903 line 6 Dated 29/01/2026
Open Tender
Civil Works - Water Works
Item Rate
60 days
Bicholim
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹14,973
27 Feb 2026
30 Jan 2026
12 Feb 2026
30 Jan 2026
11 Feb 2026
30 Jan 2026
Earthwork in excavation in all types of strata comprising any of the materials such as soil, silt, sand, clay gravel, mooram of all varieties shingles, pebbles all type of coglomerates, laterite rocks, soft rock, disintegrated rock, fissured/shuttered decomposed rock or weathered rock and all such other materials as described under appendix to these specification either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiselling, wedging etc. in all conditions such as dry moist, saturated submerged, foul conditions etc. including providing barricading danger lighting gaurding as directed by the Engineer in charge with 50 mts lead and all lifts etc as per specified and directed etc complete
Reinforced cement concrete work in well steining excluding the cost of centering, shuttering, finishing and reinforcement with 1:1½ :3 (1 cement: 1½ coarse sand: 3 graded granitic or basaltic aggreate 20mm nominal size
Centering and shuttering including struttings, propping etc. and removal of form work for: xii) well steining.
Providing High yield strength steel reinforcement bar (HYSD)/TMT steel reinforcement bar from secondary producers (Confirming to IS 1786 of 1986) for RCC work including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member.
Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge.
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.27 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
Tendernotice_2.pdf
PDF • 0.93 MB
BOQ_27977.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .