Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
20 Jul 2026, 6:00 pm
Executive Engineer,Public Health Works Division Surendranagar
Name of Work: Preventive Maintanance& Security of Jalbhavan Office Building, for 24 month At. SurendranagarJalbhavan. Dist.-Surendranagar.
319205
TENDER NOTICE NO. 02 OF 2026-27
Open
Civil Works - Water Works
Surendranagar
6 documents required · 6 mandatory
₹3,600
EXECUTIVE ENGINEER PUBLIC HEALTH WORKS DIVISION GWSSB SURENDRANAGAR
₹1.1 L
30 Jun 2026
30 Jun 2026
30 Jun 2026
20 Jul 2026
30 Jun 2026
Name of Work: Preventive Maintanance & Security of Jalbhavan Office Building, for 24 month At.
Surendranagar Jalbhavan. Dist.-Surendranagar.
Estimated Cost :Rs.
Gujarat Water Supply & Sewerage Board
THIS PAGE IS LEFT INTENTIONALLY BLANK
SR. NO. PARTICULARS
THIS PAGE IS LEFT INTENTIONALLY BLANK.
Schedule showing approximate quantity of materials to be supplied to the contractor at the govt. store for
the work to be executed on contract and the rate which they are to be charged.
Sr. Particular Quantity Issue Rate Unit Place of Delivery
1. Materials not included in “Schedule – A” but required for the work shall be provided by the contractor
at his own cost.
2. Any materials required for items other than labour charges items mentioned in “Schedule – B” and
materials not included in “Schedule – A” but available with dept. will be issued on request of the
contractor at departmental issued rate or market rate whichever is more.
3. The contractor shall provide his own arrangement for loading, unloading and transporting the
materials issued by the dept. from store to site at his own cost. Contractor will be responsible for
damages whatsoever during transfer.
4. The unused materials issued by the department for this work shall be returned to the department in
good and acceptable condition by the contractors. Any such unused materials not returned by the
contractor in time or issued will be recovered at Double of (As per issue rate + 3% storage charge or
Board RC + 3% storage charges) whichever is more.
5. All materials such as Specials, Fittings, Spares, etc. shall be brought by Agency / Contractor at site
6. The material which requires to be procured by contractor and same as available with the department
the same can be issued to the contractor after prior approval from the competent authority and
charged for the same will be at the current market rate or issue rate fixed by the department
whichever is higher. The contractor shall have to deposit total cost of materials issued or shall be
recovered from the running account bill.
7. The materials issued for the above work shall be used in the above O&M work only. If any of
materials issued for this work and found used in other works shall be charged at the double rate.
8. As per the instructions of the competent authority and availability of materials, if needed contractor
have to transport the same from the other store to ………Scheme for which no extra carting, loading,
unloading will be paid.
9. The materials issued free of cost to the contractor is to be transported to the site of work in good
condition by the contractor for which no extra payment will be made.
10. The materials to be brought/purchase by the contractor shall be got approval from the EIC before
using in the work.
Signature of the contractor Executive Engineer
PH Works Division
At. Surendranagar Jalbhavan. Dist.-Surendranagar.
Name of Work: Preventive Maintanance & Security of Jalbhavan Office Building, for 24 month At.
Surendranagar Jalbhavan. Dist.-Surendranagar.
Amount up to 2 decimals
Part Description
Necessary Supply of Man Power,Cleaner, Sweeper etc.,Gardener
& Security Staff,as per Govt.Labour act. And Necessary Materials
(Acid, Floor Cleaner, Jadu etc. as necessary) & Repairing and
Maintanence with all required necessary Plumbing Work,Electrical
Work and Civil Work like all type of pipes, Valves, Fittings, Water
Tanks, All types of Taps, Showers, Fan, Air Conditioner, Electric
A Water Heater, Tubelight, Lamp, LED light, Helozen light, All type
of Wiring, All type of Switch Board, Plug, Main Switch Board,
Pumping Machinery, Starter, Main Power Supply System, Colour
Work, Repairing of all type of Door Window, with required fitting,
Micellieneus all type of civil repairing works, Campus road,
Compund Wall, Security Cabin, Pump Room, Sump, etc.
including all material and Labour completed with all respect. as
per Engineer Incharge.
Maintenance activities, measured and paid separately, such as
painting, cleaning of reservoirs/ tanks,Tree Triming etc complete
as per this tender document.
Repair, up gradation of non-functional assets
Total Amount (A+B+C)
Total Amount (A+B+C)
Total of Schedule B in Rupees One Crore Six Lakh Ninety Seven Thousands Three Hundred Sixty
Ruppes Fourty Sixty Paisa Only
I / We am / are willing to carry out the work at_________ % above / Below percent (should be
written in figure and words) of the estimated rates mentioned above amount of my / our tender
works out as under.
Estimated amount Put to tender: Rs. Estimated amount Put to tender: Rs.
Deduct ______ % above Rs. ____________ Add ______ % above Rs.
In words Rupees __________________________ In words Rupees __________________________
Rates to be quoted exclusive of GST.
Part A is payable on monthly basis whereas part B & C are subject to completion of activities and
approval of the measurement.
Water supply of target quantity of water to all villages on a daily basis. If due to breakdown,
agency is not capable of supplying water then such quantity should be supplied the next day to
cope up with the shortage. Such that the water supplied on the next day will be 2 times the
regular per day target.
Contractor should quote rate in words & figure both.
Insurance Policy should be procured in favour of Executive Engineer, PH Works Division,
Surendranagar, and contractor has to produce it before entering into agreement with department,
for the full period of O&M.
The bidders should strictly note that rate will be fixed and firm. No escalation will be given during
the maintenance period.
The RWSS All Pipeline Section All Old Leakage Repairing Work Must be Carried Out by the
The work should be carried out as per the terms and conditions laid down in the tender
The cost of raw water, electricity will be borne by GWSSB. Further, GWSSB will supply
necessary stock of Chlorine gas at the location of chlorination plant. All other required material for
O&M work shall be brought by the contractor at his own cost including loading, unloading and
carting and the same material shall get approval from the Engineer-in-charge before use in the
The cost is including all type of taxes (other than GST),octroi, freight, loading, unloading, carting
labour charges payment to labour including insurance, P.F. and all other liabilities for the staff
engaged for the O&M work.
All replaced material (provided from the department’s store) shall be returned to department store
by the contractor at his own cost.
Painting of overall structures Internal/external painting of civil structures, machineries, manifolds,
Interior Paint: Distemper paint to all civil assets
Exterior paint: shall be acrylic emulsion paint colour (like APEX): pump house, treatment plants,
treated water pumping stations, GSRs, ESRs, sump, stores, etc all.
Enamel paint colour: All type of doors, windows, ventilation, shutter, pump, motor, all valves &
equipment inside pump house, transformer yard, D.P. structure, transformer etc
Black Japan colour: air valve, sluice valve, riser pipe of air valve, zero velocity valve, butterfly
valve (outdoor), bypass arrangement etc.
Signature of the contractor Executive Engineer
PH Works Division
Details as Per attachment Annexure for
SCHEDULE B -1A Breakup - O & M WORK for Jalbhavan
Office Building, Surendranagar
Num Total Amount
Num Total Amount
o Unit Item Description Rate per
char Decimals )
Necessary Supply of Man Power,Cleaner,
Sweeper etc.,Gardener & Security Staff,as
per Govt.Labour act. And Necessary
Materials (Acid, Floor Cleaner, Jadu etc. as
necessary) & Repairing and Maintanence
with all required necessary Plumbing
Work,Electrical Work and Civil Work like all
type of pipes, Valves, Fittings, Water Tanks,
1 24.00 Month All types of Taps, Showers, Fan, Air 342857.00 Month
Conditioner, Electric Water Heater, Tubelight,
Lamp, LED light, Helozen light, All type of
Wiring, All type of Switch Board, Plug, Main
Switch Board, Pumping Machinery, Starter,
Main Power Supply System, Colour Work,
Repairing of all type of Door Window, with
required fitting, Micellieneus all type of civil
repairing works, Campus road, Compund
Wall, Security Cabin, Pump Room, Sump,
etc. including all material and Labour
completed with all respect. as per Engineer
Material Section
Repairing and Maintanence with all required
necessary Plumbing Work, Electrical Work
and Civil Work like all type of pipes, Valves,
Fittings, Water Tanks, All types of Taps,
Showers, Fan, Air Conditioner, Electric
Water Heater, Tubelight, Lamp, LED light,
Helozen light, All type of Wiring, All type of
2 24.00 Month Switch Board, Plug, Main Switch Board, 11134.00 Month
Pumping Machinery, Starter, Main Power
Supply System, Colour Work, Repairing of all
type of Door Window, with required fitting,
Micellieneus all type of civil repairing works,
Campus road, Compund Wall, Security
Cabin, Pump Room, Sump, etc. including all
material and Labour completed with all
respect. as per Engineer Incharge. with
necessary material etc... complete
Part B- Maintenance (separately
payable on actuals, as measured)
Wall painting (Two coats) Inside-Outside
Painting to all Functional civil structures,with
plastic emulsion paint of approved brand and
manufacture on undecorated wall surface to
3 5495.02 Sq.m give an even shade including throughly 78.12 Sq.m
brushing the surface free from mortar
droppings and other foreign matter and sand
papered smooth. (Excluding Inside of storage
reservoir/ tanks (ESR, GSR) as per
For old surface – Two coats ( Surface area
Painting one coat on previously painted steel
and other Metal surface with enamel paint
brushing to give and even shade including
cleaning the surface, all dirt, dust & Other
foreign matter.Enamel paint colour: All type
of doors, windows, ventilation, shutter, pump,
motor, all valves & equipment inside pump
house, transformer yard, D.P. structure,
transformer et Extra over above for every
subsequent coat of paint.
Labour charges for cleaning of sump / GL
cistern including cleaning and removing
algae, calcinations, sludge, dirt deposition
from bottorn and as well as from wail of
container, disinfection by bleachina powder
with all necessary tools and plants, labours
and cost of disinfectant ete complete
0.5 Lac.Lit.Cap.Sump(every 6 month)
Labour charges for cleaning of Soak pit
including cleaning and removing algae,
calcinations, sludge, dirt deposition from
bottorn and as well as from wail of container,
6 2.00 No. disinfection by powder with all necessary 1500.00 No
tools and plants, labours and cost of
disinfectant also Damping of Sluge in yard
Soak pit Cleaning
Trimming, pruning, and shaping of
trees/shrubs to maintain a neat appearance
as directed, including disposal of all cut
branches and waste material outside the
premises. Tree Pruning AS per Instructions
7 3750.00 Piece Given by Inchage Site Engineer. 6.40 Piece
In Campus 75 Trees and Per Tress
= 75*35 =3750 Pieces
Exi.Tree Pruning Work.
Part C : Upgradation or Repair of
non-functional legacy assets
Supplying, erecting, testing,
8 3.00 No. commissioning approved make M.S. 140214.00 No.
Polygonal High Mast Pole having
following general Specification.
(a) Polygonal Section fabricated from
M.S.Plate confirms BSEN 10025 & Hot
deepgalvanized minimum 65/86 micron (as
per IS2629 /1985) Lantern carriagewith ring
andrubber lines for erection of luminaries of
(b) Maximum telescopic section not more
(c) Double drum gear pipe motorized winch
with 6mm dia S.S. Rod For 16 mtr and above
(d) Approved make L.E.D. aviation light =
No.Lightening arrestor = 1 No. with
necessarywir ing of 2.5 sq.mm 5 core ISI
copper cable Unarmoured.
(e)Bottom most section suitable for
mountingreversible motor and switchgears
having doornot more than 1400mm x 300mm
withwaterproof gasket & hinges & locking
(f) Pole structure comprises suitable size of
reversible motor, cable and necessary switch
gears with control panel.
(g) bottom section shall have suitable size of
thickness supports ribs foundation bolts nuts
(h) Item not comprises the cost of lanterns.
(i) Necessary Cement Concrete foundation
asper IS including testing & commissioning of
theentire structure for following size of High
[1] High Mast 12 Mtr. TOP A/F 105 mm,
BOTTOM A/F 360mm, No. of Sec. No.-1,
Bottom Thickness-3 mm, Size of Base
Plate-Dia 520 mm x 20 mm thick,
Foundation Bolt Size M24 x 850 mm, Qty-3
Nos, Suitable for mounting Fitting of
Supplying and erecting LED Solar street
lights with High power White LEDs wattage of
1Watt and above assembled on single
MCPCB, efficiency more than 130 lm/w and
corrosion free High pressure die cast
aluminum housing with smooth finish powder
9 coated and heat sink extruded aluminium
8.00 No. with diffuser and Polycarbonate optics/ 17899.00 No.
lenses with company mark/name engraved or
embossed with 36 hours battery backup &
MPPT 24V,7.5 A charge controller with
hours automatic switch on/off with wind
speed resistance 44 m/s as per IEC
(B) 15W, IP-65, PV Module – 80W and
mtr poles complete erected
Supplying & erecting XLPE(IS:7098)(I)-88 ISI
unarmoured copper cable 1.1 KV grade to be
erected as directed of following size.
(k) For 4 core x 4.0 mm2 (For LED Street
Dismentaling tiled of stone floors laid in
11 571.00 Sq.m mortar including stacking of serviceable 46.31 Sq.m
materilas and disposal of unserviceable
materials with all lead and lift.
Demolition including stacking of serviceable
materilas and disposal of unserviceable
materials with all lead and lift. (i) R.C.C. work
Providing and laying Vitrified tiles 8 to 10 mm
thick , 36'' x 36'' in flooring treads of steps
13 586.50 Sq.m and landing laid on a bed of 12mm thick 1469.91 Sq.m
cement mortar 1:3 (1-cement : 3-coarse
sand) finishing with flush pointing in white
Providing formwork of ordinary timber
planking so as to give a rough finish including
centering shuttering strutting and propping
etc. height of propping and centering below
supporting floor to ceiling not exceeding 4 M.
and removal of the same for in situ reinforced
concrete and plain concrete work in. (G)
Columns PillarsPosts and struts. (1) Square
Rectangular Polygonal in plan.
Providing TMT Bar FE 415 reinforcement for
15 24.947 Kg R.C.C. work including bending, binding and 66.59 Kg
placing in position complete upto floor two
Providing and laying controlled cement
concrete M.250 and curing complete
16 1.013 Cum excluding the cost of formwork and 4528.77 Cum
reinforcement for reinforced concrete work in
(D) Columns, Pillars posts and struts, upto
floor two level.
Providing and fixing pre-cast Rubber Dye /
steel Dye inter locking concrete block 60mm
thick with grade of concrete M300 pnumatic
compressed / vibrated mechanically and as
per approved design Confirming to IS 15658 :
2006 including 35 mm Sand layer for levelling
and filling the joint with sand in proper line
and level as per guidlines of IRC : SP 63-
2018 etc. Complete.
Providing and fixing pre-cast concrete kerb
stone of gray cement based concrete block
30cm length,30cm height and 15cm thick of
M200 grade concret as per approved design
and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3
(1cement:3fine sand) etc complete.
Providing, Supplying and Fixing of CC TV
Camera System With 1/2.8" mega fixel
20 1.00 No. CMOS, Full colour Star light, Cemera box, 46015.00 No.
Cable, DVR 16 Channel, HDD 2 TB
Survelience, SMPS for 8 Cemera Set,
Connector, Rack, and installation with mobile
Display inc. all labour charges and pipe fitting
etc. complete. with 24 month Maintence and
Grand Total Rs.
Grand Total Rs.
Executive Engineer Dy.Exe. Enginemer
P.H.Works Division P.H.S.Sub Dn-2
Surendranagar Surendranagar
Part C: Detailed BOQ
Brief note on operational issues : Brief Note For Part C Item Attched H/W for Jalbhavan Office
Abstract of BOQ for Part C
Detailed estimates attached as Annexure
Total Estimated Cost of Part C:
Total time limit for completion of Part C scope of work: 24 (months) (shall not be more than 24 months
from start date of contract.)
Signature of the contractor Executive Engineer
PH Works Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
G R.pdf
Final specification.pdf
Price Bid (Jalbhavan 24 Month).pdf
Insurance.pdf
ALL GR GWSSB.pdf
Technical Bid 30-06-2026.pdf