Tender ID
Tender Value
₹3.9 Cr
EMD Value
₹2.5 L
Closing Date
15 Apr 2026, 4:00 pmClosed
Additional Chief Engineer (P&C)
Supply, Erection, Testing & Commissioning of 66kV S/C line on D/C panther tower from 66kV Kidiyanagar substation to M/s Executive Engineer Water resource investigation division, for unit PS-1 for catering 9350 KVA new power demand at 66KV voltage class Package-1: from 66kV Kidiyanagar Gantry to AP-31/0 having line length 9.24Rkm (OH-09.09Rkm + UG-0.15Rkm) (630Sqmm (3+1)) under Anjar Circle. (Only OH Portion)
288353
ACE(P&C)/Contract/E-437/TL/66kV/S&E
Open
Electrical Works
Works
Vadodara
36 documents required · 26 mandatory · 10 optional
₹8,850
Gujarat Energy Transmission Corporation Limited
₹2.5 L
24 Mar 2026
24 Mar 2026
24 Mar 2026
15 Apr 2026
24 Mar 2026
Sr. No. Description Unit Earth wire Conductor
SEAL AND SIGNATURE
GETCO/E/TS SEL054/66DCP-P&D/W&WOC/ R1 Dt. March-2022
1. Name/Type ** Galvanised ACSR Dog
2. Size mm 7/3.15 6/4.72/Aluminium
3. Configuration ** One continuously **
To run horizontally
On the top of the
Towers & conductors
4. Overall diameter mm 09.45
5. Unit mass Kg/Km. 426
6. Min. UTS KN 58.4
7. Ruling Design Span Meters 280
8. Area of cross-section mm^2 54.55
9. Maximum working Tension at:
i) 32 Deg. C with full wind Kg 1311 1245 kg
ii) 0 Deg. C with 2/3rd full wind 1420 1310 kg
10. Maximum sag under maximum * 5.991 Mtr. at
Temperature and no wind 67 deg. C.
11. Modules of elasticity 1.933x106 8.055x106 Kg
12. Co-efficient of linear 11.5x10^-6 19.1x10^-6/
B. ACSR Panther Conductor and Earth wire for Single Conductor
Sr. No. Description Unit Earth wire Conductor
1. Name/Type ** Galvanised ACSR Panther
2. Size mm 7/3.15 30/3.00Aluminium
3. Configuration ** One continuously **
To run horizontally
On the top of the
Towers & conductors
SEAL AND SIGNATURE
GETCO/E/TS SEL054/66DCP-P&D/W&WOC/ R1 Dt. March-2022
4. Overall diameter mm 09.45
5. Unit mass Kg/Km. 426
6. Min. UTS KN 58.4
7. Ruling Design Span Meters 300
8. Area of cross-section mm^2 54.55
9. Maximum working Tension at:
i) 32 Deg. C with full wind Kg 1410 2763 kg
ii) 0 Deg. C with 2/3rd full wind 1522 3139 kg
10. Maximum sag under maximum * 6.053 Mtr. at
Temperature and no wind 67 deg. C.
11. Modules of elasticity 1.933x106 8.158x106 Kg
12. Co-efficient of linear 11.5x10^-6 17.8x10^-6/
B (I) Details of Insulator (Silicone Rubber Insulator)
1) Size of discs NA
2) Number of discs Single unit Double unit
i) Suspension string 1 string 2x1 string
ii) Tension string 1 string 2x1 string
Type of ACSR Dog Panther
3) Description of string Electro mechanical Length Approx.
strength in KN without Weight in Kg.
a) Single 90 KN 90 KN 870
b) Double 90 KN 90 KN 870
c) Single Tension 90 KN 120 KN 870 15
d) Double Tension 90 KN 120 KN 870 30
B (II) Details of Insulator (Anti-Fog Disc Insulator)
Sr. Details 120KN 90KN
1 Type Ball & Socket Ball & Socket
SEAL AND SIGNATURE
GETCO/E/TS SEL054/66DCP-P&D/W&WOC/ R1 Dt. March-2022
2 Height – mm 145
3 Diameter – mm 280 or 305 255 or
4 Creepage – mm (Min.)
5 Ball Diameter – mm 20
6 Colour Brown Brown
7 Surface Glazed Glazed
Socket Cap Malleable Cast Iron / SGI Hot Dip Galvanised
Ball Pin High Tensile Forged Steel (Hardened & Temp-
ered) Hot Dip Galvanised
Security Clip Phospher Bronze Or Stainless Steel
Zinc Sleeve 99.95% Pure Zinc
Insulator Porcelain
9 Shape of Security Clip R/W
10 Dimensions of Zinc
Exposed Length from
Total Length (Min.)
11 Minimum Failing Load –
12 Minimum Electro
Mechanical Load – Kg. 12500
13 Visible Discharge Test
Voltage – KV (Min.) 9
14 Dry Impulse Flash Over
Voltage – KV (Min. +ve
Peak Wave – 1.2/50
15 - DO – But For –ve
16 Dry Impulse Withstand
Voltage – KV (Min. +ve
Peak Wave – 1.2/50
17 - DO – But For –ve
SEAL AND SIGNATURE
GETCO/E/TS SEL054/66DCP-P&D/W&WOC/ R1 Dt. March-2022
18 Power Frequency Flash
Over Voltage – KV
19 Power Frequency
Withstand Voltage – KV
20 Power Frequency
Puncture Voltage – KV
(RMS – Min.) 140
21 Eccentricity of the disc
(i)Axial run out Max.11.2mm
(ii)Radial run out Max.8.4mm
B (III) Details of Insulator (Plain Disc Insulator) – Not applicable
C Insulator hardware:
(i) Slipping Strength : ACSR conductor Dog/Panther
(a) Suspension Clamps : 8 - 15% of ultimate strength of
(b) Tension Clamps : 95% of ultimate strength of
(i) Minimum Failing Load : ACSR conductor
(ii) Suspension Fittings : 50%of ultimate strength of
(a) Tension Fittings : 100% of U.T.S. of conductor
(a) Suspension Clamps : Forged Steel Hanger free center
type without bolt only
(b) Tension Clamp : compression type
(i) Material : Aluminium/ steel
(ii) Ele. Resis. At 200 C : 75% of measured resistance of
equal length of conductor
(iii) Ferrous Parts : Hot dip galvanized
(iv) No. of A/F disc insulators to be : 05 for Suspension
used 06 for Tension
SEAL AND SIGNATURE
GETCO/E/TS SEL054/66DCP-P&D/W&WOC/ R1 Dt. March-2022
EXECUTION OF WORK
1.1 The erection works covered under this section consist of
a. Check survey with preparation of profile, GETCO will provide the details
of the line alignment as per survey carried out for taking reference to
proceed further for the work of check survey.
b. Delivery of tower material including Bolt-Nuts accessories, Base plate
assembly, earth wire, and hardware accessories, insulators etc. and
transportation to erection site and keeping in safe custody.
c. Insurance of material during storage-cum-erection.
d. Distribution of materials at erection site,
e. Excavation, stub-setting, pile foundation, concreting, back-filling etc.
complete work of foundation including dewatering, shoring & shuttering,
cutting of stubs, fabrication and supply of chimney material and form
f. Tower erection including fixing of attachments, accessories, base plate
assembly and tack-welding including supply and application of primer and
2 coats of zinc rich paints for bottom most two panel (up to 10 Meter)
g. Stringing of ACSR conductor (As per scope) and one ground wire up to
sub-station gantries at both ends with the help of tensioner and puller
machine or manual.
h. Guarantee of all the activities carried out from (a) to (g).
i. Other items not specifically mentioned in this Specification and are
required for the successful erection and commissioning of the
transmission line, unless specifically excluded in the Specification.
1.2 The successful Bidder shall carry out all addition / alteration required for
completion of line and up to commissioning the same at rates quoted in the offer
for respective item. However, no items are to be executed for which prices not
1.3 All works shall be carried out in accordance with the revised and latest
provisions under Indian Electricity Act and Rules made there under.
SEAL AND SIGNATURE
GETCO/E/TS SEL054/66DCP-P&D/W&WOC/ R1 Dt. March-2022
1.4. All the erection tools required during construction of lines shall be arranged by
the Bidder at his own cost. The Bidder shall only be responsible for any damage
to and / or loss of his erection tools.
1.5 Quantities given in the Schedule of erection in price Bid are to be executed by
the Bidder at the rates accepted by the GETCO in the A/T. In case of any
deviation in tower quantity / type of tower / length of line, excavation / concreting
resulting into an increase in which event the field officer shall obtain prior
approval of the Corporate Office and excess quantity shall be paid only at the
accepted rate of the A/T.
1.6 The erection work beyond contractual ceiling amount shall be done only after
approval from the GETCO.
1.7 In case of pile foundation, if the bidder does not have necessary experience,
some other qualified agency may be engaged by the bidder for design and
casting of pile foundation. However, the overall responsibility shall be of the
Bidder and shall be responsible for all the necessary co-ordination with the pile
foundation contractor including stub-setting (As per IS 2911-1980).
2.1. The Bidder has to make check survey and preparation of the profiles as per the
details of route alignment already carried out by GETCO. The complete route
alignment along with the other details as given below will be furnished to the
successful bidders for further execution of the work. If any minor modification in
alignment of the route, during check survey or while scrutiny of check survey is
required, the same shall be carried out by the Bidder at no extra cost to the
a) Survey report
b) Brief Summary of the Project
c) BOQ for type wise Towers with extensions
d) BOQ for tower type wise foundation
e) Details of angle points with latitude and longitude
f) List of the major crossings
g) Details of trial pits along the route
h) Complete route alignment fixed on the toposheet
3.0 ACCESS TO LOCATIONS:
3.1 It will be the Bidders sole responsibility to take the materials up to the location.
Any path way, temporary road, temporary bridge required will have to be
provided by the Bidder at his own cost. If, for any reasons the above is not
feasible, the Bidder at his own cost shall have to arrange transportation by head
SEAL AND SIGNATURE
GETCO/E/TS SEL054/66DCP-P&D/W&WOC/ R1 Dt. March-2022
3.2 The Bidder will be deemed to be very well familiar with the route of the
transmission line before submitting an offer. Notwithstanding the difficulties of
terrain, location approaches, way leave and other obstructions the price quoted
for all the items of erection shall not undergo any change at any stage or
granted by the GETCO for any special rates/consideration.
4.0 EXCAVATION:
4.1 The excavation will be limited to the volumes as per approved excavation
drawings even though the Bidder may excavate more for the sake of his own
convenience or for any reasons. If the excavated dimension/s is/are more than
the dimension/s shown in the approved drawing, the additional excavated
volume should be filled in with 1:3:6 mixture concrete at Bidders cost in respect
of materials, labours etc.
1.2 In case of rock soil, the extra excavated rock portion on all sides shall be filled
with 1:1.5:3 mix concrete at his own cost in respect of materials, labours etc.
4.3 The rates indicated in schedule for excavation work in each soil shall be
applicable to all the locations as per actual condition of the soil strata
irrespective of classification of type of foundation.
4.4 The rates for excavation indicated in schedule shall also be applicable for
benching work, if required.
5.0 SHORING, SHUTTERING AND DEWATERING :
The Bidder has to arrange for shoring, shuttering and dewatering work during
activities of excavation, stub setting and concreting. These shall be done at his
6.0 STUB SETTING:
5.1 The rates for stub setting are inclusive of cutting of stubs (if any), setting of
stubs, leveling at correct level, dismantling of template after concrete, back-
filling work etc.
6.2. Above rates shall be on per MT basis for normal, extensions up to 21 meters
and special/river crossing towers.
6.3. The weights payable for stub-setting item shall comprise of the weight of stub
and its respective stub setting template as per approved bill of material.
7.1. The rates indicated in schedule for concrete work shall be applicable to all the
locations irrespective of soil strata and type of foundation adopted. The Bidder
SEAL AND SIGNATURE
GETCO/E/TS SEL054/66DCP-P&D/W&WOC/ R1 Dt. March-2022
shall have to procure cement from the open market according to line
requirement and keep sufficient quantities to avoid delay in work. Same quantity
of cement is to be utilized from his own stock. Account of cement utilized at
each location duly certified by concerned GETCO supervisor and engineer in
charge of work, is required to be maintained and submitted with each R.A Bill.
No wastage is permitted as same is to be procured by the Bidder of brand
approved by the GETCO at his own cost from the authorized dealer.
7.2 Use of Cement :
The rates in Schedule-‘B’ are inclusive of cement cost. Bidder has to purchase
fresh 43 grade cement confirming to IS:8112 and brand approved by GETCO.
Bidder has to construct pucca godown at site of work so that cement bags can
be properly preserved to avoid damage due to any kind of water and moisture.
Bidder has to bring sufficient quantities of cement bags and at no time less then
200 (Two hundred) bags to maintain progress of work. The work should not
suffer for want of cement. It is full responsibility of Bidder to bring sufficient
cement at site at right time. Cement should give the required strength of cement
concrete. Bidder has to submit material account for consumption of cement
used with every bill. In case of non submission of the same, bill will not be
passed. Bidder has to submit the copy of cement purchased bill along with each
RA Bill/Final Bill.
Nothing will be paid extra for over consumption. Bidder is fully responsible for
safety of cement at site. If GETCO authorized representative desires to check
cement stock at site, Bidder has to allow him at any time. Bidder has to maintain
day to day cement consumption/balance account at site. As far as possible,
Bidder has to maintain supply of cement of only one brand & grade through out
the work and on account of closer/shortage of approved brand, cement of other
brand in accordance of condition no. (1) will be allowed by Engineer-In-Charge.
Minimum cement consumption considered for nominal mix cement concrete will
be as follows:-
a. 1:1.5:3 - 8.12 Bags per CMT
b. 1:2:4 - 6.5 Bags per CMT
c. 1:3:6 - 4.5 Bags per CMT
d. 1:4:8 - 3.5 Bags per CMT
In respect of pile foundation, GETCO reserves the right to adopt design mix and
same will be indicated in BOQ of bidding document.
Bidder has to use minimum cement as above. Bidder should not use less than
the prescribed quantities of cement.
Bidder will be allowed to carry out work only after physical verification of cement
available at site .
7.3 The GETCO reserves the right to test the quality of steel and cement procured
by the Bidder at any Government recognized laboratory and the test results
shall be binding to the Bidder. If the test results are not found satisfactory the
SEAL AND SIGNATURE
GETCO/E/TS SEL054/66DCP-P&D/W&WOC/ R1 Dt. March-2022
entire lot supplied and work executed has to be replaced / re-executed by the
Bidder at no extra cost to the GETCO.
7.4 Back filling of the excavated soil is to be arranged by the successful bidder. For
back filling if borrowed earth is required, the same should be arranged of
suitable quality and quantity irrespective of site condition at no extra cost to the
7.5 The sand shall be the best quality containing hard siliceous materials, clean and
of sharp angular grit type and free from earth or organic matter or salts and to
the satisfaction of the Engineer in-charge. The sand shall be washed before
use. No saltiest or brackish water shall be used for concreting.
7.6 The mixture of concrete to be used shall be such as to produce a sound,
compact and water-proof concrete. The mixture shall not be weaker than the
ratio to be prepared. The concrete for chimney shall be prepared with 20 mm
stone metal and the concrete for pyramid/step/pad shall be prepared with
mm or 40 mm stone metal. The mixture shall be prepared using mixing machine
only. It should also be free from grit and dirt. The concrete shall be mixed as stiff
as required for placing the concrete in the form of moulds with ease and degree
to which concrete resists segregation will permit. Hence, the quantity of water
used should not be too much.
7.7 Proper form boxes or moulds adequately braced to retain proper shape while
concreting should be used for chimney, pyramid and slab portions & vibrator
machine shall be used at the time of concreting. Form boxes should be water
tight so as not to allow cement cream to come out leaving only sand and gully to
form honey combs in concrete. Form boxes should be cleaned and oiled before
using for concreting.
7.8 All sub-merged locations must be kept completely dewatered both during the
placing of concrete and for 24 hours after completion. There should be no
disturbance of concrete by water during this period.
7.9 Form boxes should not be removed before 24 hours, after concreting. Concrete
surfaces where required should be set right with rich cement and mortar after
removal of the forms.
7.10 The Chief Engineer (Projects) or Engineer appointed by him at his sole
discretion may uncover any cast foundation to find out the workmanship of
foundation. Bidder shall render necessary assistance during such fact finding
operation and shall comply the report of the investigating officer.
7.11 The Bidder will be responsible for constructing the foundations in accordance
with the design of each type of foundation supplied by the GETCO.
7.12 The payment of excavation will be limited to the volumes as per approved
excavation drawings even though the Bidder may excavate more for the sake of
his own convenience or for any reasons. If the excavated dimension/s is/are
more than the dimension/s shown In the approved drawing, the additional
SEAL AND SIGNATURE
GETCO/E/TS SEL054/66DCP-P&D/W&WOC/ R1 Dt. March-2022
excavated volume should be filled in with 1:3:6 mixture concrete at Bidders cost
in respect of materials, labours etc.
7.13 In case of rock soil, the extra excavated rock portion on all sides shall be filled
with 1:1.5:3 mix concrete at his own cost in respect of materials, labours etc.
7.14 The rates for excavation indicated in schedule shall also be applicable for
benching work, if required.
7.15 The tor / plain steel bars required for RCC type foundation shall be procured by
the successful Bidder in advance to avoid delay in the work.
7.16 No wastage is permitted for reinforcement steel, as the same is to be procured
by the Bidder at his own cost. Overlapping of reinforcement steel will be
permitted in line with provisions of IS:456. However separate approval of
modality shall be got approved from GETCO engineering department. However,
no payment shall be made for extra consumed reinforcement due to overlapping
7.17 GETCO reserves right to test the quality of steel and cement procured by the
Bidder at any Govt. recognized Laboratory and intended to be used for the
tower foundation works. The test results shall be binding to the Bidder and
8.0 [A] Classification of Soil.
Soil strata for adopting various types of foundations:
a) Normal Dry Soil:
The soil readily removable with ordinary spades and shovels viz. Murram,
hard murram etc. and to be used for location in normal dry cohesive or non
cohesive soils. If the black cotton soil is encountered up to 500 mm below
ground level, normal dry soil foundation shall have to be adopted. (The
normal dry soil foundation designs shall be inclusive of this stipulation)
b) Sandy dry soil:
To be used for locations where cohesion less pure sand or negligible
cohesive sand mixed with soil are met in dry condition
c) Sandy wet soil:
To be used in location where water table is met from top
d) Fully submerged black cotton Soil.
To be used at locations where soil is clay type, not necessarily black in color,
which shrinks when dry and swells when wet, resulting in differential
movement extending to a max., depth of 3.5 meter below ground level. For
designing foundation for this location the soil is to be considered submerged
in nature. If the black cotton soil is encountered only up to 500 mm from
ground level, normal dry soil foundation shall be adopted. (This foundation
design shall be inclusive of this stipulation).
To be used at locations where decomposed or fissured rock, hard gravel,
kankar, lime stone, laterite or any other soil of similar nature is met.
Undercut type foundation is to be used for soft rock locations.
SEAL AND SIGNATURE
GETCO/E/TS SEL054/66DCP-P&D/W&WOC/ R1 Dt. March-2022
To be used at locations where chiseling, drilling, and blasting is required.
g) Fully submerged soil:
To be used at locations where sub soil water table is met at less than
meter below ground level and up to complete depth of foundation.
h) Partially submerged soil:
To be used at the locations where the submerged soil water table is met at
1.5m or more than 1.5 m below the ground level, the top portion of the strata
being normal dry soil.
8.0 [B] GEOTECHNICAL INVESTIGATIONS & PARAMETERS:
The geotechnical investigation shall be carried out by Bidder, with no extra cost
to GETCO, for assessing bearing capacity and settlement characteristic of soil
determining shrinkage and swelling properties, suitable type, size of foundation
and foundation levels for 66/132/220/400KV Transmission tower at following
locations due to special conditions/situations. The scope of work under this
contract shall include but not limited to following.
1. For Marshy soil/Fully submerged black cotton soil conditions.
2. For filled up soil.
3. For river crossing/creek area crossing/pond crossing.
4. Special Requirement as per approved profile.
Geo technical investigation shall be carried out through GETCO approved
laboratory/agencies only and depth of bore hole shall be 15 meter/30 meter/40
meter depending on site requirement/line profile as approved by GETCO.
The boreholes shall be backfilled by the Bidder after completion of investigation
work. The entire work shall be carried out as per relevant Indian Standard
Specification. Every undisturbed Sample (UDS) and disturbed sample (DS)
collected from the boreholes shall include but not limited to the following series of
Tests: Applicable to
Natural moisture content: UDS
Atterberg limit: UDS & DS
Sieve analysis: UDS & DS
Unit weight: UDS
Specific gravity determination: UDS & DS
Unconfined compression test: UDS
Unconsolidated undrained triaxial strength: UDS
Consolidation test: UDS
9.0 Curing and back-filling :
9.1 After 24 hours of pouring, the concrete should be cured by keeping it
continuously wet for 14 days. After 48 hours of pouring, the pit may be backfilled
with excavated selected earth (which is free from grass, dung, wooden waste,
postures and fodder woods, shrubs, thorn etc.) sprinkled with necessary amount
of water and well compressed and consolidated in layers not exceeding
SEAL AND SIGNATURE
GETCO/E/TS SEL054/66DCP-P&D/W&WOC/ R1 Dt. March-2022
mm. If the excavated soil consists of large boulders/stone, the same shall be
broken to maximum size 80 mm and mixed with soil to be back filled. At the
locations where borrowed earth is required for back filling, this shall be done by
the Bidder at his own cost, irrespective of transportation from any land.
Thereafter, the exposed top end fill shall be kept wet for the remainder of above
prescribed curing period. The uncovered portion of concrete chimney above the
back filled earth shall be kept wet by providing empty gunny bags fully wrapped
around the concrete chimney for curing and ensure that the bags are kept wet
by frequent pouring of water on them.
9.2 Extra ordinary care shall be taken during back filling. The Bidder and GETCO
Engineer at site shall ensure that the back filling is done in the manner referred
above so that back-filled earth become homogeneous with surrounding parent
soil with the passage of time. The record for the same with day/date of curing,
back filling etc be maintained in the register and duly signed by the Bidder and
GETCO representative. The quantities of excavated earth obtained from a
particular location shall be generally utilized in back filling work in protection of
tower footing of same location unless it is unsuitable for such purpose. In the
later case, the back filling shall be done with borrowed earth of suitable quality
irrespective of land and the consolidation of earth shall also be done free of
9.3 The rates of stub setting are including the work of back filling of excavated pit.
The large stones / boulders shall be broken to maximum 80 mm size before
used for back-filling at no extra cost to the GETCO.
10.0 PROTECTION OF TOWER FOOTING :
Quantities of various protection works like stone revetment, concrete revetment, brick
masonry and random stone masonry to the foundations are to be executed by the
successful Bidder if indicated in the schedule and payment for such quantity shall be
as per unit rates accepted.
11.0 TOWER ERECTION AND GROUNDING:
( a) ERECTION OF TOWERS:
11.1 The super-structure of towers should be erected on foundations after
days of concreting. However, the method adopted for erection of tower is left
to the discretion of the Bidder subject to the condition that he takes
responsibility for any damage to materials. No tower member should get
strained or bent during erection. The towers must be truly vertical after
erection and no straining would be allowed to bring it in alignment. Maximum
tolerance in verticality that will be permitted is ONE mm per 360mm of tower
height. The bolt head shall be on outside faces and nuts and washers on
inside faces of the tower. All bolts & nuts shall be made fully tight and finally
the bolt threads shall be centre punched to avoid nuts getting loose.
Punching of bolts shall be made by chamfering the threads with centre
punch at least at three places equally spaced on contact surface of bolts and
SEAL AND SIGNATURE
GETCO/E/TS SEL054/66DCP-P&D/W&WOC/ R1 Dt. March-2022
11.2 Complete tower erection shall include erection of all accessories like danger
board, number plate, phase plate, C.I. Plate, Anti-climbing devices and
fittings including attachments like step bolts, ladders, platforms, 'U' bolts,
shackles, hangers, strain plates etc.
11.3 Suitable tower extension shall be erected to get desired ground clearance
whenever required, as determined at the time of survey and profiles.
11.4 To avoid pilferage of bolts and nuts and tower members, the bolts of the two
bottoms most panels (up to 10 meters) shall be tack welded at three places
on the nuts diametrically. The zinc rich paint shall be procured by the Bidder
at his own cost and shall be applied immediately following the tack welding.
11.5 The Bidder shall measure the tower footing resistance of each tower after it
has been erected and before stringing of the earth wire during dry weather.
Each tower shall be earthed; the tower footing resistance shall not exceed
ohms. Pipe type and counter poise type earthing which ever required shall
be done in accordance with the latest edition and revision of IS : 3043 (
code of practice for earthing ).The Bidder shall measure the footing
resistance of each location and prepare the record for submission and
approval of Engineer-in-Charge for deciding the type of grounding to be
11.6 Pipe Type Earthing :
At locations where footing resistance does not exceed 10 Ohms., the pipe
type earthing as per appended drawing shall be provided. The Bidder will
have to supply all the materials required for grounding like pipe, flat, bolt-
nuts, salt, fine broken coke/charcoal etc. The earthing is to be done by
making a bore hole for insertion of pipe away from the tower leg excavation
line as per attached drawings.
11.7 Counterpoise Earthing :
At locations, where footing resistance exceeds 10 Ohms, counterpoise
earthing as per appended drawing shall be provided to bring down the tower
footing resistance below 10 Ohms. The Bidder will have to supply all the
materials required for grounding like lugs, G.I. wire, bolts, nuts etc. The
counterpoise earthing shall be buried 1000 mm below ground level.
11.8 The method for providing earthing shall be at the desecration of the Bidder.
11.9 The rates for erection of structure of tower and extension up to 21 meters
and special / river crossing tower on special foundation/pile foundation
carried out by Bidder shall be on per MT basis. These rates shall be valid
irrespective of location, nature and specification.
SEAL AND SIGNATURE
GETCO/E/TS SEL054/66DCP-P&D/W&WOC/ R1 Dt. March-2022
11.10 The payment for superstructure / extension / special or river crossing tower
shall be made only after erection of complete tower as per structural
11.11 The rates for fixing of anti-climbing devices, danger board, number plate,
phase plate, circuit identification plate shall be inclusive of all materials and
11.12 The rates for providing earthing to the tower either pipe or counter poise
type inclusive of supply of complete earthing set, coke, charcoal, salt etc.
including required bolt nuts as per approved drawing all materials and
11.13 The Bidder shall arrange for all the equipments for tack-welding purpose. The
rates shall be inclusive of supply and application of zinc rich paint on it.
11.14 The Bidder shall arrange required equipments for measurement of soil and
tower footing resistance of each location, the tower footing resistance shall
be less than 10 Ohms and submit the joint measurement record of same
jointly signed by Bidder and Engineer in charge of line with final bill. The
payment shall be released only after receipt of final soil resistance details on
providing earthing at each location.
12.0 INSULATOR HOISTING:
12.1 Suspension silicone rubber insulator/ Anti-Fog Disc Insulator/Plain Disc
Insulator shall be used on all tangent type towers and tension silicone rubber
insulator/ Anti-Fog Disc Insulator/Plain Disc Insulator on all small, medium,
large angle and dead end type tension towers.
13.0 STRINGING :-
The stringing work should be carried with the help of tensioner and puller
machine or Manual.
13.1 The rates for any type of stringing work, out of followings are indicated in
i) Stringing of one ground wire,
ii) Stringing of single / double circuit line.
iii) Hot-line stringing of conductor
iv) LILO arrangement
13.2 The rates for stringing of conductors and ground wire for special crossings
like river shall be on per KM basis only and shall be paid according to actual
work done. In case special towers are suspension type, the special shall
mean major river crossing section considering the span from one anchor
tower to the other end anchor tower. If the special towers are tension type,
the special crossing shall mean span from special tower to special tower of
SEAL AND SIGNATURE
GETCO/E/TS SEL054/66DCP-P&D/W&WOC/ R1 Dt. March-2022
13.3 The stringing work should be planned in such a manner in consultation with
the Engineer in charge of the work that minimum shut down of power line
crossings are required. Revenue loss due to any undue shut down i.e. after
the shut down is arranged and required to be extended on account of Bidder
shall be recoverable from the Bidder.
13.4 Before commencing of stringing work, Bidder must obtain approval of sag
tension charts (these shall have to be supplied by the Bidder) showing final
sag and tension for various temperature and spans. The stringing chart shall
be prepared according to appended format only.
13.5 The Bidder shall be responsible and will take care of proper handling of
Conductor drums. Sufficient numbers of aluminum snatch blocks shall be
used for paying out the ACSR Conductor. Necessary precautions shall be
taken to avoid conductor rubbing on the ground by providing adequate
ground roller, rollers on supports. Additional rollers shall also be provided to
cross thorny hedges, footing and other obstructions to avoid scratching of
conductor. The conductor and ground wire shall be made to sag correctly as
per stringing charts, before they are finally transferred to the hardwares for
conductors and to clamps for ground wire. No joint should be made at less
than 30 metres from the tower end and no joint shall be permitted in Railway,
River, road and other important crossings spans. There shall not be more
than one joint in a span of each conductor. The sag shall be adjusted to suit
the sag indicated against actual temperature for an individual span. The
thermometer shall be provided at the conductor point during the stringing
work. Dynamometers shall be used in tensioning the conductors. All
conductors shall be stressed to their maximum working load at the time of
stringing, as per approved stringing charts.
13.6 The minimum clearance between the lowest point of conductor and ground
shall not be less than required. All compression joints should be carefully
made and a record of initial and final lengths of the joints jointly signed by
Bidder's and GETCO representatives shall be maintained. Check for sag
should also be made at intervals when conductors are drawn up. Over
stressing, causing damage to towers, should be avoided. Care should be
exercised not to over tension the conductor. An extra sag of 150 mm be
allowed at all the important tension locations like Railway/River Crossings.
For stringing of bundle conductor on line, the Bidder shall use only tension
stringing equipment. The earth wire may be strung by conventional method
and tension stringing equipments may not be used. The Bidder shall ensure
that the stringing gadgets are not anchored to the tower footing.
Each phase conductor shall consist of one conductor ( ACSR Dog/Panther)
the ground wire shall be 7/3.15mm galvanized steel wire.
To avoid contact with the ground or any object above ground level the
conductor shall be pulled by the controlled tension methods using neoprene
SEAL AND SIGNATURE
GETCO/E/TS SEL054/66DCP-P&D/W&WOC/ R1 Dt. March-2022
lined double pulled wheel type tension stringing equipments. The
equipments shall be capable of maintaining continuous tension of not less
than of 5000 kg. which shall be such that the conductor is maintained about
20% grater than the sags specified in the correspondence stringing sag
13.7 After being pulled the conductor/ground wire shall not be allowed to hang in
the stringing sheaves for more than 72 hours, before being pulled to the
specified sag. During the time the conductor / ground wire is on the stringing
sheaves before sagging-in, it shall be ensured that the conductor / ground
wire is not damaged due to wind, vibration, vehicles or other causes.
Scaffolding should be used to cross the important roads and Railway
Crossing for minimum interruption to traffic.
13.8 The conductor shall be pulled up to desired sag and left in serial stringing
sheaves for at least one hour after which the sag shall be rechecked and
adjusted, if necessary, before clipping in and transferring the conductors
from the serial stringing sheaves to the suspension clamps.
13.9 Conductor shall be clamped within 24 hours of sagging. The sag will be
checked in the larger spans of the section in case of sections up to eight
spans and in one intermediate larger span also for section with more than
13.10 The stringing sheaves, when suspended on the transmission structure for
sagging, shall be so adjusted that the conductor will be on the sheaves at the
same height as the suspension clamp to which it is to be secured.
13.11 The stringing of the ground wire shall be done in accordance with the
stringing charts approved by the GETCO. The ground wire of galvanized
steel shall be strung to run continuously over the conductors. The ground
wire shall be pulled, sagged and clamped-in from tension tower to tension
tower before the phase conductors are pulled in that section.
13.12 All the line conductors shall be terminated at sub-station structures whose
details shall be furnished by the GETCO at the appropriate time. The
contractor shall fix strain insulators on the sub-station structures.
13.13 Armour rods and vibration dampers shall be fitted at each suspension tower
before final clamping of conductor with Insulator strings. Vibration damper
shall be fitted at each tension tower after final clamping of conductor with
insulator strings. Vibration dampers are to be fixed using aluminum tape with
each clamping bolt and in correct vertical position in relation to conductor.
Compression type joints are to be used for jointing of conductors. Each part
connected with joints shall be perfectly cleaned by wire brush and properly
greased before final compression. All the joints of conductors and earth wire
shall be made with the best workmanship and shall be perfectly straight and
having maximum possible strength.
SEAL AND SIGNATURE
GETCO/E/TS SEL054/66DCP-P&D/W&WOC/ R1 Dt. March-2022
13.14 Proper guys shall be provided to counter balance the paying out tension of
conductor/ground wire at the tension locations, to avoid damage to towers
and/or accident.
13.15 Stringing work shall mean, the activities of fixing of insulator and insulator
hardwares, paying, jointing, tensioning, clamping with armour-rod, providing
dampers, repairing of conductors (if any) and fixing the conductor at tension
14.0 FIELD QUALITY PLAN
14.1 Bidder shall invariably submit the FQP along with Technical Bid for erection of
line including all the activities such as excavation, concreting, erection,
stringing etc. with detailed check list to be referred
SEAL AND SIGNATURE
GETCO/E/TS SEL054/66DCP-P&D/W&WOC/ R1 Dt. March-2022
TECHNICAL DETAILS FOR ERECTION &
COMMISSIONING OF TRANSMISSION LINE
survey & check survey :-
The Bidder has to carry out check survey, profile using modern technique as per
the complete BOQ given in this section. If any minor modification in alignment of
route, during check survey or while scrutiny of check survey is required, the
same shall be carried out by the Bidder at no extra cost to the GETCO.
2. RIGHT OF WAY, WAY LEAVE, TREE CUTTING AND OTHER
The successful bidder shall follow the ROW guideline issued by Govt. of
Gujarat through Tharav No. GET-11-2015-GoI-199-K dated 14.08.2017 (copy
attached) for Right of Way / Way Leave Clearance / Tree-crop Damages
etc. during construction of transmission line.
2.1 All statutory clearances and permissions from various statutory bodies/Govt.
authorities like Forest Department, Railway, Aviation Authority, Maritime Board,
National Highway Authority, etc. wherever required GETCO will co-ordinate,
along the entire route of the Transmission line, however the complete
responsibility lies with the contractor for submission of the required details,
follow up with statutory bodies etc. for obtaining the approval.
2.2 For necessary forest clearance, the GETCO will do the processing and the
payment to the central government/state government for compensation of forest
clearance will be paid by the GETCO as necessary. For permission from other
Govt. authorities like railway, National highway, State Highway, GIDC, GMDC,
Maritime Board, Gas or Oil Pipeline, Aviation Authority, Police protection, State
Reserve Police(SRP), legal matters etc. the payment shall be made by the
2.3 For clearances, permissions etc. from various authorities, the Bidder shall not
remain contended by simply informing the GETCO, but shall have to arrange for
personal follow up to overcome the difficulties in the interest of progress of the
2.4. The Bidder shall instruct his labours and staff to use minimum area while
executing the work where there are standing crops. No persons of the Bidder
should pick up any items from the standing crops or fruit. The Bidder should
take all possible steps to avoid or minimize damages to the standing crops. On
completion of the work, bidder shall make the surrounding soil to its original
2.5. For clearance of way leave permission/obstruction etc., as per GoG Tharav No.
GET-11-2015-GoI-199-K dated 14.08.2017 the Bidder is solely responsible
SEAL AND SIGNATURE
GETCO/E/TS SEL054/66DCP-P&D/W&WOC/ R1 Dt. March-2022
including any payments required to be made thereof including that for crop /tree
The bidder shall be responsible for mapping the route and location of
towers with Survey No. of land on Tikka Map and name of the land owner
from Revenue records (7/12). Based on these data, Notice shall be issued
by GETCO to respective land owners for tower erection works as per the
Circular No. GETCO/CE(P)/LO/Circular/2882 dated 21.07.2011.
2.6 Removing of trees, tree cutting and crop/ tree compensation thereof shall be
organized and paid by the Bidder as per GoG Tharav No. GET-11-2015-GoI-
199-K dated 14.08.2017. The cost of cutting the trees shall also be borne by the
Bidder. GETCO’s field officer shall render necessary helps for fixing the
compensation through concerned Department or other local revenue authority
like Talati-Mantri, Sarpanch / Mamlatdar. Such Payments are to be given
immediately after foundation, tower erection and stringing stages and
recorded in the ‘Panch Nama’. The amount to be paid shall also be informed
to the GETCO’s field officer not below the rank of Executive Engineer in charge
of work, however bidder should not claim for the delay in work on account of the
above. The record register of location wise payment shall be maintained.
2.7 It is the Bidder’s responsibility to take appropriate action for way leave etc. as
indicated above well in advance so that objections from the land owners
could be addressed well in time. In the event of any objection from land
owners, work shall be carried out by taking a order from District
Magistrate location wise. This order of District Magistrate shall also cover
provision of police protection and SRP. Circular No.
GETCO/MD/CE(P)/LO/Circular/22 dated 09.07.2013 of Managing Director,
GETCO is to be strictly followed. As per this, State Police or SRP
protection for any activity of transmission line is to be sought only after
permission from District Magistrate in all such cases wherever and
whenever objection is raised by land owner for laying of transmission line
3.0 TESTING AND COMMISSIONING:
3.1 The Bidder after completion of erection work will ensure that all works
connected with line have been completed. These works shall be done correctly
as per Indian Electricity Rules and Procedures. Any extra cost involved due to
incompleteness of work or bad workmanship found out subsequently shall be
set right forthwith by the Bidder at his own cost.
3.2 After the erection is complete in all respects, the line should be thoroughly
patrolled and checked for continuity and clearances. The line should be
meggered to check its insulation level. A written confirmation should be given to
the Engineer-in-Charge that, the men, materials, tools and earthings (if any) are
removed and the line is safe for charging. On charging the line, if it does not
stand and trips, the Bidder should arrange to patrol the line and find out the
causes of the tripping and rectify the defect at no extra cost to the GETCO.
SEAL AND SIGNATURE
GETCO/E/TS SEL054/66DCP-P&D/W&WOC/ R1 Dt. March-2022
4.0 HANDING OVER OF LINE DOCUMENTS:
4.1 On completion of all erection activities, the Bidder has to furnish following
information along with technical details to concerned Engineer-in-Charge of the
work in triplicate duly bound:-
1) Approved surveyed route with permanent marks, (To be obtained
from the GETCO)
2) Approved copy of profiles with tower schedule, (To be obtained from
the GETCO except for portion where any change is approved)
3) Location wise soil strata details of each pit excavated, type of
foundation executed, volumes of excavation & concrete and RCC
4) Details of revetment, retaining walls, etc., work done for protection of
tower footing and their approved drawing copies,
5) Approved copies of excavation plan and foundation drawings, (To be
obtained from the GETCO)
6) Approved copies of structural drawings of stubs, templates, towers,
extensions, etc., (To be obtained from the GETCO)
7) Approved copies of stringing charts,
8) Value of tower footing resistance jointly measured before & after
providing earthing and type of earthing executed, duly signed by
Engineer Incharge of line.
9) Details of spans and phase where mid span joint, repair sleeve are
10) Location wise type and numbers of insulators, insulator hardwares,
earth wire hardware, conductor accessories, provided, etc.
11) Separate detail of each crossing like road, river, railway, power line,
etc and details of clearance as per Indian Electricity Rules.
5.1 The Bidder shall ensure that at the end of each sub-activity the surplus material
is immediately removed from the work-site to avoid loss and injury to the public.
5.2 The Bidder has to make reconciliation of material account and to settle final bill
including signature in all relevant papers required for passing of final bill within
three months from the date of charging / commissioning of line.
5.3 A lump sum amount of 6 % of the order value OR Rs.1.0 lac whichever is less,
will be with held from the running bills of stringing work, which will be released
only after handing over of these documents to the satisfaction of concerned
Superintending. Engineer (Trans).
Note: The weights of tower extensions above 6 Mtr. are taken tentative. The
successful Bidder has to design the extension above 6 Mtr. and should be
SEAL AND SIGNATURE
GETCO/E/TS SEL054/66DCP-P&D/W&WOC/ R1 Dt. March-2022
got approved by GETCO with no extra cost. The payment of the extension
above 6 Mtr. will be paid as per the BOM approved by GETCO.
SEAL AND SIGNATURE
GETCO/E/TS SEL054/66DCP-P&D/W&WOC/ R1 Dt. March-2022
INDEX FOR FILES CONTAINING DRAWINGS AND
Sr. No. Description
1. Tower Material Specification
2. ACSR DOG/Panther conductor specification ( As per scope)
3. Earth & stay wire specification
4. Insulators specification
5. ACSR H/W & Accessories specification ( As per type of conductor
Dog/Panther & scope)
Drawings of H/W & Accessories (As per requirement)
6. 66kV Single suspension H/W
7. 66kV Double suspension H/W
8. 66kV Single tension H/W
9. 66kV Double tension H/W
10. Preformed Armour rod suitable for ACSR conductor
11. Vibration damper- 4R for ACSR conductor
12. Tubular Repair Sleeve
13. Tubular Compression Joint
14. Earth wire accessories 7/3.15
15. Tension Clamp Suitable for 7 3.15 MM Earth Wire
16. Suspension Clamp for Earth Wire
17. Mid span Compression Joint for Earth Wire
18. Cross by Clips for Earth Wire
19. Tinned Copper Earth Bond
20. Tower Earthing drawing 1 of
21. Tower Earthing drawing 2 of
23. Tower Earthing drawing 3 of
24. Supply & Erection - Specification
NOTE: The entire part-II (Technical Specifications) should be down loaded and
submitted with Technical Bid duly signed by the Bidder and stamped with round
company stamp on every page.
SEAL AND SIGNATURE
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
5.L-2 Schedule Kidiyanagar P-1.pdf
6.BOQ 66kV Kidiyanagar P-1 Line E-405.pdf
7.Lat-Long detail 66kV Fatehgadh - Kidiyanagar Line PKG-I.pdf
8._TOWER MATERIAL-66KV LINE-PANTHER.PDF
9.Amendment- Structure weight.pdf
10.HW and ACCS PANTHER CONDUCTOR.PDF
11.ON - Ammendment for ROW clause Tender Copy.pdf
12.OPGW (48F) specs final-R2-11.09.2023 final.pdf
13.R1 - STEEL DRUM.pdf
15.R5 May 24- Silicon Rubber - Print Copy.pdf
16.Standard MQP GI Tower material for issuence to SUPPLIER COPY.PDF
17. tender copy SUPPLY and ERECTION OF 66KV DOUBLE CIRCUIT LINES - with and WITH....pdf
18_PIPE_TYPE_EARTHING_1.pdf
19_PIPE_TYPE_EARTHING_2.pdf
20_PIPE_TYPE_EARTHING_3.pdf
21_ERECTION Circular-1.pdf
22_ Erection circular -2.pdf
23_RoW policy 2021.pdf
24_STD FQP TR LINE JUNE-2014.pdf
25_Public Procurement Circular of GOI.pdf
26_Safety_regulation_for_transmission_line.pdf
27_ compensation GR_0001.pdf
28 RoW Guideline of GETCO GoG.pdf
30. SD cum PBG Format.pdf
31 Form for Networth Annual turnover LA.pdf
32 ONLINE SCHEDULE_TECH.pdf
33 Online Schedule-QR.pdf
1. E-437 Part-I Tender Specifications Kidiyanagar P-1.pdf
2. E-437 TL Amendment -I Part-I Tender Spec.pdf
3.Tender Notice E-437.pdf
4.PB Part-III of 66kv Kidiyanagar P-1 E-437.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .