Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 CrAccepted-AOC | ₹12.0 Cr Quoted ₹12.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹13.5 CrRejected-Finance ATHWAJAN SRINAGAR 191101 J K | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 191101 | ₹13.5 Cr | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | M/S ABDUL SALAM MIR CONSTR CO PVT. LTD L1 | ASM BUILDERS L2 |
|---|---|---|---|---|---|
| 1.00 | Building work
SCHEDULE 'A' PART-I
Completion of incomplete/ balance work in construction of block of single living accomodation for 9 Hav and 66 ORs (Double storey) complete all as specified and shown on drawings. (First Block)
(Refer Annexure-I) | 1 | EACH BLOCK | 1,66,05,200 ₹1.7 Cr | 1,35,00,000 ₹1.4 Cr |
| 1.01 | Completion of incomplete/ balance work in construction of block of single living accomodation for 9 Hav and 66 ORs (Double storey) complete all as specified and shown on drawings. (Second Block)
(Refer Annexure-I) | 1 | EACH BLOCK | 2,12,14,000 ₹2.1 Cr | 1,88,50,000 ₹1.9 Cr |
| 1.02 | Completion of incomplete/ balance work in construction of block of Cook house and Dining Hall for 150 persons complete all as specified and shown on drawings.
(Refer Annexure-II) | 1 | EACH BLOCK | 98,46,864 ₹98.5 L | 1,08,25,000 ₹1.1 Cr |
| 1.03 | Completion of incomplete/ balance work in construction of block of CHS Plant room ( single storey) 120 sqm complete all as specified and shown on drawings.
(Refer Annexure-III) | 1 | EACH BLOCK | 7,31,850 ₹7.3 L | 6,80,000 ₹6.8 L |
| 1.04 | Completion of incomplete/ balance work in construction of block of Plant room ( single storey) 80 sqm for Hot water supply all as specified and shown on drawings.
(Refer Annexure-IV) | 1 | EACH BLOCK | 14,49,630 ₹14.5 L | 14,00,000 ₹14 L |
| 1.05 | Completion of incomplete/ balance work in construction of block of pump house building ( single storey) 30 sqm complete all as specified and shown on drawings.
(Refer Annexure-V) | 1 | EACH BLOCK | 6,08,090 ₹6.1 L | 85,00,000 ₹85 L |
| 1.06 | Completion of incomplete/ balance work in construction of block of Generator room building (single storey) 100 sqm complete all as specified and shown on drawings.
(Refer Annexure-VI) | 1 | EACH BLOCK | 5,71,200 ₹5.7 L | 5,98,000 ₹6.0 L |
| 1.07 | Construction of covered inter connecting passage 2.40 mtr wide complete all as specified and shown on drawings. Note : Length in parts to connect various block of Sch A Part -I | 22 | RUNNING METRE | 34,300 ₹7.5 L | 45,000 ₹9.9 L |
| 1.08 | Construction of block of Garbage bin with mild steel gate complete all as specified and shown on drawings. | 3 | EACH | 1,25,050 ₹3.8 L | 1,45,000 ₹4.3 L |
| 1.09 | Construction of RCC underground sump of 30000 ltr capacity all as specifiedd and shown on drawings. | 1 | EACH | 4,30,000 ₹4.3 L | 47,000 ₹47,000 |
Tender Value
₹8.6 Cr
EMD Value
₹7.5 L
Closing Date
13 Sept 2025, 6:00 pmClosed
CWE KHUMBATHANG
HQ CWE KHUMBATHANG PIN 900270 C/O 56 APO
COMPLETION OF INCOMPLETE WORK FOR PROVN OF OTM ACCN AT THASGAM (DRASS)
2025_MES_725314_1
80051/105/2023-24
Open Tender
Civil Works
630 days
DRASS
Class A Cat a(i) and b(ii)
8 documents required · 8 mandatory
₹3,000
GE KARGIL
₹7.5 L
Yes
10 Nov 2025
9 Aug 2025
15 Sept 2025
9 Aug 2025
13 Sept 2025
23 Aug 2025
19 Aug 2025 - 22 Aug 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.16 MB
Download all tender documents and submit your bid