| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC Work Awarded |
| 2 | L2₹1.5 Cr+₹1.6 L (1.14%)Rejected-Finance FLAT NO A 1108 TOWER P 2 ASHIYANA PALM COURT RAJNAGAR EXTENSION GHAZIABAD UP | GHAZIABAD | UTTAR PRADESH | 201001 | ₹1.5 Cr+₹1.6 L (1.14%) | L2 | Rejected-Finance Due to higher bid rates |
| 3 | L3₹1.6 Cr+₹15.8 L (11.0%)Rejected-Finance OM VIHAR COLONY DELHI ROAD ROORKEE | ₹1.6 Cr+₹15.8 L (11.0%) | L3 | Rejected-Finance Due to higher bid rates |
Tender Value
Refer Docs
EMD Value
₹3.4 L
Closing Date
29 Sept 2022, 11:00 amClosed
Superintending Engineer
Electricity Distribution Circle, Rudrapur
Shifting of 33 KV, 11 KV, LT Lines and 11/0.4 KV T/F through overhead and AB cable from Khatima Chowk towards Sitarganj Road near Tharu Vikas Bhawan under EDD Khatima under the head of Deposite
2022_UPCL3_49468_1
EDC(USN)72/2022-23
Open Tender
Electrical Works
Item Rate
90 days
Khatima
Pl Refer tender documents
3 documents required · 3 mandatory
₹11,800
SE EDC Rudrapur
₹3.4 L
20 Jul 2023
16 Sept 2022
30 Sept 2022
16 Sept 2022
29 Sept 2022
16 Sept 2022
Amount
Annexure-A (LABOUR CHARGES)
Cartage of STP SP-55 Pole from store center Haldwani, Sitarganj, Rudrapur to Khatima dump store with loading & unloading at both points and proper stacking upto 70km.
Cartage of STP SP-33 Pole from store center Haldwani, Sitarganj, Rudrapur to Khatima dump store with loading & unloading at both points and proper stacking upto 70km.
Cartage of T/F 11/0.4KV 100 KVA from store center Haldwani, Sitarganj, Rudrapur to Khatima dump store with safely loading & unloading at both points, upto 70km.
Cartage of Cable and Other small line material from store center Haldwani, Sitarganj, Rudrapur to Khatima dump store with safely loading & unloading at both points, upto 70km.
Head load Cartage of STP SP-55 Pole from Khatima dump store to work site with safely loading & unloading at both points.
Head load Cartage of STP SP-33 Pole from Khatima dump store to work site including safely loading & unloading at both points.
Charges of Erection & Grouting of STP SP-55 single Pole structure including digging of pit size 0.6X0.6X1.8 M, grouting, stone pad and making kiciking block in E&B, fixing of all accessories upto energisation as per RESSPO contructuion manual.
Charges of Erection & Grouting of STP SP-33 single Pole structure including digging of pit size 0.6X0.6X1.8 M, grouting, stone pad and making kiciking block in E&B, fixing of all accessories upto energisation as per RESSPO contructuion manual.
Charges of Erection & Grouting of STP SP-55 double Pole structure including digging of pit size 0.6X0.6X1.8 M, grouting, stone pad and making kiciking block in E&B, fixing of all accessories upto energisation as per RESSPO contructuion manual.
Charges of Muffing of poles size 0.45x0.60cm radious with CC 1:3:6 block and size 45 cm height from ground level including cost of cement, stone and sand etc. as per direction of Engineer in Charge.
Charges of Unrolling of 11 KV XLPE 240 SQ. MM Cable drum by proper means of jack & trolly arrengement as per direction of Engineer in Charge.
Charges of Fabrication and fixing of MS channel/bracing complete for double pole 100x 50 mm& MS angle 65x65x6 mm. Including fixing of channel with clamps including cutting drilling holes and fabrication as required as per direction of Engineer in Charge.
Charges of Laying, spreading, Stringing and sagging of 11 kv acsr dog conductor Including Fixing of all accessories Clamp etc, all Complete work as per direction of Engineer in Charge.
Charges of Laying of Guarding on GI WIRE including fixing angle clamp, eye bold , complete proper sagging of guard wire including all accessories as per RESSPO manual & direction of Engineer in Charge.
Charges of Erection & Grouting of Stay set including digging of pit size 0.6X0.6X0.3 Mtr with stay rod 16x1800 mm, stay wire 7/8 swg with proper nozzeling with back filling of pit with CC 1:4:8 in bottom of pit in size 0.60 as per RESSPO manual & direction of Engineer in Charge.
Charges of Painting of poles with angle and channel & all steel part by one coat of red oxide primer & two coat of Alu. Paint & two strip of fluoresent alternate red & whit paint 30 cm wide upto 1.5 mtr from ground level.
Shifting charges of Existing 11/0.4 kv 25 KVA Transformers with LT cable to new D/P plinth with help of hydra, chain pulley, Crain & labour etc, Fabrication of complete D/P with complete fitting of all accessories, earthing including L.A as per direction of Engineer in charge.
Shifting charges of Existing 11/0.4 kv 63 KVA Transformers with LT cable to new D/P plinth with help of hydra, chain pulley, Crain & labour etc, Fabrication of complete D/P with complete fitting of all accessories, earthing including L.A as per direction of Engineer in charge.
Shifting charges of Existing 11/0.4 kv 100 KVA Transformers with LT cable to new D/P plinth with help of hydra, chain pulley, Crain & labour etc, Fabrication of complete D/P with complete fitting of all accessories, earthing including L.A as per direction of Engineer in charge.
Shifting charges of Existing 11/0.4 kv 400 KVA Transformers with LT cable to new D/P plinth with help of hydra, chain pulley, Crain & labour etc, Fabrication of complete D/P with complete fitting of all accessories, earthing including L.A as per direction of Engineer in charge.
Shifting charges of Existing 11/0.4 kv 500 KVA Transformers with LT cable to new D/P plinth with help of hydra, chain pulley, Crain & labour etc, Fabrication of complete D/P with complete fitting of all accessories, earthing including L.A as per direction of Engineer in charge.
Charges of construction of trnsformer plinth (7x4x3) ft., filled by concrete & mud, With material CC Work & complete plaser. Including cartage of material (3 nos) as per direction of Engineer in charge.
Charges of Installation of mesh fencing around DT for protection of DT having gate & Lock arrengment(9x5x4) ft. (3 no.) as per direction of Engineer in charge.
Charges of Laying of HT 11KV Cable in 1.5 mtr depth with suitable trencheless method including laying intrench with providing & fixing of HDPE pipe PE80PN6 & having dia 160 mm conferming to IS4984/1995 & having thickness 9.1 to 10.3mm. Including reparing cost of digging location/ road as per direction of Engineer in charge.
Charges of Fixing of proper cable jointing termination kit with crimping of lugs & proper insulation. With all T&P (by jointig kit manufacturer ) as per direction of Engineer in charge.
Charges of Fixing of GI Pipe complete as per direction of Engineer in charge.
Charges of Fixing & Installation of marking RCC Piller above cable trench show the route of underground 11 KV cable & danger symbol including cost of material as per direction of Engineer in charge.
Charges of Providing & fixing danger board under plate complete by providing clamp of MS flat 50x6 mm with Nut & bolt, danger board of MS sheet 2 mm thick as per direction of Engineer in charge.
Charges of Removing & reconnection of Single Phase LT Consumer Service Connection & removed old cable by armoud cable as per direction of Engineer in charge.
Charges of Removing & reconnection of Three phase LT Consumer Service Connection as per direction of Engineer in charge.
Charges of Laying Stringing sagging of Ab Cable. Including Fixing of Insulated Piering Connector, Ded end Clamp with I Hook,Suspention Clamp with I Hook in all Complete work as per direction of Engineer in charge.
Charges of Laying of LT Cable in 1.5 mtr depth with suitable trencheless technology including laying intrench with providing & fixing of HDPE pipe PE80PN6 & having dia 160 mm conferming to IS4984/1995 & having thickness 9.1 to 10.3mm. as per direction of Engineer in charge.
Charges of Laying & Fixing Insulated Cable 1X25/1x16 sq mm. as per direction of Engineer in charge.
Charges of Installation of L.T. Distribution Box Complete work as per direction of Engineer in charge.
Charges of Earthing of poles by way of digging of pit size (50x750x990)mm deep of earth electrode in to 1000mm below,found level fixeing and connection of G.I wire 7/16swg both at electrode end as per direction of Engineer in charge.
Charges of mounting of 11/0.4 kv 100 kva t/f as per direction of Engineer in charge.
Charges of Fabrication and fixing of channel/brecing complete for double pole pole 100X 50 mm. Including fixing of channel with clamps including cutting drilling holes and fabrication as required as per direction of Engineer in charge.
Charges of Mounting charges of 11/0.4 kv Transformers with LT cable to new D/P / plinth with help of hydra ,chain pulley, Crain & labour etc, Fabrication of complete D/P with complete fitting of all accessories, LT Cable, earthing including L.A 100 KVA T/F as per RESSPO manual and direction of Engineer in charge.
Charges of Chemical Earthing: Earthing of 11 kv cable termination & distribution transformer including digging of pit of size 2.5 Mtr depth and make hole of size 150mm. Placing of earthing electrode (to be supplied by contractor as per drawing No.A) as drawing B, connecting the same with G.I.Strip (to be supplied by contractor ) of size 35x6mm as per drawing C for aminimum lenght 6m .treatment of soil with highly condctive substance asper IS30343 complete in all respect, result of earthing resistance to be recroded .before and after installation of earthing. The earth resistance after earthing should be less than 1 Ohm.
Charges of dismantling of existing ST SP-23 single pole structure including MS Channel, angle, disc fitting, insulator, clamps, nut and bolts etc. as per direction of Engineer in charge.
Charges of dismantling of existing ST SP-33 single pole structure including MS Channel, angle, disc fitting, insulator, clamps, nut and bolts etc. as per direction of Engineer in charge.
Charges of dismantling of existing ST SP-55 single pole structure including MS Channel, angle, disc fitting, insulator, clamps, nut and bolts etc. as per direction of Engineer in charge.
Charges of dismantling of existing PCC pole 8.5 mtr long single pole structure including MS Channel, angle, disc fitting, insulator, clamps, nut and bolts etc. as per direction of Engineer in charge.
Charges of dismantling of existing PCC pole 9 mtr long single pole structure including MS Channel, angle, disc fitting, insulator, clamps, nut and bolts etc. as per direction of Engineer in charge.
Charges of dismantling of existing PCC pole double pole structure including MS Channel, angle, disc fitting, insulator, clamps, nut and bolts etc. as per direction of Engineer in charge.
Charges of dismantling of existing ST SP-55 double pole structure including MS Channel, angle, disc fitting, insulator, clamps, nut and bolts etc. as per direction of Engineer in charge.
Charges of dismantling of existing ACSR weasel conductor of 11 kv line as per direction of Engineer in charge.
Charges of dismantling of existing HT AB Cable 3*120sq mm of 11 kv line as per direction of Engineer in charge,
Charges of dismantling of existing ACSR weasel conductor of LT line as per direction of Engineer in charge,
Charges of dismantling of existing ACSR rabbit conductor of LT line as per direction of Engineer in charge,
Charges of dismantling of existing LT AB Cable 3*95 sq mm of LT line as per direction of Engineer in charge,
Charges of dismantling of 500 KVA DTR from DR./Plinth including opening of all connectors circuits and earthing Strip etc. as per direction of Engineer in charge.
Charges of dismantling of 400 KVA DTR from DR./Plinth including opening of all connectors circuits and earthing Strip etc. as per direction of Engineer in charge.
Charges of dismantling of 100 KVA DTR from DR./Plinth including opening of all connectors circuits and earthing Strip etc. as per direction of Engineer in charge.
Charges of dismantling of 63 KVA DTR from DR./Plinth including opening of all connectors circuits and earthing Strip etc. as per direction of Engineer in charge.
Charges of dismantling of 25 KVA DTR from DR./Plinth including opening of all connectors circuits and earthing Strip etc. as per direction of Engineer in charge.
Cartage of old and used ST SP-55 Poles from site to store center distance approximate 20km. with Loading Unloading Complete as per direction of Engineer in charge.
Cartage of old and used ST SP-33 Poles from site to store center distance approximate 20km. with Loading Unloading Complete as per direction of Engineer in charge.
Cartage of old and used ST SP-23 Poles from site to store center distance approximate 20km. with Loading Unloading Complete as per direction of Engineer in charge.
Cartage of old and used t/f 11/0.4 kv 25 kva from site to store center distance approximate 20km. with Loading Unloading Complete as per direction of Engineer in charge.
Cartage of Other old and used Stock Material from site to store center distance approximate 20km. with Loading Unloading Complete as per direction of Engineer in charge.
Annexure-B (SUPPLY ITEMS)
Supply of Holding Clamp for STP SP-55 pole M.S flate 50x6 mm N&B
Supply of bracing clamp for STP SP-55 pole M.S flate 50x6 mm N&B for holding
Supply of F-Clamp with bracket with nut & bolt
Supply of Stay Clamp single ended SP-55 pole M.S flate 50x6 mm N&B
Supply of Aluminium lugs for 25/63/100 kva T/F
Supply of aluminium lugs for 250/400/ 500 kva T/F
Supply of Eye Bolt 12x110 mm.
Supply of Turn Buckle for Guarding
Supply of 11 KV cable jointing kit 3x240 sq. mm O/D with lug
Supply and laying of C-Class Heavy duty GI pipe as IS 1239 at with support hangers, fastners, complete in all respects. 100 mm dia
Supply of Nut bolt off size
Supply of 11 KV HT tape
Supply of SMC Three Phase L.T. Distribution Box with inbuilt panal lock, Al bus bar RYB 25x6mm., Al Busbar N. 40x6mm. for connection of L.T. consumer ( Sintex/RMC make or other ISO reputed company ) with Panel Lock with key) ( As per drawing attached )
Supply of L.T. Arial Bunched Cable (3x120+1x70 +1X16) sq.mm
Supply of LT armored XLPE cable 3.5 x 400 sq. mm branded ISI marked (havells/kei /polycab )
Supply of Cable 1X25/1X16 sqmm Insulated Lead
Supply of Shear Head type Insulated Piercing Connector Suitable for Jumpering for Line to Line to taping 120sq mm-120 sq mm
Supply of Shear Head type Insulated Piercing Connector Suitable for Jumpering for Line to Line DB taping 120sq mm-25 sq mm
Supply of Dead End Clamps with I Hook. As per drawing and UPCL Specification.
Supply of Suspension Clamps with I Hook. As per drawing and UPCL Specification.
Supply of L.T. Bare Neutrel Connectors PG Clamp 70sq mm to 25 sq mm (For Line toDB)
Supply of L.T. Bare Neutrel Connectors PG Clamp 70sq mm to 70 sq mm (For Line to Line)
Supply of M.S. Half Clamp for L.T. Distribution Box
Supply of M.S.Clamp With Nut & Bolts For Ded End Clamps Assamble
Supply of M.S.Clamp With Nut & Bolts For Suspension Clamps Assamble
Supply of Lug Size 0 type 25 mm (for connecting Cable PVC 4x25)
Supply of Al. lug 120 sq. mm (ISI MARK)
M/S AGARWAL CONSTRUCTIONS
RAVI CONSTRUCTION CO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .