| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.0 LAccepted-AOC | ₹22.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹22.2 LRejected-AOC ALAPATKIZHAKKUDAN HOUSE ATTORE KUTTUR P O THRISSUR | THRISSUR | THRISSUR | KERALA | ₹22.2 L | L2 | Rejected-AOC L2 |
| 3 | L3₹22.8 LRejected-AOC CHANKANHOUSE POTTA P O CHALAKUDY THRISSUR DISTRICT PIN 680307 | THRISSUR | KERALA | 680307 | ₹22.8 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | JOSE K C L2 | manoj.k L1 | C.J.Shaju L3 |
|---|---|---|---|---|---|---|
| 1.00APPENDIX A SIDE PROTECTION WORK | ||||||
| 1.00 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 5.5 | cum | 1,047 ₹5,758.50 | 1,034.49 ₹5,689.70 | 1,076.16 ₹5,918.88 |
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 7.17 | cum | 1,360 ₹9,747.12 | 1,343 ₹9,625.28 | 1,397.12 ₹10,013.16 |
| 1.00 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 1 | each | 2,147 ₹2,147 | 2,120 ₹2,120 | 2,205.94 ₹2,205.94 |
| 1.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 7 | each | 330.44 ₹2,313.08 | 326 ₹2,282 | 339.43 ₹2,376.01 |
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 140 | sqm | 15.9 ₹2,226 | 15.7 ₹2,198 | 16.34 ₹2,287.60 |
| 1.01 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 48.83 | cum | 314.76 ₹15,368.16 | 310.79 ₹15,174.32 | 323.06 ₹15,773.40 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 48.83 | cum | 6,941.28 ₹3.4 L | 6,858 ₹3.3 L | 7,130.08 ₹3.5 L |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 717.9 | sqm | 337.89 ₹2.4 L | 333 ₹2.4 L | 347.08 ₹2.5 L |
| 1.01 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 156.4 | cum | 7,319 ₹11.4 L | 7,226.9 ₹11.3 L | 7,518.07 ₹11.8 L |
Tender Value
₹25.4 L
EMD Value
₹50,000
Closing Date
7 Mar 2026, 6:00 pmClosed
Executive Engineer ,
Executive Engineer , Irrigation Division Thrissur
Side protection works to Thanikudam distributory canal between chainage 9/400 to 9/800 km
2026_Irrig_841511_1
IRR/IA/TR/771/2026_5_1_1/1
Open Tender
Civil Works - Canal
Thrissur
Please refer tender documents
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
15 May 2026
27 Feb 2026
9 Mar 2026
27 Feb 2026
7 Mar 2026
27 Feb 2026
APPENDIX A SIDE PROTECTION WORK
15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix)
2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
OD47719/2025-2026:Supplying and fixing in correct lines and levels granite stone of any size including engraving letters, fixing on the wall, board work etc. complete as per standard specifications and the direction of Engineer in-charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 2.48 MB
Affidavit.pdf
Other Document • 0.02 MB
FormOfTender.pdf
Other Document • 0.03 MB
BOQ_1419094.xls
BOQ • 0.31 MB
PAgreement.pdf
Other Document • 0.05 MB
EPayment.pdf
Other Document • 0.01 MB
Integrity.pdf
Other Document • 0.02 MB
Download all tender documents and submit your bid