Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.3 LAccepted-AOC CHAMUNDA VIHAR RAMNAGAR ROAD KASHIPUR CAPITAL | ₹48.3 L | L1 | Accepted-AOC Overall accepted as L1 bidder |
| 2 | L2₹48.9 LRejected-Finance GURGAON | GURUGRAM | HARYANA | 122001 | ₹48.9 L | L2 | Rejected-Finance As L2 bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical The bidder did not qualifies TQR |
| Sl No | Description | Qty | Unit | M/s Bharat Construction and Trading Company L1 | GLOBE TECH SOLUTIONS CONSULTANCY PVT LTD L2 |
|---|---|---|---|---|---|
| 1.00Part-A (Supply) | |||||
| 2.00 | 145 kV Staggered Isolator (Tandem) 1250 Amps | 8 | Nos. | 5,06,596 ₹43.0 L | 5,08,500 ₹43.1 L |
| 3.00 | Staggered (Tandem) Isolator Clamp | 54 | Nos. | 1,489 ₹85,230.36 | 1,850 ₹1.1 L |
Updated dates
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
11 Feb 2026, 5:00 pmClosed
Chief Engineer
Office of CE(OandM), PTCUL, Haldwani
Replacement of old deteriorated 132KV Tandem/Staggered isolator at 132KV S/s, Kichha under 220KV OandM Division, PTCUL, Pantnagar
2025_PTC21_89293_1
CE/OandM/PTCUL/HLD/15/2025-26
Open Tender
Electrical Works
180 days
132KV S/s, Kichha
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
EE, 220KV OandM Division, PTCUL, Pantnagar
₹1.7 L
Office of CE(OandM), PTCUL, Haldwani
25 Apr 2026
29 Nov 2025
12 Feb 2026
29 Nov 2025
11 Feb 2026
29 Nov 2025
4 Feb 2026
145 kV Staggered Isolator (Tandem) 1250 Amps
Staggered (Tandem) Isolator Clamp
Item Rate
Description of materail
Part-B (Erection)
Dismanling of old, rusted and defective 145 kV Staggered Isolator (Tandem) 1250 Amps
145 kV Staggered Isolator
Work of opening of the Jumpers, electrical connections and earth strip by welding,cutting and bending etc including cost of all labaour T&P and welding cost as per direction of engineer incharge.
Fixing of new clamps and connectors for connecting the jumpers for proper alignment and with proper safety including cost of all labour T&P etc work complete in all respect.
Work of Connecting of the Jumpers, electrical connections and earth strip by welding, cutting and bending etc after erection of staggered isolator including cost of all labaour T&P and welding cost as per direction of engineer incharge.
Item Rate
Particulars
Total Part-B (Erection) from BoQ2 sheet WITHOUT GST
Add GST* Amount on (Total of Part-A + Total of Part-B above)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
TenderDocument15.pdf
Tender Documents • 1.19 MB
PQRSheet15.xls
Other Document • 0.14 MB
BOQ_105912.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid