Tender Value
₹5.0 L
EMD Value
₹6,000
Closing Date
19 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Sujlam Suflam Division No.2 Visnagar
Restoration Work for Valve Kundi at Devinapura Ta.Dist Mehsana of BSPL Network
363178
11/2026-2027
Open
Civil Works - Canal
Works
Mehsana
13 documents required · 12 mandatory · 1 optional
₹900
EXECUTIVE ENGINEER SUJALAM SUFALAM DIVISION NO 2 VISNAGAR
₹6,000
4 Nov 2026
4 Nov 2026
4 Nov 2026
19 Nov 2026
4 Nov 2026
120 days
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Name Of Work:- Restoration Work for Valve Kundi at Devinapura Ta.DistMehsana of
Item Description of Item (with brief Quantity Unit Rate Amount
No specificationand reference to book In
ofspecifications) figures
1 Earth work in embankment from
borrow pits in all sorts of soil and soft
murrum or other suitable strata as
directed including breaking the clods
and dressing to the design sections
including cutting the proud section with
lead as under and all lift including
clearing the site including dewatering
etc. comp.(A) For all canal capacity. (a)
2 Excavation in all sorts of soil (Including
wet And slushy condition of Soil) with
yellow, sandy, gravelly soils including
soft murrum And H.M. including
sorting and stacking and depositing the
excavated stuff in uniform layers as
and where directed up to lead of 30 mt. 13.52 Cum. 79.00
and lift as showing below including
clearing the site etc. comp. (Including
(B) For Foundation Trenches of CD
(a) 0 to 3 Mt depth
3 Providing and laying foundation
concrete of proportion as under by
using cement, sand and machine
crushed coarse aggregate laid in situ
including necessary temping, smooth 4 Cum. 4166.00
finishing, watering and curing as
directed with all leads and lifts
4 Providing and laying C.C. 1:2:4 grade
using cement, sand and crushed
kapachi including providing and
erecting necessary from work
centering, vibrating, smooth finishing,
watering and curing as directed with
all leads And lift etc. comp.
(a) Sub Structure
5 Providing and Supplying in standard
length ISI mark rigid unplasticised PVC
pipes suitable for potable water with
ring fit joint including cost of rings, as
per IS Specification no.4985/1988
including all local and central taxes,
transportation, freight charges, octroi,
inspection charges, loading, unloading,
conveyance to departmental stores,
and including cost of jointing material
etc. complete.[3.1.B Test Pressure
6 Lowering, laying, fixing and jointing
PVC/uPVC/cPVC pipes and specials of
following class and diameter including
cost of conveyance from stores to site
of works including cost of labour,
material, cement solvent, giving
satsfactory hydraulic testing as per ISI
7 Providing and laying HYSD/TMT Fe
415 steel bar reinforcement for R.C.C.
works and anchor bar with providing
binding wires including cutting,
bending, welding, binding in position
hooking, placing in position with all
leads & lifts etc. complete.(C) TMT Fe
8 Providing and Supplying ISI mark CI
D/F Sluice Valves as per IS:14846
(Latest Edition) of following class and
diameter including all taxes,insurance,
transportation, freight charges, octroi,
inspection charges, loading, unloading,
conveyance to departmental stores,
stacking etc. complete. [PN-1 With
hand wheel/ cap operated (PD type
short body)] (9) 300 mm
9 Lowering, laying and jointing in
position following C.I. / D/F Reflux
valves, Butterfly valves, Sluice valves
and Air valves including cost of all
labour , jointing material, including nut
bolts and giving satisfactory hydraulic
testing etc. complete[15.a Sluice
10 Providing laying and fixing 20mm dia.
Grill 22 cms c/c including necessary
openings support, oil painting with 1 8.82 Sqmt 2198.00
coat primer and two coats of approved
oil paint etc. completed.
11 Providing and fixing 20mm dia M.S. bar
1 m long for steps in canal structures
including cutting, bending, painting
I/We am/are willing to carry out the work ................... % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item (with brief Quantity Unit Rate Amount
No specificationand reference to
book ofspecifications) In In
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure)
(C)Net Tendered Amount (A-B) (in figure)
1 The Contractor shall exhibit a board with brief details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R. NO.: MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design, the cost of difference of
cement consumption will be deducted from the rate of original item at the rate of input
rate i.e. Rs. 5234.00/MT
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.Letter Nivida No.11 of 2026-27.pdf
2.Detail Nivida.pdf
3.Nivida 11 of 2026-27 guj and eng.pdf
4.SBD Devinapura.pdf
5.boq devinapura.pdf
6.Annexure A.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .