| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-Finance MANJAPRA 683 581 EKM DIST | ERNAKULAM | KERALA | 683581 | ₹3.8 L | L1 | Accepted-Finance Lowest |
| 2 | L2₹3.9 L+₹6,737.81 (1.75%)Accepted-Finance 133 1 UDIYAR VILLAI COLACHEL KALKULAM KANYAKUMARI TAMIL NADU PIN 629251 | COLACHEL | KANYAKUMARI | TAMIL NADU | 629251 | ₹3.9 L+₹6,737.81 (1.75%) | L2 | Accepted-Finance Second lowest |
| 3 | L3₹4.5 L+₹62,170.09 (16.1%)Accepted-Finance | ₹4.5 L+₹62,170.09 (16.1%) | L3 | Accepted-Finance Highest |
| Sl No | Description | Qty | Unit | P J BIJU L1 | EXPERT EDGE CONSTRUCTIONS L3 | Franklin Sundarabai Rajamani L2 |
|---|---|---|---|---|---|---|
| 1.00 | 2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge.All kinds of soil | 24 | cum | 241.58 ₹5,797.92 Lowest | 280 ₹6,720 | 250 ₹6,000 |
| 2.00 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including
getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 4.93 | cum | 337.31 ₹1,662.26 Lowest | 390 ₹1,921.92 | 350 ₹1,724.8 |
| 3.00 | 4.1.8
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm
nominal size derived from natural sources) | 3.47 | cum | 7,438.67 ₹25,827.06 Lowest | 8,700 ₹30,206.4 | 8,000 ₹27,776 |
| 4.00 | 4.1.2
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.08 | cum | 9,152.72 ₹37,343.1 Lowest | 10,700 ₹43,656 | 9,800 ₹39,984 |
| 5.00 | 4.3.1
Centering and shuttering including strutting, propping etc. and removal of form work
for:Foundations, footings, bases for columns | 12.48 | sqm | 362.1 ₹4,519.01 | 420 ₹5,241.6 | 320 ₹3,993.6 Lowest |
| 6.00 | 51.18.12.8
Providing and fixing G.I. pipes complete with G.I. fittings (Cost of fittings to be paid
separately) External work - 80 mm nominal dia | 31.4 | metre | 946.82 ₹29,730.15 Lowest | 1,110 ₹34,854 | 990 ₹31,086 |
| 7.00 | 51.18.12.7
Providing and fixing G.I. pipes complete with G.I. fittings (Cost of fittings to be paid separately) External work - 65 mm nominal dia | 22.8 | metre | 769.82 ₹17,551.9 Lowest | 900 ₹20,520 | 800 ₹18,240 |
| 8.00 | 50.10.1
Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers
etc. complete | 379.83 | kg | 216.54 ₹82,247.96 | 250 ₹94,957 | 215 ₹81,663.02 Lowest |
| 9.00 | 50.10.2
Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 207 | kg | 175.4 ₹36,307.8 | 200 ₹41,400 | 170 ₹35,190 Lowest |
| 10.00 | 13.52.1
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | 65.84 | sqm | 237.19 ₹15,615.64 Lowest | 270 ₹17,775.72 | 240 ₹15,800.64 |
Tender Value
₹4.1 L
EMD Value
₹10,264
Closing Date
4 Jul 2026, 5:00 pmClosed
ACF NSC Kalady
Nature Study Centre, Kalady
Construction of Elephant Calf Cage attached to Veterinary Hospital at Abhayaranyam under NSC Kalady during 2026-27
2026_FD_856913_1
KFDDO/39580/2026/NSCKLDY/B
Open Tender
Civil Works - Others
Item Rate
30 days
Kaprikkad, Abhayaranyam
Please Refer Tender document
5 documents required · 5 mandatory
₹969
₹10,264
18 Aug 2026
20 Jun 2026
8 Jul 2026
20 Jun 2026
4 Jul 2026
20 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge.All kinds of soil | - | cum | 257.63 | - |
| 2 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including
getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | 359.72 | - |
| 3 | 4.1.8
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm
nominal size derived from natural sources) | - | cum | 7,932.89 | - |
| 4 | 4.1.2
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 9,760.82 | - |
| 5 | 4.3.1
Centering and shuttering including strutting, propping etc. and removal of form work
for:Foundations, footings, bases for columns | - | sqm | 386.16 | - |
| 6 | 51.18.12.8
Providing and fixing G.I. pipes complete with G.I. fittings (Cost of fittings to be paid
separately) External work - 80 mm nominal dia | 1 | metre | 1,009.73 | ₹1,008.72 |
| 7 | 51.18.12.7
Providing and fixing G.I. pipes complete with G.I. fittings (Cost of fittings to be paid separately) External work - 65 mm nominal dia | - | metre | 820.97 | - |
| 8 | 50.10.1
Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers
etc. complete | 0.2 | kg | 230.93 | ₹45.96 |
| 9 | 50.10.2
Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | - | kg | 187.05 | - |
| 10 | 13.52.1
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | 0.4 | sqm | 252.95 | ₹100.93 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.55 MB
TD.pdf
Tender Documents • 1.10 MB
pay.pdf
Other Document • 0.41 MB
prili.pdf
Additional Documents • 0.04 MB
BOQ_1448405.xls
BOQ • 0.24 MB
corri.pdf
PDF • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .