Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC OLD GM OFFICE HALDIBADI CHIRIMIRI DISTT MCB C G 497451 | CHIRIMIRI | KOREA | CHHATTISGARH | 497451 | L1 | Accepted-AOC As being L1 and qualifies eligibility criteria | |
| 2 | Rejected-Technical | - | Rejected-Technical Not taken for technical evaluation as not being L1 | |
| 3 | Rejected-Technical WARD NO 15 PANKHA DAFAI HALDI BADI DISTT MCB CHIRIMIRI CG PIN 497451 | CHIRIMIRI | MCB | CG | 497451 | - | Rejected-Technical Not taken for technical evaluation as not being L1 |
Tender Value
₹8.3 L
EMD Value
₹10,400
Closing Date
7 Jul 2023, 5:00 pmClosed
Staff Officer (EnM), Chirimiri Area
Office of the General Manager, SECL Chirimiri Area , P.O. - West Chirimiri, Distt.- MCB (C.G.) 497773
Installation of 640 mtr. 1000mm belt conveyor (Discharge point 31S and Tail end 17S/20E) with drive head and loop take arrangement in Seam-V, NCPH Colliery R-6 Mine.
2023_SECL_282049_1
SECL/GM/CHRM/EM/e-Tender/ 23-24/02 dtd. 21.06.2023
Open Tender
Miscellaneous Works
Item Rate
120 days
NCPH New Mine, Chirimiri Area
As per NIT
3 documents required · 3 mandatory
₹10,400
18 Sept 2023
22 Jun 2023
8 Jul 2023
22 Jun 2023
7 Jul 2023
23 Jun 2023
23 Jun 2023 - 30 Jun 2023
Amount
Transportaion/Carraige of steel structure, drive cum discharge & tail drum by manual labour including loading, unloading and stacking the same for a lead of 50 mtr. in underground.
Transporting of 1000 mm PVC belting from surface to UG upto end of Track Line for lead of 1 Km.Total average length of site from surface is 1200 mtr.=1 time,hence increase in rate=15%(every additional lead of 500 m or part thereof would be 15% enhance in rate.
Installation of 1200 mm size Drive drum with loop take up
Installation/Erection of steel structure for belt conveyor or installation of belt conveyor or Installation of belt structure of 1000 mm size in UG Gallery of 100 mtr. length
Placing/Changing 1000 mm PVC belting on conveyor structure
Dismentling, Transporting and installation of 1000mm size tali end drum,drum base,tail end guard ,side plate/loading chute, decking plate in UG with in lead of 100 mtr.
Total impact of GST for the purpose of CTC
SANJEEV KUMAR PANDEY
Om prakash kashyap
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_292045.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .