Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.3 CrAdmitted-Finance GROUND FLOOR SURAJ APPARTMENT STATION ROAD PARMANANDPUR PO BHAWANIPATNA DIST KALAHANDI ODISHA 766001 | BHAWANIPATNA | KALAHANDI | ODISHA | 766001 | L1 | Admitted-Finance | ||
| 2 | L2₹17.6 Cr+₹33.0 L (1.90%)Admitted-Finance KHATA NO 930 38 WARD NO 02 NEAR JAGANNATH TEMPLE DHARMAGARH 766015 DIST KALAHANDI ODISHA | DHARMAGARH | KALAHANDI | ODISHA | 766015 | L2 | Admitted-Finance | ||
| 3 | Rejected-Technical AT KALIDASPUR PO BALIMED PS NAIKANIDIHI DIST BHADRAK PIN 756131 | BHADRAK | ODISHA | 756131 | - | Rejected-Technical The bidder did not extend her bid validity |
Tender Value
₹16.5 Cr
EMD Value
₹16.5 L
Closing Date
12 Nov 2025, 5:00 pmClosed
CE AND BM MB BURLA
Chief Engineer and Basin Manager Mahanadi Basin Burla At PO Burla Dist Sambalpur Pin 768017
Renovation of Canal System of Hirakud Dam Project of Remunda Canal Section Burla Irrigation Division Burla
2025_CEBBU_119930_1
CE AND BM MB 26-2025-2026(Online)
Open Tender
Civil Works - Canal
Percentage
At Remunda Block Bheden Dist Bargarh
As per DTCN
2 documents required · 2 mandatory
₹10,000
₹16.5 L
Yes
19 Mar 2026
23 Oct 2025
13 Nov 2025
23 Oct 2025
12 Nov 2025
23 Oct 2025
23 Oct 2025 - 12 Nov 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 50 meters outside the periphery of the area with all leads, lifts, sundries, T&P required for the work etc. complete as per the direction of Engineer-in-charge. | 0.29 | Sqm | 1 | ₹0.29 |
| 2Dismantling and removing cement concrete including stacking, the useful materials for reuse and removing debris abate from worksite with all lead etc. complete as per direction of Engineer-in-charge. | |||||
| 3 | Earthwork in Oridinary soil within initial lead of 50M. and initial lift of 1.5M. Including rough dressing, levelling the bed and depositing the excavated earth away from worksite etc. complete as per specification and direction of the Engineer-in-charge. | 1 | Cum | 1 | ₹1 |
| 4 | Earthwork excavation in all kind of soil including dressing and levelling the bed and depositing the excavated materials away from the work site with all leads, lifts, sundries, T&P required for the work etc complete as directed by the Engineer in Charge | 1 | Cum | 1 | ₹1 |
| 5 | Filling in foundation and plinth with sand including cost, conveyance & royalty of all materials to the work site including watering & ramming with all leads, lifts, sundries & T&P etc . complete, as per direction of Engineer-in-Charge. | 1 | Cum | 1 | ₹1 |
| 6 | Cement concrete M-15 using 40 mm & down graded H.G.C.B. Chips free from weathered skin surface including cost, carriage royalty and taxes of all materials to the work site mixing and laying of concrete in position and compacted properly with all leads, lifts, sundries, T & P required for the work etc. complete as per the Direction of the Engineer in charge. | 1 | Cum | - | - |
| 7Cement concrete M-20 with hard granite coarse aggregates of maximum nominal size 20mm and down graded free from weathered skin including cost, conveyance, royalty and other taxes of all materials to the work site, mixing and laying of concrete in position & compacted properly with all leads, lifts, sundries with all hire & running charges of machineries such as concrete mixer, vibrator etc. required for the work site with proper compaction and curing etc. complete as per the direction of Engineer-in-charge. | |||||
| 8 | Rigid smooth centering & shuttering for C.C works including false work & dismantling after casting and clearing the debries from worksite with all leads,lifts, sundries including cost, conveyance, labour T&P etc. complete as directed by Engineer-in-charge . A)-For Plinth Bend, Footing Base | 1 | Sqm | 1 | ₹1 |
| 8.1 | B)-For Floor & Roof Slab | 1 | Sqm | - | - |
| 8.2 | C)-For RCC Wall | - | Sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.95 MB
DTCNRemunda.pdf
Tender Documents • 7.58 MB
BOQ_557513.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .