Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.3 LAdmitted-Fee/PreQual/Technical/Finance | -33.50% | ₹3.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.3 L+₹1,999.88 (0.60%)Admitted-Fee/PreQual/Technical/Finance | -33.10% | ₹3.3 L+₹1,999.88 (0.60%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.4 L+₹12,449.27 (3.74%)Admitted-Fee/PreQual/Technical/Finance | -31.01% | ₹3.4 L+₹12,449.27 (3.74%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹3.5 L+₹16,999 (5.11%)Admitted-Fee/PreQual/Technical/Finance | -30.10% | ₹3.5 L+₹16,999 (5.11%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹3.6 L+₹23,098.65 (6.95%)Admitted-Fee/PreQual/Technical/Finance | -28.88% | ₹3.6 L+₹23,098.65 (6.95%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
4 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW GANDERBAL
EXECUTIVE ENGINEER REW GANDERBAL
Construction of children park at tulbagh Repora A Block Lar ABDP
2026_RDPR_318112_20
E NIT No. 69/2026-27 of REW Ganderbal
Open Tender
Civil Works
Percentage
30 days
RDD AND PR
Please refer Tender documents.
3 documents required · 3 mandatory
₹400
EXECUTIVE ENGINEER REW GANDERBAL
₹10,000
14 Aug 2026
27 Jul 2026
5 Aug 2026
27 Jul 2026
4 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by Mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed by EiC | 402 | cum | 187.3 | ₹75,294.6 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 37.5 | cum | 5,733.6 | ₹2,15,010 |
| 2.1 | 20% plum | 23.3 | cum | 1,000 | ₹23,300 |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. | 139.81 | sqm | 286.35 | ₹40,034.59 |
| 4 | Providing and applying 12 mm thick cement sand plaster on the rough side of single or half brick wall in mix 1:6 | 234.57 | sqm | 266.2 | ₹62,442.53 |
| 5 | Palcing and fixing of RCC reinforcement steel including binding bending complete Job | 653 | Kg | 103 | ₹67,259 |
| 6 | Carriage of materials for an average lead of 15kms for sand and bajri , HL if any ( to be paid A.P.A) | 47 | cum | 340 | ₹15,980 |
| 7 | signboard photographs, weep holes and unforseenitem incl site clearance | 1 | job | 650 | ₹650 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
BOQ_1046368.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .