Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAccepted-Finance | L1 | Accepted-Finance Lowest | |
| 2 | L2₹13.8 L+₹2.0 L (17.1%)Rejected-Finance VILLAGE AMARU PO SAI TEH BADDI DISTT SOLAN H P | BADDI | SOLAN | HIMACHAL PRADESH | L2 | Rejected-Finance Highest | |
| 3 | L3₹14.7 L+₹2.8 L (24.0%)Rejected-Finance | L3 | Rejected-Finance Highest | |
| 4 | L4₹15.0 L+₹3.2 L (26.9%)Rejected-Finance | L4 | Rejected-Finance Highest | |
| 5 | L5₹16.0 L+₹4.2 L (35.4%)Rejected-Finance VILL P O PAROUR TEHSIL PALAMPUR DISTT KANGRA H P | KANGRA | HIMACHAL PRADESH | 176001 | L5 | Rejected-Finance Highest |
Tender Value
₹20.0 L
EMD Value
₹40,000
Closing Date
3 Dec 2021, 5:00 pmClosed
Divisional Forest Officer, Palampur
Divisional Forest Office, Palampur
Construction of Rain Water Harveting Structure (Check Dam ) at Nallah at Parour , under Palampur Division during 2021-22
2021_FD_53810_1
2665/G
Open Tender
Civil Works
Item Wise
120 days
Parour
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Payable To DFO Palampur
₹40,000
17 Dec 2021
20 Nov 2021
4 Dec 2021
20 Nov 2021
3 Dec 2021
20 Nov 2021
Amount
Excavation in foundation trenches etc. ( in pipe and pits ) in all kind of soil such as pick work , jumper work , blasting in soft / hard rock , chiselling / wedging out of rock / where blasting probihited ) saturated soil stacking the excavated soil as directed by Engineer - in Charge clear from the edge of excavation and then retrning thee stacking soil in 15 cm layers when required into plinth side of foundation etc. Consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engneer - in - Charge in all lead and lift ( including dewatering) a) Pick work
b) Jumper Work
Providing and laying cement concrete 1:4:8 (1Cement : 4 Sand : 8 graded stone aggregate 40mm nominal size) and curing complete exluding cost of centring and shuttering in foundation and plinth.
Providing and laying of form work with steel plates 3.15 mm thick welded with angle iron in frame 30 x30 x5 mm , so as to give a fair finish incluing centering , shuttering , shuttering and pro pping etc . With wooden battens and ballies height of propping and centering below supporting floor two level . Verticle surface such as walls ( any thickness ) Partitions and the like i/c attached pillasres butteresses , linth & stringd courses and the like
Providing and laying cement concrete 1:5:10 with 15 % plum (1Cement : 5 Sand : 10 graded stone aggregate 40mm nominal size) and curing complete exluding cost of centring and shuttering in foundation and plinth.
Wire creat of G.I Wire filled with boulder with square cut face against the wire ( wire crates to be measured & paid for seperately ) for Launching appron
Wire crates of G.I. Wire filled with boulder with square cut face againsed the wire ( boulder filling to be measured & paid for seperately ) for Launching apron G.I. Wire 5.00 mm thick corresponding to SWG 8(n15 x15 CMs mesh
Providing and laying of cement concrete 1:2:4 ( 1 Cement : 2 Sand : 4 graded stone aggregate 20 mm nominal size ) and curing complete excluding the cost of reinforcement and form work in wall in all lead and lift
Providing Toe Steel reinforcement for RCC work including bending , binding & placicng in possition complete up to floor level.
RAJINDER SINGH
Harvinder Singh
Prithvi Raj Government Contracter
Sahil Sharma
R.K ENTERPRISES
Rajeev Kumar
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .