Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC | ₹7.1 L | L1 | Accepted-AOC Agreement executed with Sri. Muneer.P |
| 2 | L2₹8.6 LRejected-AOC | ₹8.6 L | L2 | Rejected-AOC L2 |
| 3 | L3₹8.9 LRejected-AOC | ₹8.9 L | L3 | Rejected-AOC L3 |
| 4 | L4₹9.3 LRejected-AOC PARAMBIL HOUSE KONDURKKARA P O | ₹9.3 L | L4 | Rejected-AOC L4 |
| 5 | L5₹9.9 LRejected-AOC | ₹9.9 L | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | NOUSHAD POOVATHINGAL L6 | MUNEER P L1 | FAHAD P.K. L4 | M.V.SAKKEER HUSSAIN L3 | MUHAMMED ALI P.S. L2 | ABISHEK JAYAPRAKASH L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Appendix B Pipe line work | |||||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 7,700 | sqm | 14.73 ₹1.1 L | 10.23 ₹78,771 | 13.29 ₹1.0 L | 13 ₹1.0 L | 12.4 ₹95,480 | 14.19 ₹1.1 L |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 4,375 | cum | 208.68 ₹9.1 L | 144.89 ₹6.3 L | 188.35 ₹8.2 L | 180 ₹7.9 L | 175.72 ₹7.7 L | 200.95 ₹8.8 L |
Tender Value
₹12.7 L
EMD Value
₹31,680
Closing Date
3 Mar 2026, 3:30 pmClosed
AJAYAKUMAR V
Assistant Executive Engineer Office of the AEE, MI Subdivision, Shoranur
GENERAL-NAVAKERALA SADASSUPETITIONS-2023-24-Cleaning and De siltation of Care Irrigation project in Muthuthala panchayath of Palakkd district-General Civil Work
2026_Irrig_840098_1
IRR/IA/TR/977/2024_5_7_5/1
Open Tender
Civil Works - Lift Irrigation Schemes
180 days
Muthuthala
Please refer tender documents.
7 documents required · 7 mandatory
₹2,760
₹31,680
29 Apr 2026
24 Feb 2026
5 Mar 2026
24 Feb 2026
3 Mar 2026
24 Feb 2026
Appendix B Pipe line work
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1415972.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.85 MB
preliminaryagreement.pdf
Tender Documents • 0.11 MB
integritypact.pdf
Additional Documents • 0.05 MB
formoftender.pdf
Additional Documents • 0.18 MB
affidavitformandepayment.pdf
Additional Documents • 0.08 MB
BOQ_1415972.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid