Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC | ₹4.8 L | L1 | Accepted-AOC Accept |
| 2 | L2₹4.8 LRejected-Finance | ₹4.8 L | L2 | Rejected-Finance More than estimate value. Rejected |
| Sl No | Description | Qty | Unit | K SARAVANAN L2 | THANGARAJU INDIRAJITH L1 |
|---|---|---|---|---|---|
| 1.00 | Removing the burst for following PVC pipe from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including jointing and cost of refilling the pipe line with water for retesting the pipe line ete complete (including cost of 1 mtr sound pipe and joiting materials and earth work 1.5mtr length & up to 2 mtre depth ) and as directed by the departmental officers. 63mm ( 2 inches) | 20 | Nos | 720 ₹14,400 | 680 ₹13,600 Lowest |
| 1.01 | 90mm (3 inches) | 60 | Nos | 1,050 ₹63,000 | 1,038 ₹62,280 Lowest |
| 1.02 | 110mm (4 inches) | 20 | Nos | 1,275 ₹25,500 | 1,255.5 ₹25,110 Lowest |
| 1.03 | 140mm (5 inches) | 15 | Nos | 1,850 ₹27,750 | 1,802.5 ₹27,037.5 Lowest |
| 1.04 | 160mm (6 inches) | 10 | Nos | 1,955 ₹19,550 | 1,948.5 ₹19,485 Lowest |
| 1.05 | 200mm (8 inches) | 5 | Nos | 3,000 ₹15,000 | 2,977.3 ₹14,886.5 Lowest |
| 2.00 | Removing the burst for following CI pipes from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including jointing and cost of refilling the pipe line with water for retesting the pipe line etc complete (including cost of jointing materials and earth work 1.5mtr length & up to 2 mtr depth and as directed by the departmental officers. 150mm (6 Inches) | 15 | Nos | 3,050 ₹45,750 | 3,030 ₹45,450 Lowest |
| 2.01 | 200mm (8 Inches) | 15 | Nos | 4,250 ₹63,750 | 4,227 ₹63,405 Lowest |
| 3.00 | Removing the burst for following AC pipes from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including jointing and cost of refilling the pipe line with water for retesting the pipe line etc complete (including cost of jointing materials and earth work 1.50mtr length & up to 2 mtr depth) and as directed by the departmental officers.150mm (6 Inches) | 15 | Nos | 2,100 ₹31,500 | 1,615 ₹24,225 Lowest |
| 3.01 | 200mm (8 inches) | 15 | Nos | 2,285 ₹34,275 | 2,270 ₹34,050 Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
3 Jul 2026, 3:00 pmClosed
The Commissioner, Municipal Office, Thuraiyur
The Commissioner, Municipal Office, Thuraiyur
Maintenance of Water supply and leakage in Thuraiyur Municipality
2026_MAWS_682697_1
3381/2026/E1
Open Tender
Water Supply/Equipments/Meter/Drilling/Boring
Works
30 days
Thuraiyur Municipality
..
2 documents required · 2 mandatory
₹0
₹5,000
Municipal Office, Thuraiyur
22 Jul 2026
24 Jun 2026
3 Jul 2026
24 Jun 2026
3 Jul 2026
24 Jun 2026
29 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing the burst for following PVC pipe from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including jointing and cost of refilling the pipe line with water for retesting the pipe line ete complete (including cost of 1 mtr sound pipe and joiting materials and earth work 1.5mtr length & up to 2 mtre depth ) and as directed by the departmental officers. 63mm ( 2 inches) | 20 | Nos | - | - |
| 1.01 | 90mm (3 inches) | 60 | Nos | - | - |
| 1.02 | 110mm (4 inches) | 20 | Nos | - | - |
| 1.03 | 140mm (5 inches) | 15 | Nos | - | - |
| 1.04 | 160mm (6 inches) | 10 | Nos | - | - |
| 1.05 | 200mm (8 inches) | 5 | Nos | - | - |
| 2 | Removing the burst for following CI pipes from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including jointing and cost of refilling the pipe line with water for retesting the pipe line etc complete (including cost of jointing materials and earth work 1.5mtr length & up to 2 mtr depth and as directed by the departmental officers. 150mm (6 Inches) | 15 | Nos | - | - |
| 2.01 | 200mm (8 Inches) | 15 | Nos | - | - |
| 3 | Removing the burst for following AC pipes from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including jointing and cost of refilling the pipe line with water for retesting the pipe line etc complete (including cost of jointing materials and earth work 1.50mtr length & up to 2 mtr depth) and as directed by the departmental officers.150mm (6 Inches) | 15 | Nos | - | - |
| 3.01 | 200mm (8 inches) | 15 | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_820664.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_820664.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].